11/10/09 2
Outline
• Electrical Service
• Risk Assessment
• Your Building’s Power System
• Building Power Protection Strategy
• Power Generators
11/10/09 3
Electrical Service
• Taken For Granted• Without it, All Business Stops• Need Plan to:
– Reduce Likelihood of Loss
– Recover From Outage
• Need Process to:– Monitor Lines and Filter Spikes
– Provide Power During Brownout or Outage
– Transition Seamlessly From Normal to Emergency Power
• Must Be Tested
11/10/09 4
Risk Assessment
• Voltage Sags (Brownout)
• Voltage Spike (Over Voltage) – Instantaneous
• Voltage Surge – Short-term Voltage Increase (>3ns)
• Noise
• Blackout
11/10/09 5
Your Building’s Power System
• Equipment is Spread Out All Over Building
• Filter Electricity As It Enters Building
11/10/09 6
Building Power Protection Strategy
• Surge Protectors to Isolate Sensitive Equipment
• Line Conditioning
• UPS
• Generator
• Physical Security
11/10/09 7
Power Generators
• Large Facilities Such as Hospitals, Food Storage, ISPs, etc.
• Proper Sizing, Switching Time
• How Long Will it Need to Run?
• Regular Testing
• Work With Local Utility (Use on Peak Usage Days)
• Regulatory Issues
11/10/09 9
Outline
• Telecommunications Service
• Risk Assessment
• Cabling
• Telephone Switching Room
• Action Plan Steps
11/10/09 10
Telecommunications Service
• System Can Only Handle 10% of Full Usage
• Phone Punch-Down Block to PBX to CO
11/10/09 11
Risk Assessment
• Natural Hazards– Ice Storms, Blizzards, Thunderstorms, Lightning,
Tornadoes, Hurricanes, Floods
• Man-Made– Buried Line Cuts, Accidents, CO Failure
• Telephone Equipment Room– Temperatures, Humidity, Power, Fire, Security
11/10/09 12
Cabling
• Internal Cabling– Locked, Fire Suppression, No Combustibles,
Sufficient Light and Ventilation
• External Cabling– Trace Path, Redundant Paths, Route Separation,
Multiple Vendors
11/10/09 13
Telephone Switching Room
• PBX is a Single Point of Failure
• PBX Requires Backup, Just Like Servers
• IXC POP
11/10/09 14
Action Plan Steps
• Make Inventory of Assets– Equipment Description, Model and Serial Numbers,
Contract Number, Service POCs, Sample Floor Plans, Backup Configuration Data
• Create Wiring Maps• Create Telephone Number Inventory• Identify Critical Circuits
– Develop Restoration Priority List
• Create Migration Plan– Cable, Telephone Equipment Room, Alternate
Communication Methods
11/10/09 16
Outline
• Vital Records• Records Transportation• Records Retention• Media Storage• Risk Assessment• Mitigation• Action Plan Steps• Maintenance Activities• Immediate Actions in an Emergency• Recovery Techniques
11/10/09 17
Vital Records
• Inventory What You Have– Records, Media, Originating Department, Location
• Prioritize
• Store in Safe Location
11/10/09 18
Records Transportation
• Where?
• How?
• Safeguards and Security– Send Copies of Magnetic Media (Not Originals)
11/10/09 19
Records Retention
• Eliminate Obsolete Records
• Identification and Location
• Record Disposition– Shredder
11/10/09 20
Media Storage
• Separate Room or Off-site
• Air Filtration, HVAC, Humidity
• Paper
• Microfilm
• Magnetic Media
11/10/09 21
Risk Assessment
• Water, Smoke, Structural, Fire, Humidity, Heat/Cold, Theft, Sabotage, Insects, Rodents, Magnetic Fields
11/10/09 22
Mitigation
• Fire Detection and Suppression
• Minimize Electrical Equipment
• Environmental Controls
• Proper Markings and Records
• Security
11/10/09 23
Action Plan Steps
• Obtain Damage Containment Supplies– Depends Upon Risk Assessments and Inventory– General Items (Flashlights, Hand Tools, etc.)– Portable Equipment (Wet vacs, Dehumidifiers, Water
pumps, etc.)– Safety Equipment
• Maintenance Activities – Daily, Weekly, Quarterly
11/10/09 24
Immediate Actions in an Emergency
• Initial Damage Assessment
• Use Teams– Damage Containment, Assessment, Shuttle, Triage
• Should Documents be Evacuated?
11/10/09 25
Recovery Techniques
• Water Damage to Paper– Air-Drying, Freeze-Drying, Photocopying, Iron
• Fire Damage to Paper– Photocopy
• Optical and Magnetic Media– Rinse and Transport in Bags of Cold Distilled Water,
Air Dry, Duplicate
11/10/09 27
Outline
• Data
• Risk Assessment
• Creating a Data Recovery Plan
• Planning
• Planning (Continued)
11/10/09 28
Data
• Accounting Files, Customer Lists, Part Lists, Manufacturing Drawings, etc.
• Difficult to Impossible to Recreate
• Device Failure, Application or User Error
• Physical Loss or Logical Loss
• Disaster
11/10/09 29
Risk Assessment
• Key Causes– Viruses, Disasters, Man-Made Outages, Hard Drive
Crash, Laptop Loss, SW Failures, Application Failures, Vendor Failure
• Tactical Issues– Compromised Information, Lost Productivity,
Employee Downtime, Loss of Customer Information
• Strategic Issues– Loss of Opportunity, Increased Operational Cost,
Inability to Support Customers, Increased Systems Cost, Noncompliance Issues
11/10/09 30
Creating a Data Recovery Plan
• Planning
• Identifying Critical Data
• Create Appropriate Policies and Procedures
• Determine Type of Backups
• Develop Recovery Processes
• Plan Testing and Maintenance
11/10/09 31
Planning
• Stakeholders, Business Needs and Requirements• Regulatory Requirements• Current Backup Strategy and Procedures• Off-line Storage vs. Online Backups• Remote Sites
– Cold Site: Open Space
– Warm Site: Systems and Communications
– Hot Site: Active Duplicate of Live Systems
– Mobile Site: Trailer with IT and Communications Equipment
– Mirrored Site: Duplicate Site
11/10/09 32
Planning (Continued)
• Find Data• Categorize It• Policies to Reduce Storage Requirements• Policies for Classification
– Critical, Sensitive, Legally Required, Non-critical
• Backup Types– Regular to Tape or Other Media, Electronic Vault, Remote
Mirroring
• Develop Recovery Processes– Recovery Time Objective, Recovery Point Objective,
Availability, Assurance, Cost, Performance Requirements
11/10/09 36
Risk Assessment
• Single Points of Failure
• Cut Cables, EM Interference, Fire, Water, etc.
• Duplicate Services to each Desktop, Duplicate Access
• Redundant Equipment
• Wireless
• Monitoring Packages
11/10/09 37
Data Storage
• Disk Mirroring
• RAID– Duplexing, Mirroring, Striping, Parity– RAID 0, RAID 1, RAID 2, RAID 3, RAID 4, RAID
5, RAID 10
• Load Balancing
• Network Attached Storage
• Storage Area Network
11/10/09 38
Action Plan Steps
• Document Physical and Logical Network Layout
• Develop Appropriate Backup Strategies
• Identify Single Points of Failure
• Install Redundant Devices
• Monitor the Network
11/10/09 40
Outline
• End-User PCs
• Risk Assessment
• Mobile Devices
• Protecting End-User Vital Records
11/10/09 42
Risk Assessment
• Inventory Assets (HW and SW)• Replacement Schedule (4yrs normal, 2yrs critical)• Surge Protectors, UPS, Environment, etc.• Physical Security
– “Image” the SW, Licenses, Serial Numbers, Manuals, etc.
• Backup Strategies– Storage Volume Requirements, Time Length, Interoperability,
Backup Software
• Backup Technologies– Tape, ZIP, CD, DVD, Internet, Network
11/10/09 43
Mobile Devices
• Security– Keep Out of Sight, Alternate Case, Store in Hotel
Room, Never Leave Unattended, In car Trunk
• Backup Frequently
11/10/09 44
Protecting End-User Vital Records
• Treat Backup Data as Critical Data
• SW Licenses
• Original Media
• Eliminate Date from Surplus Devices
11/10/09 48
Planning For Data Recovery
• What Do You Have, Where is it Located, How is it Used
• Type of Backup, Scheduling, Automatic or Manual, Media, Handling and Storage, Testing
• Standardize• System SW, Application SW, In-house SW• Customer Lists, Contracts, Product Designs, E-
mail Directories, Account Histories• Scheme (AAA, AA, A, B, C, D)• Strategies (Full, Incremental, Differential)