1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH-...
-
Upload
virginia-melton -
Category
Documents
-
view
223 -
download
5
Transcript of 1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH-...
1
REGIONAL GRIDS
QUICK FACTS
2
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
INSTALLED CAPACITY
NORTHERN :- 34,207 MW
EASTERN :- 16,478 MW
SOUTHERN :- 36,921 MW
WESTERN :- 37,100 MW
NORTH-EASTERN :- 2,404 MW
TOTAL 127,110 MW
REGIONAL GRIDS
3
EASTERN REGION
SOUTHERN REGION
WESTERNREGION
NORTHERN REGION
NORTH-EASTERN REGION
THE NATIONAL GRID : PHASE 1
ER
500 MW VINDHYACHAL
WR-NR HVDC B2B LINK
Commissioned in Nov. 1989
BIRPARA(ER) – SALAKATI(NER) 220 KV AC LINK in April 87
(400 KV Malda-Boangigaon in April 2000)
500 MW SASARAM
WR-NR HVDC B2B LINK
Commissioned in June 2001
500 MW GAZUWAKA
ER-SR HVDC B2B LINK
Commissioned in Sep. 1999
(2nd pole in March, 2005)500 MW BHADRAWATI
WR-SR HVDC B2B LINK
Commissioned in Sept. 1997
(2nd pole in March, 1998)
NATIONAL GRID PHASE-1 COMPLETE
4
EASTERN REGION
SOUTHERN REGION
WESTERNREGION
NORTHERN REGION
NORTH-EASTERN REGION
THE NATIONAL GRID : PHASE II
ER
500 MW VINDHYACHAL
WR-NR HVDC B2B LINK
Commissioned in Nov. 1989
BIRPARA(ER) – SALAKATI(NER) 220 KV AC LINK in April 87
(400 KV Malda-Boangigaon in April2000)
RAIPUR(WR) – ROURKELA(ER) 400 KV AC D/C Commissioned Mar. 2003
GORAKHPUR(NR) - MUZZAFARPUR(ER) 400 KV AC D/C Commissioned in Aug. 2006
500 MW SASARAM
WR-NR HVDC B2B LINK
Commissioned in June 2001
500 MW GAZUWAKA
ER-SR HVDC B2B LINK
Commissioned in Sep. 1999
(2nd pole in March, 2005)500 MW BHADRAWATI
WR-SR HVDC B2B LINK
Commissioned in Sept. 1997
(2nd pole in March, 1998)
2000 MW TALCHER(ER)-KOLAR(SR)
HVDC LINK comissioned in SEP 2002
5
Inter Regional Links – Current Capacity
2700 MW2700 MW
1200MW1200MW
2000MW2000MW
1200 MW1200 MW
900 MW900 MW33,782 MW
16,680
34,867 MW
36,031 MW
2433
1850 MW1850 MW
1650 MW1650 MW
Present IR Present IR Capacity = Capacity = 11,500 MW11,500 MW
6
By 2007
Inter-regional capacity - 18,400MW
Name of the link Capacity(MW)
East-North
Patna – Balia 400kV D/c (Quad)
2000
Biharshariff – Balia 400kV D/c (Quad)
2000
Sub-total 4000
East-West
Ranchi- Sipat 400kV D/c with series compensation
1200
Sub-total 1200
East-South
Upgradation of Talcher-Kolar HVDC bipole
500
Sub-total 500
West-North
Gwalior – Agra 765kV S/c (initially ch. at 400kV)
1200
Sub-total 1200
Inter-regional capacity – By
2006
11500
GRAND TOTAL 18400
7
Salakati
Bongaigaon
Birpara
Malda
Dehri
Sasaram
Sahupuri
Allahabad North-eastern
Eastern
Northern
Belgaum
Kolhapur
Budhipadar
Rourkela
Korba
Raipur
Auraiya
Malanpur
Western
Southern
Balimela
Upper Sileru
Chandrapur
Ramagundam
Jeypore
Gazuwaka
Singrauli
Vindhyachal
Talcher
Kolar
Kota
Ujjain
Inter-regional Links – By 2007
Gorakhpur Muzaffarpur
Balia Patna
BiharshariffBalia
SipatRanchi
Agra
Gwalior
Nagjhari
Ponda
2100 MW
6650 MW 1200 MW
3650MW1400 MW
2850 MW
8
11850 MW
1200 MW6050 MW
5500 MW
1400 MW6150 MW
36,700 MW OF INTER-REGIONAL POWER BY 2012
EASTERN REGION
SOUTHERN REGION
WESTERNREGION
NORTHERN REGION
NORTH-EASTERN REGION
INTER-REGIONAL TRANSFER BY END OF 11th PLAN (2012)
4000 MW
Eastern
Region
9
TRANSMISSION VOLTAGE
OWNERSHIP TOTAL
CENTRAL STATE
Circuit Kilometer
+ 500 kV HVDC
4,372 1,504 5,876
765 kV charged at 400 kV
917 409 1,326
400 kV 40,854 22,607 63,461
220 kV 9,220 98,521 107,741
132 kV* 2,152 93,126 95,278
Total 57,515 216,167 273,682
EHV Infrastructure
10
68 0 72 0 76 0 88 0 92 0 96 080 0 84 0
S S
W W
NN
EE
NE
82.5 0
L
GEO POLITICAL
POWER REGIONS
B’DESH-
SRI
NEPALBHUTAN
INDIAINDIA
J&K
HPPUNJAB
HARIANA
RAJASTHANUP
MP
BIHAR
ORISSA
WBGUJARAT
MAHARASHTRA
KARNATAKA
TAMIL
NADU
AP
ASSAM
MNP
MIZTRP
NG
ME
LAKSHADWEEP
A&N
MYANMAR
SKM
PONDICHERY
DELHI
GOA
DIU
DAMAN
NER NER
LANKA
JKND
CTGR
UTTARANCHAL
11
State Govt.
SERC
IPPs SGC CPPs
STU
SLDC
Distn Cos.
Consumers
INDIAN POWER SECTOR - HIERARCHICAL SET UP
CEA
CENTRAL ELECTRICITY AUTHORITY UNDER CENTRAL GOVT.POWER
MINISTRY – PLANNING AND ASSISITING GOVT
CERC
CENTRAL GENERATING STATION
JOINTLY OWNED UNITS CONSTRUCTED BY PUBLIC SECTOR UNDERTAKINGS
CENTRAL GOVT.
RPC
REGIONAL POWER COMMITTEE (FORMERLY REB) – ONE AT EACH REGION
SECRETARIAT TO THE ELECTRICITY BOARDS OF THE REGION
CTU
CENTRAL TRANSMISSION UTILITY
POWERGRID
RLDC
REGIONAL LOAD DESPATCH CENTRE – APEX BODY – RUN BY POWERGRID
CGS
REGIONAL LOAD DESPATCH CENTRE – APEX BODY – RUN BY POWERGRID
12
Ministry of Power, Govt of India
MOP, State Govt.
Central Sector Companies
• Generating Utilities- NTPC, NHPC, NEEPCO, NPCIL
• Transmission Utility-POWERGRID
• Grid Operator -RLDC
• Finance- PFC
• Rural Electrification -REC
Authorities
CEA
R&D
CPRI, NPTI, PSTI
Mega IPPs
State Sector
• Generation
• Transmission
• DistributionState IPPs
CERC
SERC
Appellate
Tribunal
Trading Co.
Pvt. DISCOM
Institutional Framework
13
ALL INDIA MARKET COMPOSITION
5%9%
3%
46%
37%
State Sector long termPPACentral Sector longterm PPAIPP generation
Short Term Trading
Balancing market
(1,27,110 in 2006) AS on 31-07-06
14
3310, 3%6158, 5% 32135, 26%
82227, 66%
HydroThermalNuclearWind & Others
Source wise composition of installed capacity in India (1,27,110 in 2006) AS on 31-07-06
15
Coal
Hydro
Energy Resource Map
16
ALL INDIA GENERATION COMPOSITION
16.8, (3%)
486.1, (83%)
84.5, (14%)
ThermalHydroNuclear
Total Market Size = 587.4 BU
Total Installed Capacity 1,27,110 MW
17
Sector wise consumption of electricity in India
22%
29%
5%
35%
6%
3%
IndustryDomesticRailwaysAgricultureCommercialOthers
Total Installed Capacity 1,27,110 MW
18
SOUTHERN REGIONAL GRID
OVERVIEW
19
SOUTHERN REGION – GEOGRAPHY
ANDHRA PRADESH
TAMIL NADU
KARNATAKA
KE
RA
LA
POPULATION :- 22.5 CRORES ( 22% OF INDIA)
AREA :- 651 (‘000 SQ KM)(19% OF INDIA)
INSTALLED CAPACITY:- 36,921 MW(29.0%)
WEATHER :- South-west monsoon
North-east monsoon
SEA COAST :- AROUND 4000 KM
20
SR STATES – POWER SYSTEM STATISTICSANDHRA PRADESH
INSTALLED CAPACITY – 8944 MW
MAX DEMAND MET – 8241 MW
DAILY CONSUMPTION MAX – 171 MU
DAILY CONSUMPTION AVG – 142 MU
CONSUMER PROFILE –
INDS -27%, DOM-22%, COMM-5%, IRRI-39% & OTHERS-7%
KARNATAKA
INSTALLED CAPACITY – 6180 MW
MAX DEMAND MET – 5612 MW
DAILY CONSUMPTION MAX – 125 MU
DAILY CONSUMPTION AVG – 95 MU
CONSUMER PROFILE –
INDS -26%, DOM-19%, COMM-7%, IRRI-39% & OTHERS-9%
KERALA
INSTALLED CAPACITY – 2284 MW
MAX DEMAND MET – 2602 MW
DAILY CONSUMPTION MAX – 41 MU
DAILY CONSUMPTION AVG – 34 MU
CONSUMER PROFILE –
INDS -34%, DOM-44%, COMM-13%, IRRI-2%& OTHERS-7%
TAMIL NADU
INSTALLED CAPACITY – 10015 MW
MAX DEMAND MET – 8371 MW
DAILY CONSUMPTION MAX – 166 MU
DAILY CONSUMPTION AVG – 135 MU
CONSUMER PROFILE –
INDS -39%, DOM-25%, COMM-7%, IRRI-24% & OTHERS-5%
21
ANDHRA PRADESH
POPULATION :- 7.6 CRORES
AREA :- 275 (‘000 SQ KM)
NO OF CONSUMERS :- 162 LAKHS
PER CAPITA CONS. :- 719 UNITS
MAIN AGRICULTURE CROP :- RICE
CLIMATIC CONDITION :- HOT AND HOT & HUMID
SR STATES – GEOGRAPHYKARNATAKA
POPULATION :- 5.3 CRORES
AREA :- 192 (‘000 SQ KM)
NO OF CONSUMERS :- 105 LAKHS
PER CAPITA CONS. :- 642 UNITS
MAIN AGRICULTURE CROP :- COFFEE & RAGI
CLIMATIC CONDITION :- HOT AND HOT & HUMID
KERALA
POPULATION :- 3.2 CRORES
AREA :- 39 (‘000 SQ KM)
NO OF CONSUMERS :- 61 LAKHS
PER CAPITA CONS. :- 386 UNITS
MAIN AGRICULTURE CROP :- COCONUT & SPICES
CLIMATIC CONDITION :- HUMID
TAMIL NADU
POPULATION :- 6.2 CRORES
AREA :- 130 (‘000 SQ KM)
NO OF CONSUMERS :- 152 LAKHS
PER CAPITA CONS. :- 866 UNITS
MAIN AGRICULTURE CROP :- SUGAR CANE & OIL SEEDS
CLIMATIC CONDITION :- HOT AND HOT & HUMID
22
INSTALLED CAPACITY IN SRSUMMARY OF INSTALLED CAPACITY(MW)
AS ON 31.07.2006
AGENCY HYDRO THERMAL GAS/DIESEL WIND/OTHERS NUCLEAR TOTAL
ANDHRA PRADESH 3587 2963 272 2 --- 6824
KARNATAKA 3389 1470 128 4 --- 4991
KERALA 1835 --- 235 2 --- 2072
TAMILNADU 2137 2970 423 19 --- 5549
PONDICHERRY --- --- 32 --- --- 32
CENTRAL SECTOR --- 8090 360 --- 880 9330
IPP 278 387 3149 4309 --- 8123
TOTAL
11226 (30%)
15880 (43%)
4599 (13%)
4336 (12%)
880 (2%)
36921 (100%)
23
11226(30%)
15880(43%)
4337(12%)
880(2%)
4599(13%)
SOURCE-WISE INSTALLED CAPACITY OF SR
All Figures In MW
TOTAL 36,921 MW
HYDRO
THERMAL
WIND/OTHERS NUCLEAR
NAPTHA/GAS/DIESEL
GENERATING UNITS IN SOUTHERN REGION
A.PKAR
TNKERGENERATORS ABOVE 1000 MW
GENERATORS 500 – 1000 MW
GENERATORS BELOW 500 MW
TYPICAL
GENERATOR
SPREAD
IN SR
UNIT CAPACITY AP KAR KER TN CGS TOTAL
THERMAL (500 MW) 2 8 10
THERMAL
(200-250 MW)10 7 13 15 45
GAS/THERMAL
(100-150 MW)9 2 3 10 24
HYDRO
(>50 MW)27 29 16 15 87
TOTAL 48 38 19 38 165
- HYDRO
- THERMAL
- GAS / NAPTHA
- NUCLEAR
CPP/IPP PLANTS IN SOUTHERN REGION
A.P
KAR
TNKER
Station Name I/C in MW
Variable Cost (Ps)
TATA ELECTRIC 79.1 390
JINDAL 260 280
THANNEERBAVI 220 500
Station Name I/C in MW
Variable Cost (Ps)
KASARGOD PCL 22 470
BSES 157 560
KUTHUNGAL 21 ---
MANIYAR 12 ---
KAYAMKULAM 360 580
Station Name I/C in MW
Variable Cost (Ps)
HITEC 15
TCPL 63.5
GMR VASAVI 196 444
SAMALPATTY 105 474
ST-CMS 250 161
P P NALLUR 330.5 550
ABAN 113 88
MADURAI POWER 106 456
ARKAY 38
Station Name I/C MW
Variable Cost (Ps)
SIMHADRI 1000 104
BSES 220 168
VEMAGIRI PGL 233
SPECTRUM 208 104
JEGURUPADU EXT.
220
JEGURUPADU 216 102
LANCO 355 125
26
LOAD 500-1500 MW
LOAD 200-500 MW
TYPICAL
LOAD
SPREAD
IN SR
KHAMMAM
VIJAYAWADANAGARJUNASAGAR
GAZUWAKA
HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
CUDDAPAH
DAVANAGERE
RAMAGUNDAM
BANGALORE
MUNIRABAD
PP
P
P
P
P
P
P
P
P
P
PP
P
KOLAR
63
HOSUR
1
60
P
NELLORE
NELAMANGALA
KURNOOL
KALPAKKA
SIMHADRI
HIRIYUR
TALAGUPPA
MAMIDIPALLY
SRI SAILAM
-- OF NTPC
-- OF ANDHRA PRADESH
-- OF TAMIL NADU
-- OF NLC
-- OF POWERGRID
400KV SUB-STATIONS IN SR
NEYVELI TPS I (EXP)
POWERGRID STATE OTHERS TOTAL
AP 8 9 2 19
KAR 6 5 1 12
KER 2 2
TN 6 1 2 9
TOTAL 22 15 5 42
TRIVENDRUM
NARENDRA
VEMAGIRIGMR
JEGRUPADU EXTN
MEHA BOOB NAGAR
CHITTOOR
-- OF NPC
KAIGA
MYSORE
-- OF KARNATAKA
ALMATHI
28
TRANSMISSION IN SOUTHERN INDIA
ABOUT 3000 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS
VOLTAGE LEVEL AP KAR KER TN CGS TOTAL
400 KV 2680 1616 10905 15201
220/230 KV 10274 7839 2692 6538 366 27709
132/110 KV 12360 6060 3720 10220 32360
TOTAL 25314 15515 6412 16758 11271 75270
29
11000
13000
15000
17000
19000
21000
23000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOUR ---->
DE
MA
ND
IN
MW
--->
TYPICAL LOAD CURVE OF SR
WINTER
MONSOON
SUMMER
EVENING PEAK
WEATHERCONSUMPTION
30
GRID CONTROL
ISSUES & CARDINAL EVENTS
31
GRID OPERATION – TYPICAL ISSUES IN PAST
• LOW / HIGH FREQUENCY PROBLEMS
– FREQUENCY EXCURSES TO LOW/HIGH VALUES
• LOW / HIGH VOLTAGE OPERATION
– CRITICALLY LOW VOLTAGES AT LOAD CENTRES
– SUBSTANTIALLY HIGH VOLTAGES AT FAR ENDS
• SYSTEM BROWNOUTS / BLACK OUTS
– SEPERATION OF SYSTEMS / LOSS OF LOAD
• ECONOMIC IN-STABILITY / INCREASED ELECTRICAL LOSSES– UNRELIABLE / INEFFICIENT OPERATION OF EQUIPMENT
32
GRID OPERATION: A TIGHT ROPE WALK
BLACK-OUTVOLTAGE
COLLAPSE IN-ECONOMIC
OPERATION
INSTABILITYPOWER
SWINGSINCREASED
LOSSES
Aug, 2005
By 2007
Inter-regional capacity - 18,400MW
Salakati
Bongaigaon
Birpara
Malda
Dehri
Sasaram
Sahupuri
Allahabad North-eastern
Eastern
Northern
Belgaum
Kolhapur
Budhipadar
Rourkela
Korba
Raipur
Auraiya
Malanpur
Western
Southern
Balimela
Upper Sileru
Chandrapur
Ramagundam
Jeypore
Gazuwaka
Singrauli
Vindhyachal
Talcher
Kolar
Kota
Ujjain
Inter-regional Links – By 2007
Gorakhpur Muzaffarpur
Balia Patna
BiharshariffBalia
SipatRanchi
Agra
Gwalior
Nagjhari
Ponda
2100 MW
6650 MW 1200 MW
3650MW1400 MW
2850 MW
35
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
1
2
3
Three ELECTRICAL REGIONS w.e.f. March 2003
36
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
1
2
TWO ELECTRICAL REGIONS w.e.f Aug. 2006
37
Components of inter-utility tariff(Pre – ABT Mechanism)
Fixed charges Interest on loans Depreciation O & M charges Return on equity Interest on Working Capital
Energy charges (fuel cost) Incentives Surcharge & other levies No charge for reactive energy
38
Components under Availability Based Tariff (ABT)
Capacity chargesEnergy chargesUnscheduled Interchange (UI)
39
0
50
100
150
200
250
300
350
400
450
500
550
600
650
48.9 49 49.1 49.2 49.3 49.4 49.5 49.6 49.7 49.8 49.9 50 50.1 50.2 50.3 50.4 50.5 50.6 50.7 50.8 50.9 51
Frequency ----------->
UI ra
te
-----
------
------
>
Below 49.0 Hz UI rate =570 p/u
At 50.0 Hz UI rate =150 p/u
At 49.8 Hz UI rate =210 p/u
Above 50.5 Hz UI rate =0 p/u
UI RATE
Rate of Unscheduled Drawal/InjectionFrequency (Hz) Rate (p/u)
Above 50.5 0
50.0 150
49.8 210
49.0 and below 570
40
UI - A RATIONAL AND SCIENTIFIC VECTOR
BALANCING MARKET
MERIT ORDER OPERATION
TRANSPARENCY
NEUTRALITY
SIMPLICITY
PRICE SIGNAL EASILY AVAILABLE
NO NEED TO NEGOTIATE ANY PRICE
EASY SETTLEMENT
EASY TO UNDERSTAND AND IMPLEMENT
EASE OF REGULATION
41RTU RTU RTU
SUB LDC SUB LDC SUB LDC
SLDC SLDC SLDC
ERLDC
WRLDC NRLDC SRLDC
NERLDC
NLDC
32 Nos.
51 Nos.
1160Nos.
Unified Grid OperationUnified Grid Operation
5 Nos.
NationalLevel
RegionalLevel
State HQLevel
Group / Distt Level
Plant / Sub-Station Level
42
RLDC,Bangalore
KalamasseryHyderabad BangaloreChennai
Cuddapah
Warangal
Vijayawada
Kalam’erry
Kannur
Trivandrum
Chennai
Erode
Madurai
Bangalore
Lingusugur
Hubli
CPCC SCC, Pondy
Hyderabad
Hierarchy of The ULDC Scheme in Southern Region
Andhra Kerala Tamilnadu Karnataka
43
Southern Region Grid Complexities in Monitoring & Control
Annual Inter-Regional Energy Transfer
≈10,000MU
Transformers (220kV and
above)480 nos.
Installed Capacity
≈36031 MW
Integrated Opn
of Ten Power Utilities
Dynamic Grid
Conditions
Generators –Hydro,
Thermal,Gas/IPP
422 nos.
Transmission
Network 400/220kV
≈ 40700 Ckm
30,000 POINTSActive Power, Reactive
Power,Voltage, Frequency,
TransformerTap Position, Circuit
Breaker Position, Isolator Position etc
Transformation
Capacity ≈45000 MVA
44
GROWTH OF INSTALLED CAPACITY OF SR
1947
5
1983
0
2030
4
2129
8
2213
3
2298
3
2417
3
2616
3 2850
1
2952
6 3273
3 3603
1
10000
15000
20000
25000
30000
35000
40000
1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06
YEARS - - ->
IN MW
45
Kolar
Chintamani
Cudappah
HoodyHosur
Salem
Udumalpet
Madras B’lore
+/- 500 KV DC line 1370 KM
ElectrodeStation
ElectrodeStation
TALCHER
400kv System
220kv system
KOLAR
TALCHER KOLAR TALCHER KOLAR SCHEMATICSCHEMATIC
46
NR-ER
SR-ERWR-SR
ER-NEREASTERN
REGION
SOUTHERN
REGION
WESTERN
REGION
NORTHERN
REGION
NORTH-EASTERN REGION
SHORT TERM OPEN ACCESS(STOA) RATES
(2006-07)
WR-ER
757.04
(3.2)
407.87
(1.7)
521.37
(2.2)
345.10
(1.4)
1893.14 (7
.9)
1114.72
(4.6)
560.
09 (2.
3)
1335.50 (5.6)
557.96 (2.3)441.24 (1.8)
WR-N
R
Notes: i) The indicated STOA Rates are in Rs./MW/Day.
ii) The figures shown in bracket correspond to the
indicative STOA Rates in Paise/Unit. (approx.)
47
UI vs STOA market (All regions)
5% UI market
3% STOA market
100% power market
92% long term market
48
DETAILS OF REGION WISE STOA TRANSACTIONS IN 2005-06
2263
1241
35 109 290
1012610561
772 623 444
0
2000
4000
6000
8000
10000
12000
NR WR SR ER NER
No.Of Transactions Energy Approved in MU
49
Constituent-wise STOA Import/Export Energy2004 – 05
519503
0
358
00
185
00
200
400
600
800
1000
1200
1400
1600
1800
2000
AP KPTCL KSEB TNEB
Import Export
All figures in MUs2005 – 06
434
1717
356
808 842
3 0 00
200
400
600
800
1000
1200
1400
1600
1800
2000
AP KPTCL KSEB TNEB
Import Export
50
MONTHWISE EXPORT STOA BY CPPs/ IPPs
0
20
40
60
80
100
120
140
160A
pr-
05
May
-05
Jun
-05
Jul-
05
Au
g-0
5
Sep
-05
Oct
-05
No
v-05
Dec
-05
Jan
-06
Feb
-06
Mar
-06
Ap
r-06
May
-06
Jun
-06
EN
ER
GY
IN M
Us
---
>
JINDAL NAVBHARAT
51
KADAMPARAI PUMP OPERATION
-300
-200
-100
0
100
200
300
400
5000:
001:
002:
003:
004:
005:
006:
007:
008:
009:
0010
:00
11:0
012
:00
13:0
014
:00
15:0
016
:00
17:0
018
:00
19:0
020
:00
21:0
022
:00
23:0
00:
00
TIME ---->
IN M
W --
-->
48.50
49.00
49.50
50.00
50.50
51.00
FREQ
UENC
Y IN
HZ
---->
GENERATOR MODE
PUMP PUMP
52
KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU)
MONTHS2001-02 2002-03 2003-04 2004-05 * 2005-06
GENERATOR MODE
GENERATOR MODE
GENERATOR MODE
PUMP MODE
GENERATOR MODE
PUMP MODE
GENERATOR MODE
PUMP MODE
APRIL 0.1 3.9 35.0 40.0 26.0 35.0 0.0 2.6
MAY 0.0 1.4 37.0 43.0 41.0 48.0 29.6 45.7
JUNE 1.0 6.4 29.0 45.0 55.0 35.0 45.3 51.2
JULY 27.5 6.9 47.0 49.0 50.0 49.0 79.0 62.3
AUGUST 21.4 8.8 54.0 55.0 55.0 41.0 49.5 25.0
SEPTEMBER 11.0 8.6 36.0 48.0 30.0 25.0 40.8 15.2
OCTOBER 19.5 18.5 26.0 15.0 0.0 0.0 46.9 45.1
NOVEMBER 17.9 16.7 23.0 24.0 0.0 0.0 64.1 59.2
DECEMBER 20.3 20.5 49.0 53.0 0.0 0.0 70.0 62.5
JANUARY 18.4 39.0 44.0 58.0 0.0 0.0 72.0 92.9
FEBRUARY 14.0 39.0 21.0 21.0 0.0 0.0 53.3 55.6
MARCH 5.7 32.0 6.0 18.0 0.0 0.0 30.9 37.9
TOTAL 156.7 201.8 407.0 469.0 257.0 233.0 581.4 555.3
Note: The plant was under shutdown from 16th Sep 2004 to 28th April 05 for dam maintenance works.
53
KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU)
157
202
407
257
581
469
233
555
0
100
200
300
400
500
600
700
2001-02 2002-03 2003-04 2004-05 2005-06
Generation Pumped
54
UI IMPORT BY SR FROM ER ON 12-JUL-06
0
100
200
300
400
500
600
700
800
900
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:0
0
11:0
0
12:0
0
13:0
0
14:0
0
15:0
0
16:0
0
17:0
0
18:0
0
19:0
0
20:0
0
21:0
0
22:0
0
23:0
0
TIME---->
IN M
W --
-->
48.4
48.6
48.8
49.0
49.2
49.4
49.6
49.8
50.0
50.2
50.4
FREQ
IN H
Z--->
ER UI SR FREQ ER FREQ
ER FREQ
SR FREQ
UI IMPORT
FROM ER
AMOUNT SAVED FOR SR CONSTITUENTS = 71 LAKHS
55
GENERATION vs FREQUENCY FOR
10
30
50
70
90
08
:21
09
:21
10
:21
11
:21
TIME IN HH:MM ----->
MW
---
-->
49.00
49.20
49.40
49.60
49.80
50.00
50.20
50.40
FR
EQ
IN
HZ
---
-->
GENERATING UNITS PARTICIPATION IN PRIMARY RESPONCE
SHARAVATHI -1
FREQ DROP FROM 49.72 HZ TO 49.27 HZ
i.e. ~ 0.45HZ
56
LOW DEMAND(VALLEYS)
SHARP PEAKS
0000 HRS OF 01 SEP 06
29 AUG 06 30 AUG 06 31 AUG 06