1
Nanosat-5
Progress Report26 February 2008
Structural / Design
Tenant Design Review (2-21-2008)– Rounds changed to 1/8th inch (.4 cm)
• Applies to isogrid, component boxes, etc
– Holes changed to represent actual diameter, not tapped diameter
• e.g. 1/4th inch to 3/16th inch
– Torque coil mounts• Will be cut into two pieces for easy of fabrication• Will require flanges to assemble
– More weight
– Battery Box• Will be wire EDM’d• Less screws in battery box lid
– 4 screws instead of 82
Structural / Design
Analysis– Continuing work with Ansys
• Model integration from ProE• Vibrational analysis capabilities of Anysis and how
to implement with model• Possible simplification of model structure to
reduce complexities and time of analysis
3
Thermo
Orbit Propagation Code– Completed code
• Orbital determination• Sun position vector from earth• Incidence angles on each face• Eclipse time• View factors and radiation from earth• Transient heat flux from incoming solar radiation
as a function of incidence angle
4
Thermal
Analysis– Importing model from ProE– Continuing work with ANSYS– Studying transient heat flux and general
radiation techniques• Radiosity method vs Radiation Matrix• Model elements• Time varying heat flux
5
Immediate Tasks
• Apply Tenant Design Review changes• Acquire reliable access to ANSYS pro• Resolve issues with ProE integration• Begin model implementation and
analysis– Both thermal and structural