1 Weekly Summary Nanosat 5 Spring Semester 29 April 2008 Mike Legatt

description

Weekly Summary Nanosat 5. Spring Semester 29 April 2008 Mike Legatt. Last Week. AFRL CDR and Reports!!!!!!!!!!! Structural feedback Excellent work – - PowerPoint PPT Presentation

Transcript of Weekly Summary Nanosat 5

Page 1: Weekly Summary Nanosat 5

1

Weekly SummaryNanosat 5

Spring Semester29 April 2008

Mike Legatt

Page 2: Weekly Summary Nanosat 5

2

Last Week

• AFRL CDR and Reports!!!!!!!!!!!– Structural feedback

• Excellent work –– “Consider putting the battery box on the bottom, not the

top. If you put it on top, you make the structure do something you don’t want it to do.”

– “Don’t need to use so many nodes.” • Chasing the convergence• More sims in progress

– Thermal feedback• “In general, the analysis lines up ‘very well’ with others

seen before.” • Use SINDA/Thermal Desktop• Radio RF powers loss vs. thermal power loss• We have many nodes.

Page 3: Weekly Summary Nanosat 5

3

Next Week

• General– Prepare for FDR

• Structural– Create a structural analysis handbook for subsequent

Nanosat teams– Report revisions

• Thermal– Create a thermal analysis handbook for subsequent

Nanosat Teams– Use student version of ANSYS with reduced nodes– Report revisions

Page 4: Weekly Summary Nanosat 5

4

Outstanding IssuesGeneral

-ANSYS license expires 30 April 2008-update reports as necessary-exit interviews

Structural-continue to run sims and make structural modifications to ensure the satellite meets all AFRL structural requirements-all structural requirements now fulfilled

Thermal-cold case sims -take into account thermal control issues since ANSYS license expires

4, satelliteTFQ 4, satelliteTFQ

Page 5: Weekly Summary Nanosat 5

5

Updated Schedule

Page 6: Weekly Summary Nanosat 5

6

Hot case, Sun side

Page 7: Weekly Summary Nanosat 5

7

Hot case, bottom

Page 8: Weekly Summary Nanosat 5

8

Hot case, warmer near Standoffs

Page 9: Weekly Summary Nanosat 5

9

Hot case, Isogrids, Standoffs

Page 10: Weekly Summary Nanosat 5

10

Hot case, Hot face

Page 11: Weekly Summary Nanosat 5

11

Battery Box

Page 12: Weekly Summary Nanosat 5

12

Component Box (GPS receiver, ADNCS, etc)

Page 13: Weekly Summary Nanosat 5

13

Component Box (Radio)

Page 14: Weekly Summary Nanosat 5

14

Flight Computer

Page 15: Weekly Summary Nanosat 5

15

IMU

Page 16: Weekly Summary Nanosat 5

16

Future Work

•Possible satellite attitude effects on temperature extremes

•Thermal control methods (fins, coatings, etc)

•Component relocations

•Mesh refinement for convergence verification

•Possible satellite attitude effects on temperature extremes

•Thermal control methods (fins, coatings, etc)

•Component relocations

•Mesh refinement for convergence verification