Live, Virtual, Constructive –Integrating Architecture
(LVC-IA)Overview Brief for
OneSAF Users ConferencePEO STRI / TCM LVC TE
2 April 2009
Live, Virtual, Constructive –Integrating Architecture
(LVC-IA)Overview Brief for
OneSAF Users ConferencePEO STRI / TCM LVC TE
2 April 2009
2
Agenda
LVC-IA Program Overview
PEO STRI I2 LVC Integration Cell initiative
OneSAF Contribution to LVCIC
Take Aways
3
LVC-IA and Infrastructure Defined
The LVC-IA and Infrastructure consists of two mutually dependent components. The LVC Integrating Architecture is a network-centric linkage that collects, retrieves and exchanges data among Live Instrumentation, Virtual Simulators, and Constructive Simulations as well as Joint and Army Battle Command Systems (BCS). This architecture provides the common protocols, specifications, standards and interfaces that help standardize common LVC components and tools required for interoperability of LVC components for simulation/stimulation (SIM/STIM) of unit Battle Command Systems for mission rehearsals and training.
The Live Virtual Constructive Integrating Architecture defines “how” information is exchanged among the LVC domains and Battle Command Systems. The LVC Integrating Architecture includes common LVC components such as Enterprise AAR, C2 Adapters, Terrain Databases, Multi-level Security, and Hardware/Software.
The Live Virtual Constructive Training Infrastructure provides the “means” for communicating, exchanging data and networking for all of the LVC domains. The LVC infrastructure includes installation’s foundational elements and components needed to perform net-centric battle command training and includes: Facilities; Power; Communications (RF/Fiber) Networks; Training Support Systems (TADSS); Personnel and Equipment; Resources; and Management Structure and Organization.
LVC-IA, along with an associated installation’s supporting Training Infrastructure, are mutually dependent on each other to create an LVC Integrated Training Environment.
The end-state goal of the LVC-IA and Infrastructure is to enable an LVC Integrated Training Environment that approximates the Operating Environment and provides
Value-Added training and Mission Rehearsal opportunities to Commanders and units
4
LVC-IA Requirement
LVC-IA Increment 1 Systems
• Live
– Homestation Instrumentation Training System (HITS)
• Virtual
– Close Combat Tactical Trainer (CCTT)
– Aviation Combined Arms Tactical Trainer (AVCATT)
– Call for Fire Trainer (CFFT)
• Constructive
– Joint Land Component Constructive Training Capability - Entity Resolution Federation (JLCCTC ERF)
– One Semi-Automated Forces (OneSAF)
• Battle Command
– ABCS - AMDWS, AFATDS, ASAS (DCGS-A), BCS3, BC Server, FAAD, FBCB2, GCCS-A, MCS (Gateway & Workstation), ISYSCON and CPOF
– GCCS
5
LVC-IA Increment 1 Concept
BLUF:The LVC-IA will enable seamless LVC
& C2 connections
C2• ABCS• GCCS
CONSTRUCTIVE• JLCCTC• OneSAF
LIVE• HITS
VIRTUAL• AVCATT• CCTT/RVTT• CFFT
LVC-IA
Increment 1 Focus- Brigade Combat Team (BCT)- Home Station Training- BCTC is LVC Hub
6
FY 13QTRs 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
3 sites
oE
3 sites
Increment 1
Increment 2
MS C
SCHEDULE
P&D Phase
Sys. Dev&Demo Phase
FY 14 FY 15FY 08 FY 09 FY 10 FY 11 FY 12
MS A/ B
Sys. Dev&Demo Phase
pre-MS B & Risk Red. MS C
P&D PhaseMS B
Increment 3
MS B Sys. Dev&Demo Phase
OPERATIONAL T&E
OE OE
DELIVERIES 3 sites
Increment 2Increment 1
3 sites
LVC-IA Development Strategy
The LVC-IA will be realized using an incremental development approach.
• The capabilities defined in the LVC-IA approved Initial Capabilities Document (ICD) & Capabilities Development Document (CDD) will be parsed into specific increments of technology that provide military utility
• Increment 1 development will begin upon successful completion of Milestone B
7
LVC-IA Status
Funding• LVC-IA funding addressed in “Locked” POM for FY10-15• POM $$ are NOT solely for LVC-IA Prime Integrator contract• ACAT III Designation
Capabilities Development Document• TCM LVC TE Chartered May 2008• CDD is AROC approved and awaiting it JPD
PEO STRI Program Management Office (PMO)• DAMO TRS allocated FY09 $$ to address stand up of LVC-IA PMO
– Pre-MS B work activities and documentation• PM WTI has completed most hiring actions for FY09
Pre-MS B Risk Mitigation• Engaged in PEO STRI Live, Virtual, Constructive Integration Cell activities• Working MS B documentation preparation
NOTIONALSCHEDULE
Dec-08 Feb-10
Jan-09 Apr-09 Jul-09 Oct-09 Jan-10
Jan-09Anticipated STOC II Award
Aug-09Release Draft LVC-IA RFP
Sep-09LVC-IA MS B
Oct-09Release Final LVC-IA RFP
Jan-10LVC-IA Contract Award
May-09LVC-IA Industry Day
Mar-09LVC-IA RFI
8
LVC-IA Increment 1 KPPs
KPP Description Threshold Value
LVC-BC Interoperability Interoperability with LVC current systems; BCT is the primary training audience
-Exercise / Tech Control
L: HITS
V: CCTT/RVTT, AVCATT, CFFT
C: JLCCTC, OneSAF
BC: GCCS, ABCS (C2 STIM)
Expanded Area of Operations Provide the ability to combine L-V-C training systems and common C2 data to portray realistic Common Operational Picture (COP); entity resolution count cross-domain portrayal for 1 x BCT
L-C = 2000
L-V = 600
C-BC =25000
C-V = 600
V-C = 600
Required LVC-BC entity count = 29100, of which at least 50% must be medium resolution.
Enterprise AAR Responsive, automated data collection, distribution, and presentation system with data access across L,V, and C systems
-Unconstrained views
-On-demand screen captures
-7 x standard AAR reports
-Customized report capability
LVC Exercise Control Exercise management of the LVC integrating architecture and infrastructure including set-up, plug & train, availability
-Set-up <10 days <30 spt pers
-Dynamic addition of LVC compliant TADDS
-Provides 84% availability rate for a BCT LVC-IA 1 Exercise, maximum duration of 4 days.
-20% reduction in required resources
Net Ready Meet Net-Centric Operations and Warfare Reference Model (NCOW-RM), GIG and IA requirements per DoDAF & CJCSI
-Defined within DoDAF architecture products (OVs, SVs)
9
LVC-IA Increment 1 APAs
APA Description Threshold Value
Simulations and BC Systems Two-Way Wireless Interoperability
Enable two-way wireless communication capability between simulations and BC systems with IBC2 enablers
--2-way wireless communications
--2-way gateway
--2-way multi-level security gateway interface
--BFT and EPLRS interface between BC systems and V-C domains, and LVC LAN/Warn network.
Standards & Protocols Interoperate with Current Army and Joint C2 Systems Provide standards and protocols to DISR in support of LVC incremental development.
Fair Fight Enable common effects across all training environments -Common effects: Weapons effects, Sensor effects, Area weapons effects, Ph/Pk, Pd, RTCA, BDA, Combat adjudication, Class III / V adjustments
-Geospatial combatant location, Latency effects, Algorithmic validity
Data Archived Information Automatically archive information into, and access archived information from appropriate repositories
-A capability to automatically support up to one terabyte (TB) of storage, retrieval, manipulation and display of a library of AAR aids using text, graphics, and figures to describe alternative tactics, techniques, procedures, and archived information from appropriate repositories with a time stamp.
AAR Products & Presentation Support real-time, multi-media AAR presentation -Standard AAR reports within 2 hrs on demand
-Automated data collection of pre-defined events
-Store, edit, replay, and filter
AAR Analysis Analysis of the information gathered through automated and manual methods
-Transparent, real-time access / monitoring
-Capture key training tasks, trends, and controller interventions
LVC Hardware/Software Supportability
DOD software and reuse policy -Maximize COTS/GOTS; minimize proprietary; HW/SW technical data packages and user documentation; BIT capability
LVC Simulation Equipment (LVC-SE) LVC-IA Software will run on equipment consisting of a variety of COTS, GOTS, S/W, H/W, and cross-domain security solutions
-Sufficient processing speed, and memory to run specified simulations and gateway/interface functions at highest entity count identified for the BCT Training Audience at Increment 1
10
LVC-IA Planned CONUS Fielding
Ft. Hood
Ft. Bliss Camp Shelby
Ft. Stewart
Ft. BraggFt. Campbell
Ft. Knox
Ft. Drum
Ft. Carson
Ft. Lewis
As of DEC 2009
11
LVC-IA Planned OCONUS Fielding
USAREUR
Alaska
Hawaii
Korea
As of DEC 2009
OCONUS Fielding• 1 US Army Pacific (USARPAC) - TBD• 1 US Army Europe (USAREUR) – TBD
12
I2 Concept
Focus AreasProgram
Synchronization“Better Decision Making”
Attributes:· Identification of
program dependencies· 2nd and 3rd order
effects of alternatives
Interoperability“Enhanced training and
test capabilities”
Attributes:· Expansion of training &
test capabilities· Enhanced realism· Functional expansion· Complex environments· More detailed
modeling
Common Products“Reduced total ownership
costs”
Attributes:· Increased return on
M&S investments· Systematic reuse· Faster development· Reduced testing· Reduced support costs
Enablers
· Oversight Function – PEO STRI Chartered Senior Management Board
· Persistent interoperability· Specifications· Common Component &
Reuse· Business Model
· Standards· Infrastructure Services· Configuration Management· Heterogeneous
Simulations· Homogeneous Simulations
I2 END STATEImprove Execution of PEO STRI’s Mission Across the Entire
Portfolio of Programs
Focus of the LVCIC
13
PEO STRI LVC Integration Cell
Interfaces
Interfaces
InterfacesInterfaces
HITS
ABCS
Interfaces
CCTT
OneSAF
LVCIC
LVCICConcept
2 Year Plan
BLUF – Provide integration of L, V, C systems at the source (Materiel Developer) to reduce the resources required to integrate
at each installation/instantiation of the LVC-ITE
1411 Sep 08
• Provides a common constructive picture to Live, Virtual, C2 and Enterprise AAR
• Provides the constructive wrap around forces for LVCIC
• Integrated with Live, Virtual, C2 and Enterprise AAR cross domain environments seamlessly.• Displays Live and Virtual objects and interactions
• Fire engagements (Live and Virtual)• Provides Fire and Smoke (Virtual)
• Stimulates Common Operating Picture (COP)(FBCB2)• Stimulates AFATDS Fire Support missions
• Integrated with LVCIC common components• Correlated Enumeration List• Scenario Initialization • Data Translation (JBUS)
OneSAF LVCIC Contribution
15
LVCIC Logical Network Architecture
CCTT DIS LAN (220.225.186.x Port 3001)
VOICE NETWORK
JLCCTC ERF HLA INTEROPERABILITY LAN
C4I TACTICAL NETWORK
VIRTUAL DIS INTEROPERABILITY LAN (5.5.5.x Port 4000)
DAUVS ASTi Synapse
(2x)
SINCGARSASIP (8X)
CCTT Gateway
Simulated Radios
EmbeddedABCS
Equipment
OneSAF Network
OneSAF Interoperability Manager
BLUFORWorkstation
OPFORWorkstation
OPFORWorkstation
C2 Adaptor
CTIA Taffic/ PU XML Messaging
HITS OneSAF(HITS Mod)
CTIA ServicesJBUS(CTIA Plug-In)
DCNC
Base Radios
PU Vest
Tactical Radios
TacticalABCS
Equipment
HLA License ServerAnalysim
OneSAF
DevelopmentHITS
Development
CCTT
Integration
JBUS (ERF Plug-In) FMT-R HLA Analyzer
EnterpriseAAR
CCTTFederation
DISJBUS (DIS Plug-In)
JBUS (ERF Plug-In)
16
Take Away
The LVC-IA MS B Decision is planned for Sep 2009.
OneSAF will support the LVC-IA Increment 1 Program.
OneSAF is supporting the PEO STRI I2 LVC Integration Cell initiative.
We understand that OneSAF has not been validated by the TEMO domain.
• It will be key that the User community utilize the system to provide feedback to PM OneSAF for product improvement.
Key Point:
• In a resource constrained environment the Army will not be able to train as it currently does.
• The integration of Live, Virtual, and Constructive TADSS with Battle Command will enable larger, more robust, and rich training events at reduced cost.
17
POCs
PEO STRI
(Materiel Developer/Acquisition Lead)
NSC TCM LVCTE
(Combat Developer/Requirements Lead)
LTC Keith Flail
PEO STRI – Product Manager WTI
(407) 384-5129
Christopher T. Vaughn
LTC, FA57
TCM LVC TE – LVC-IA Project Lead
(913) 684-8479
Devin Lyders
PEO STRI – PM WTI LVC Team Lead
(407) 209-9370
Dennis Draper
TCM LVC TE – LVC-IA Support Contractor
(913) 684-8424