1 Initiatives for Decentralised Planning by PRI in West Bengal.
-
date post
21-Dec-2015 -
Category
Documents
-
view
220 -
download
0
Transcript of 1 Initiatives for Decentralised Planning by PRI in West Bengal.
11
Initiatives for
Decentralised Planning by PRIin West Bengal
Zilla Zilla Parishad Parishad
(ZP) Avg.pop (ZP) Avg.pop 3.2m 3.2m
Panchayat Samiti (PS) Avg. pop 0.17m
Gram Panchayat (GP) Avg. pop 17000
Gram Sansad Gram Sansad Gram Sansad Gram Sansad
3-TIER SYSTEM OF PRIs IN 3-TIER SYSTEM OF PRIs IN WBWB
STANDING COMMITTEES OF ZP & PS STANDING COMMITTEES OF ZP & PS
SMALL INDUSTRY,
ELECTRICITY & UNCONVENTION
AL ENERGY
FORESTRY & LAND
EDUCATION, INFORMATION,
CULTURE & SPORTS
PUBLIC HEALTH &
ENVIRONMENT
FOOD & SUPPLY
FISHERY & ANIMAL
RESOURCES
CHILD & WOMEN DEVELOPMENT,
SOCIAL WELFARE & RELIEF
AGRICULTURE, IRRIGATION &
CO-OPERATIVES
PUBLIC WORKS & TRANSPORT
FINANCE ESTABLISHMENT,
PLANNING & DEVELOPMENT
INDUSTRY & INFRASTRUCTUR
E
WOMEN & CHILD DEVELOPMENT
PUBLIC HEALTH & EDUCATION
AGRICULTURE & ANIMAL RESOURCE
DEVELOPMENT
FINANCE & PLANNING
FIVE SUB-COMMITTEES IN THE FIVE SUB-COMMITTEES IN THE GPsGPs
55
GPs were provided with Map based pictorial GPs were provided with Map based pictorial statistics of 17 important indicators related to 13 statistics of 17 important indicators related to 13 areas of development & comparative position areas of development & comparative position within the Block & District after election in 2008within the Block & District after election in 2008
Planning was one of the topic covered in one Planning was one of the topic covered in one week residential training of all PRI functionariesweek residential training of all PRI functionaries
An annual exercise of score based self-evaluation An annual exercise of score based self-evaluation of progress made & status of delivery of services of progress made & status of delivery of services is done by every panchayat – to show the gaps to is done by every panchayat – to show the gaps to be coveredbe covered
Every GP also has the household survey data in Every GP also has the household survey data in their computer which shows the socio-economic their computer which shows the socio-economic status of the populationstatus of the population
The Road Map for PRI has been communicated to The Road Map for PRI has been communicated to all the PRIs to get a broad vision all the PRIs to get a broad vision
Visioning for PlanningVisioning for Planning
% of Women EducationSouth 24-Parganas : 47.20%
DISTRICT: SOUTH 24-PARGANAS
More than 50%
40% - 50%
Less than 40%
Less than 44%
44% - 50%
More than 40%
% of Malnourished ChildrenSouth 24-Parganas : 47.84%
DISTRICT: SOUTH 24-PARGANAS
88
GP Baseline Data (2007-08) in 11 BRGF districts forming GP Baseline Data (2007-08) in 11 BRGF districts forming the basis of annual GP plans - followed up by annual the basis of annual GP plans - followed up by annual updation at the time of planning exerciseupdation at the time of planning exercise
Resources that will be available to the PRI is Resources that will be available to the PRI is communicated before the start of the yearcommunicated before the start of the year
The Committee on Finance & Planning allocates the same The Committee on Finance & Planning allocates the same for each Standing Committee to draw out their plans & for each Standing Committee to draw out their plans & budget is also prepared for each such committee budget is also prepared for each such committee
District sector budget of the line departments are District sector budget of the line departments are generally not available – discussed later in Standing Com’generally not available – discussed later in Standing Com’
Own resources & people’s contribution are includedOwn resources & people’s contribution are included
Thus the planning is restricted to what PRI may do with Thus the planning is restricted to what PRI may do with resources under their direct controlresources under their direct control
Visioning & Resources for PlanningVisioning & Resources for Planning
99
The Planning process starts at the habitation level The Planning process starts at the habitation level The process is facilitated by a team called GPFT – for The process is facilitated by a team called GPFT – for
which around 6 to 8 volunteers are drawn from the localitywhich around 6 to 8 volunteers are drawn from the locality The entry point is preparation of resource map – both The entry point is preparation of resource map – both
social & natural in a participatory mode and use of simple social & natural in a participatory mode and use of simple PRA toolsPRA tools
The process identifies the priority of schemes in different The process identifies the priority of schemes in different sectors for each Gram Sansad and is aggregated at GP sectors for each Gram Sansad and is aggregated at GP levellevel
Labour budget for NREGA is also worked out for each Labour budget for NREGA is also worked out for each Sansad for integrating the same with the planSansad for integrating the same with the plan
It also identifies activities with little or no cost to be It also identifies activities with little or no cost to be carried out at the Sansad level based on principles of carried out at the Sansad level based on principles of subsidiaritysubsidiarity
People Centred Bottom Up PlanningPeople Centred Bottom Up Planning
1010Social Map by Villagers at every NeighbourhoodSocial Map by Villagers at every Neighbourhood
1111Natural Resource Map at every Gram SansadNatural Resource Map at every Gram Sansad
1212Participatory Learning & Planning Exercise at Village LevelParticipatory Learning & Planning Exercise at Village Level
1313Participatory Learning & Planning Exercise at Village LevelParticipatory Learning & Planning Exercise at Village Level
1414
Collection of relevant data from each household, Collection of relevant data from each household, through neighbourhood level interactions and through neighbourhood level interactions and intense participation, more as a tool for learning & intense participation, more as a tool for learning & empowermentempowerment
Analysis of problems, resources & potentials by Analysis of problems, resources & potentials by communities at Gram Sansad levelcommunities at Gram Sansad level
Prioritisation of action points based on needs & Prioritisation of action points based on needs & resourcesresources
Preparation of Annual Action PlanPreparation of Annual Action Plan The entire process takes around six months to The entire process takes around six months to
complete & requires one professional for complete & requires one professional for providing support to around every 7-8 GPsproviding support to around every 7-8 GPs
Such plans are being prepared in 1050 out of Such plans are being prepared in 1050 out of total 3351 GPs of the state & the remaining GPs total 3351 GPs of the state & the remaining GPs will be covered by the end of the 11will be covered by the end of the 11thth Plan period Plan period
Facilitation for PlanningFacilitation for Planning
1515
Functional Committee
Education
Functional Committee
Public Health & Nutrition
Functional Committee
Women & Child Development
Functional Committee
Agriculture & Allied
Neighbourhoods
Neighbourhood
SHGSHG
SHG
SHG
SHG
SHG
SHG SHG
SHG
Representatives
VILLAGERS
Sub-Committee
Women & Child Development
Sub-Committee
Agriculture & Animal Resources Dev
Sub-Committee
Industry & Infrastructure
Sub-Committee
Education & Public Health
Functional CommitteeInfrastructure &
Others
Gram Unnayan SamitiGram Unnayan Samiti
CSOs
Other VLIs
Informal Disadvantaged
Groups
VILLAGERSVILLAGERS
Sub-Committee for Finance & Planning
Gram Panchayat as a BodyGram Panchayat as a Body
Principal Actors in Gram Panchayat PlanningPrincipal Actors in Gram Panchayat Planning
Sectors of GS Plan & GP PlanSectors of GS Plan & GP Plan
Women
& C
hild
Develo
pment
Public Health
Ed
ucation
Agriculture & Allied
Indu
stri
es
Miscellaneous & Other
Infrastructure
Two-Tier Gram Panchayat Plan
Gram Sansad Plans
Gram Panchayat Level Activity Plan
Structure of GS Plan Based Upa-Samiti Plan Based GP Plan
Gram Sansad Plans
Art
ha
O P
arik
alp
ana
Up
a-S
amit
i P
lan
Kri
shi
O P
ran
isam
pad
B
ikas
Up
a-S
amit
i P
lan
Nar
i, Si
shu
Un
naya
n O
Sa
maj
-kal
yan
US
Pla
n
Sik
sha
O J
anas
was
thya
U
pa-
Sam
iti
Pla
n
Sh
ilp
a O
Par
ikat
ham
o
Up
a-S
amit
i P
lan
Gram Panchayat Level Activity Plan
1919
Peer appraisal of GP Plans – one GP apprising Peer appraisal of GP Plans – one GP apprising plans of another – more for learning plans of another – more for learning
Approval of GS Plan by Gram Sansad/ overall GP Approval of GS Plan by Gram Sansad/ overall GP Plan by Gram SabhaPlan by Gram Sabha
No permission of higher tier or govt necessaryNo permission of higher tier or govt necessary However, vetting of engineering schemes are to However, vetting of engineering schemes are to
be done appropriatelybe done appropriately Implementation of GS level activities mostly by Implementation of GS level activities mostly by
SHGs/GUS with community contribution (around SHGs/GUS with community contribution (around 20%) in the form of labour, materials & cash20%) in the form of labour, materials & cash
Implementation of GP level activities by the GP Implementation of GP level activities by the GP with help of Gram Unnayan Samiti / SHGswith help of Gram Unnayan Samiti / SHGs
Salient features are displayed for public viewSalient features are displayed for public view
Appraisal of the PlansAppraisal of the Plans
Disclosure of Information at Gram Sansad Level
2121Rural Ambulance Deployed through GUS in Murshidabad
Locally made ready to eat baby food for supplementary nutrition
Bamboo bridge by gus
2424
Planning process starts with direct interaction Planning process starts with direct interaction between GP and electors twice a year – between GP and electors twice a year – November & May – at Gram Sansad (village November & May – at Gram Sansad (village parliament)parliament)
Data source: Self-Evaluation data, Census data, Data source: Self-Evaluation data, Census data, Rural Household Survey data, data from line Rural Household Survey data, data from line departments, baseline data being collected by departments, baseline data being collected by GP with support from BRGFGP with support from BRGF
Gram Panchayats Plans are prepared sub-Gram Panchayats Plans are prepared sub-committee-wisecommittee-wise
Gram Panchayats Plans are approved by Gram Gram Panchayats Plans are approved by Gram SabhaSabha
Planning Process in Other GPsPlanning Process in Other GPs
2525
An initiative has been taken to prepare GIS Maps An initiative has been taken to prepare GIS Maps of all GPs to assist area planning & convergence of all GPs to assist area planning & convergence
The outline of GP boundary worked out using The outline of GP boundary worked out using Thana mapThana map
The PMGSY Core Network has been ported on the The PMGSY Core Network has been ported on the maps (99% completed)maps (99% completed)
All public utilities have been captured using hand All public utilities have been captured using hand held GPS and shown in the Map (72% completed)held GPS and shown in the Map (72% completed)
The natural features seen from satellite have The natural features seen from satellite have been superimposed on the Maps to locate been superimposed on the Maps to locate habitations, water bodies, forests etc (65% over)habitations, water bodies, forests etc (65% over)
The Maps are available in different layers and The Maps are available in different layers and GPS & software is going to be provided up to GPS & software is going to be provided up to Block level for capturing new data and updationBlock level for capturing new data and updation
Map Based Area PlanningMap Based Area Planning
NË¡j f’¡ ua j¡e¢Qœ
NË¡j f’¡ ua j¡e¢Qœ
GP Map showing Service Delivery Institutions, PMGSY Core Network and Habitations
2828
PlanPlus :To capture all the plans in Plan Plus software
Piloting : The software was field-tested in July 2007
Capacity Building :Till now, approx. 200 resource persons were trained at the State Level and approx. 350 resource persons at the district level
Present Status :BRGF Plans for 2008-09 of concerned planning units have been uploaded into Plan Plus
Current Strategy :All plans for all planning units (ULBs & RLBs) including plans of district level line departments will be entered into Plan Plus
Current CB Plan : Identifying & developing Block level resource persons
Future Plan :Upgradation of GP Level infrastructure & human resources for effective implementation of Plan Plus
USING PLANPLUSUSING PLANPLUS
3030
Consolidated primary data from GP plansConsolidated primary data from GP plans
Rural Household Survey data, compiled for Rural Household Survey data, compiled for Block & District levelsBlock & District levels
Data from Self-Evaluation exercise by Data from Self-Evaluation exercise by PS/ZP, forming the basis of baselinePS/ZP, forming the basis of baseline
Baseline data being collected by each Baseline data being collected by each PS/ZP in the context of BRGFPS/ZP in the context of BRGF
Secondary data from Censuses, line Secondary data from Censuses, line department offices etc.department offices etc.
Major Data Sources for PS/ZP PlanningMajor Data Sources for PS/ZP Planning
3131
Standing Committee wise plansStanding Committee wise plans
External facilitators to provide capacity External facilitators to provide capacity building and technical support to PS & ZP building and technical support to PS & ZP level plannerslevel planners
Appraisal of plans by external teamsAppraisal of plans by external teams
Validation of plans at Block Sansad / Zilla Validation of plans at Block Sansad / Zilla Sansad meetings before integration into Sansad meetings before integration into draft District Plandraft District Plan
Process of Planning at PS & ZP LevelsProcess of Planning at PS & ZP Levels
Sthayee Samiti Plan Based Panchayat Samiti/Zilla Parishad PlanSthayee Samiti Plan Based Panchayat Samiti/Zilla Parishad Plan
1. Artha, S
anstha,
Unnayan O
Parikalpana
2. J
anas
asth
aya
O P
arib
esh
3. Purta
Karya O Parib
ahan
6. Shisu O N
ari Unnayan,
Janakalyan O Tran
7. B
on O
Bhu
mi S
ansk
ar8. Matsya O Prani Sampad Bikash
9. Khadya O Sarabarha
10. Khudra Shilpa, Bidyut
O Achiracharit Shakti
4. Krishi Sech O Samabaya
5. Shiksa, Sanskriti,
Tathya O Krira
3333
Zilla Parishad PlanZilla Parishad Plan
Panchayat Samiti PlanPanchayat Samiti Plan
Gram Panchayat Plan Gram Panchayat Plan
Gram Sansad PlanGram Sansad Plan
Based onBased onIntegrated Integrated Upa-Samiti Upa-Samiti
PlansPlans
ÙÛ¡u£ ÙÛ¡u£ p¢j¢a fp¢j¢a f¢lLÒfe¡ ¢lLÒfe¡ ¢i¢šL ¢i¢šL
ff¢lLÒfe¡ ¢lLÒfe¡
Plans of Plans of different different district-district-
level line-level line-departmedepartme
ntsnts
Plans of Plans of different different district-district-
level line-level line-departmedepartme
ntsnts
Plans of Plans of MunicipalitiesMunicipalities
Plans of Plans of MunicipalitiesMunicipalities
District District Panchayat PlanPanchayat Plan
Based on Based on Sthayee Sthayee
Samiti plansSamiti plans
Integrated Panchayat Planning Integrated Panchayat Planning for Overall Developmentfor Overall Development
3434
To Include: District level plan activities taking into consideration the proposals forwarded by Panchayat Samiti
To propose for consideration in State Plan : Activities that cannot be undertaken at ZP level due to technical or jurisdiction reason
District / Zilla Parishad Plan
To Include: Blockt level plan activities taking into consideration the proposals forwarded by Gram Panchayat
To propose for consideration in District / ZP Plan : Activities that cannot be undertaken at PS level due to technical or jurisdiction reason
Block / Panchayat Samiti Plan
Gram PanchayatPlan
To Include: Gram Panchayat level plan activities taking into consideration the proposals forwarded by Gram Sansads
To propose for consideration in PS Plan : Activities that cannot be undertaken at GP level due to technical or jurisdiction reason
Gram SansadPlan
To Include: Gram Sansad level plan activities
To propose for consideration in GP Plan : Activities that cannot be undertaken at GS level due to technical or jurisdiction reason
State PlanTo include State level plan activities, taking into consideration the proposals
forwarded by Zilla Parishad / District Planning Commitee
VISION OF INTEGRATED BOTTOM-UP PLANNINGFROM GRAM SANSAD TO STATE LEVEL
3535
Thank youThank you