Page 1: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Solar Energy South East Asia

Infinite Green Co., Ltd.(IGC) Nov. 2014

www.infinitegreen.co.th

1. Company Background 2. Success Project Allocation 3. Solar Farm Development

Page 2: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

www.infinitegreen.co.th

Infinite Green Co., Ltd. (IGC) a subsidiary of Premier Group Companies in Thailand , IGC established on December 2nd, 2009 with capital 600 Million Thai Baht ,and is a leading renewable energy power plant project development group in Thailand and AEC market, we are not only owned 15 MW solar (photovoltaic) power plant in Thailand but also a professional turnkey solution provider to help customer to build up the best performance and reliable solar (photovoltaic) power plant on project demands. Our 3 major components to success: *Good for our people. *Good for our organization, customers, shareholders and business partners.

*Good for society.

Company Background IGC, we are committed to: *Create Win-Win solution for our project cooperation partners. *Attention to project detail to prevent investment risk. *Action with integrity. *Constantly evolving our business development to create best valve for our clients. *Go on project in a socially and environmentally responsible manner.

Company Niche: *Fully Experiences in solar photovoltaic power plant project development from zero to COD. *Professional team work for solar (photovoltaic) power plant operation and management (O&M) *Professional turnkey solution and EPC provider for solar (photovoltaic) power plant project. *Expert in renewable energy project development and consult in Thai and AEC market.

Page 3: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

www.infinitegreen.co.th

Success Project Allocation ไป

กรุง

เทท

ไปสระบุรี

IGC Saraburi 1

IGC Saraburi 2

IGC Saraburi 3

1 1

2

3

IGC Solar ( Photovoltaic ) Power Plant Location

Page 4: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Success Project Allocation Solar Roof Top Project Reference (Thailand):

• Project: Cera Thai Building

• Purpose: Self-use

• System: Grid-connect

• Size:24 kWp

• Project Value: 1,76 M Baht

• Project::Kenyagu Factory

• Purpose: Self-use

• System:Grid-connect

• Size:15 kWp

• Project Value: 1.0 MBaht

• Project:Home of K.VP.

• Purpose: Self-use

• System: Grid-connect

• Size: 3.12 kWp

• Value: 321,536 Baht

• Project:: Home of K.Teunjai

• Purpose: Self-use

• System: Grid-connect

• Size: 5 kWp

• Value:400,000 Baht

Page 5: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

www.infinitegreen.co.th

IGC Certificate: *IGC got ISO9000-2008 Certificate for all solar photovoltaic power plant in Kaeng Khoi ,Saraburi, Thailand

Certificate & Award *IGC got “Thailand TGO CDM Project Award ” for Saraburi 2 (5MW) and Saraburi 3(5MW) solar photovoltaic power plant project development.

Page 6: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

How to Get CPCE (Certificate Production of Controlled Energy) for a Solar Farm

How to Get First Synchronization, Load Rejection Test, PQ Test, COD for a Solar

Obtaining Permits and Licenses

How to Get Connecting a Solar Farm to PEA Line How to Get CPSE (Certificate of Production and Selling of Electricity) for a Solar Farm

Page 7: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

5.75MWp Single Line Diagram: 5.75 MWp Power System Layout:

Page 8: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Solar Farm Development

From zero to COD for solar farm project development:

Reference Site: IGC Saraburi 2 Solar Farm (5MW)

1. Project land location survey & PEA Power GRID load feeder checking and confirmed

2. Public Hearing Meeting to get industry Ministry Factory Certificate Approval 3. Land clearing and soil filling job

4. Pile driving construction 5. Pillar setting and construction for PV module array

6. PV Module array rack supporting setting and construction 7. Inverter ,AC Box (LP) ,MDB & Transformer Under Ground AC Power Cable Installation & Test

Project Start from zero

Page 9: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Solar Farm Development Reference Site: IGC Saraburi 2 Solar Farm (5MW)

8. PV Module Installation

9. AC BOX (LP) and PV Inverter Installation

10. PV Module DC power , PV Inverter & AC BOX (LP) AC power test

Page 10: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Solar Farm Development

Reference Site: IGC Saraburi 2 Solar Farm (5MW)

11. MDB, High Voltage 22KV Transformer Installation & Power Grounding Testing

12. 22KV High Voltage Switch Gear Installation & Testing 13. 22KV High Voltage Power GRID cable installation & test

14. PEA Power Sell Meter and Buy Meter setting and GRID connecting to PEA power transmission line Installation & Testing

Page 11: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Solar Farm Development Reference Site: IGC Saraburi 2 Solar Farm (5MW)

15. PEA on-site HV switch gear relay setting and power quality (PQ) data test before COD

16. PEA on-site power plant first sync meeting and final power quality testing to approve and allow solar farm to start power generation and sell power to PEA (COD)

After COD Solar Farm View

After COD Solar Farm Power Generation Monitoring & Real Time Report

Page 12: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

5MW Solar Farm Power Generation Flow Chart (After COD)

PV Module Inverter

Operation Control Room & System Monitoring

MDB 22KV HV Transformer

AC

BOX (LP)

22KV Power GRID to PEA Power Transmission Line

PEA HV Power Buy & Sell Meter

To PEA Power

Transmission Line Load Feeder

DC to AC

22KV Switch Gear

Solar Farm Development Reference Site: IGC Saraburi 2 Solar Farm (5MW)

Page 13: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Working with Multiple Authorities

Page 14: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Effective Project Management Reference Site: IGC Saraburi 2 Solar Farm (5MW)

The Construction Plan for Solar Farm Project Progress Report (From zero to COD)

5MW

Page 15: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

Effective Project Management Reference Site: IGC Saraburi 2 Solar Farm (5MW)

Project Construction S Curve Report From zero to COD

Progress Plan Progress Actual

5 MW

Page 16: 1. Company Background 2. Success Project Allocation 3 ... · Company Background 2. Success Project Allocation 3. Solar Farm Development . ... The Construction Plan for Solar Farm

www.infinitegreen.co.th

IGC Carbon Credit CO2 Emission Contribution (CDM Program): IGC 15MW solar (photovoltaic )power plant decrease CO2 Emission around 14,000 t CO2 (CERs) per year that equal to 95,500 tree cultivation, it need 715,200 M² land space for 95,500 tree cultivation.

IGC Green Environment Protection