Andrew HowardUNFCCC secretariat
Progress in implementing the international transaction log
Consultations on registry systemsprior to SBSTA 22
Bonn13-14 May 2005
![Page 2: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/2.jpg)
2
Technical design work
Applicability of the CITL for ITL development
Development schedule
Initialization of registries
Overview
![Page 3: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/3.jpg)
3
Basis for the ITL established in the standards
• Transaction types
• Checks to ensure conformity with rules
• Reconciliation to eliminate inconsistencies
• Electronic communications with registries
• Data records to be kept
• Administrative processes
Version 1.0 of the technical specifications for the standards
Data exchange standards
![Page 4: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/4.jpg)
4
Version 1.0 (draft #7) of the ITL technical design specifications
• Database design and structure
• Logical flows for transaction and reconciliation processes
• Detailed specifications of coding components
• Detailed methods for ITL checks
• Links to other databases for reference information
- Compilation and accounting database
- CDM information system
- JI information system (track 2)
• Detailed specifications for ITL notifications
ITL technical design
![Page 5: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/5.jpg)
5
• Review ITL technical design
• Create database
• Develop programme code and an administrator interface
• Establish hardware environment
• Testing (individual components and overall functionality)
• ITL deployment in a production environment
• Initialization of secure communications with registries
• Documentation (plans, guides, training)
• Public website
ITL development tasks
![Page 6: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/6.jpg)
6
EU ‘Community Independent Transaction Log’
• Performs checks on transactions under the EU trading scheme
• Modelled on Kyoto’s ITL
• Development based on ITL technical design
CITL programme code provides a robust basis for the ITL
• Strong architecture for transactions, data integrity and checks
• Around half of required ITL functionality contained in CITL code
• Challenge is to safely and seamlessly adapt, remove and add code
A head start through the CITL
![Page 7: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/7.jpg)
7
EU transaction log (CITL)
EU communications hub
Nationalregistry
Nationalregistry
Nationalregistry
EU Member State registries
EU checks
Current EU communications
![Page 8: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/8.jpg)
8
Future Kyoto Protocol communications
Kyoto international transaction log
Kyoto communications hub
EU transaction log (CITL)
UNchecks
Other supplementarytransaction logs Other
checks
Nationalregistry
EU Member State registries
Nationalregistry
Nationalregistry
CDMregistry
Nationalregistry
Nationalregistry
Other Kyoto registries
EUchecks
![Page 9: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/9.jpg)
9
• Create new database or modify CITL database
• Add web service communications (tCERs and lCERs, notifications, STL communications)
• Add functions to interact with STLs (routing and processing communications, reconciliation, data sharing)
• Add transaction types (replacement, expiry date change)
• Add ITL notification functions and running totals
• Modify existing checks and add ITL-specific checks (tCER and lCER checks, transaction-specific checks, reconciliation checks)
• Remove unneeded CITL code (account management, EU-specific checks, EU supplementary unit and transaction types)
Adaptation of CITL code
![Page 10: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/10.jpg)
10
• Unit testing on individual code and database components
• Integration testing of compiled ITL code (with registries and STLs)
- Cover all transaction, reconciliation and notification cases
- Cover all ITL check cases
• Regression testing (after fixes made through earlier testing)
• Performance testing (for efficiency improvements)
- In actual hardware/software environment
- Under realistic load scenarios
Testing the ITL
![Page 11: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/11.jpg)
11
Indicative ITL development schedule
Estimatedcompletion
Review of ITL technical design
Establish development environment
Creation/modification of database Dec 2005
Programme code development and unit testing Mar 2006
Administrator interface development and unit testing Apr 2006
Establish hardware environment
Integration and regression testing (non-STL case) May 2006
Integration and regression testing (STL case) Jun 2006
Performance testing Jul 2006
ITL deployment (including prototype) Jul/Aug 2006
ITL administrator training
![Page 12: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/12.jpg)
12
• Administrator training
• Receipt and review of initialization documentation
• Establishment of VPN connection
• Transaction and reconciliation tests (web services tests)
• Tests for other data submission to ITL
• Full registry tests
• Activation of production environment connection
Concentrate initially on registries not associated with an STL
Initializing registries
![Page 13: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/13.jpg)
13
CITL initialization
• Similar process as for registries
• Establishment of secure ITL-CITL connection
• Data migration schedule (coordinated with EU registry migration), including standardized data migration procedures and scripts
Migration of registry connections from the CITL to the ITL
• One migration round or several?
• Coordination through the administrators cooperative forum
The special EU case
![Page 14: 1 Andrew Howard UNFCCC secretariat ahoward@unfccc.int Progress in implementing the international transaction log Consultations on registry.](https://reader036.fdocuments.net/reader036/viewer/2022082817/56649d9f5503460f94a8aa31/html5/thumbnails/14.jpg)
14
Communications and planning through the cooperative forum
• ITL requirements
• Planning and schedules for development, testing, deployment, initialization (including data and registry migration in the EU case)
Support for initialization
• Provision of ITL prototype
• VPN purchase/configuration support for registries
• Further guidance on documentation
• Initialization support being incorporated in contractor selection
Communications with administrators