Evgenia KoevaCohesion Policy for Environment Directorate
Managing Authority of OPEMinistry of Environment and Water
PREPARATION OF WATER INFRASTRUCTURE PROJECTS ENVIRONMENT OPERATIONAL PROGRAMME
PROGRAMME OBJECTIVES
STRATEGIC OBJECTIVE: – Improvement, preservation and recovery of the
natural environment and development of environmental infrastructure
SPECIFIC OBJECTIVES: – Protection and improvement of water resources
– Improvement of waste management and soil protection
– Preservation of biodiversity and nature protection
PRIORITY AXES
PRIORITY AXIS 1: Improvement and development of water and wastewater infrastructure in settlements with over 2000 PE and in settlements below 2000 PE within urban agglomeration areas
Budget: 1 284 000 000 EUR
Beneficiaries: municipal administrations and river basin management directorates
PRIORITY AXES
PRIORITY AXIS 2: Improvement and development of waste treatment infrastructure
Budget: 367 million EUR
Beneficiaries: municipal administrations, associations of municipalities
PRIORITY AXES
PRIORITY AXIS 3: Preservation and recovery of biodiversity
Budget: 103 million EUR
Beneficiaries: municipalities, NATURA 2000 management administrations, non-governmental organisations
PRIORITY AXIS 1: EUROPEAN LEGISLATION
Compliance with Directive 91/271/EEC concerning urban wastewater treatment
PRIORITY AXIS 1: ELIGIBLE ACTIVITIES
Construction/reconstruction of WWTPConstruction of collectors to WWTPConstruction of main collectors and pump
stations for wastewater collection Construction of sewerage networks Reconstruction/rehabilitation of sewerage
networks Construction/reconstruction of water supply
networks that are located in the routes of the sewers
PRIORITY AXIS 1: FINANCING
- Direct award procedures and beneficiaries
- Prioritisation of agglomerations with a focus on agglomerations above 10 000 PE in the 2007-2013 programming period
PRIORITY AXIS 1: STAGES OF PROJECT PREPARATION (1)
- Preparation of invitations for application that outline eligible beneficiaries and activities, required documentation, specific conditions for application
- Organisation of consultations with the direct project beneficiaries
- Review of feasibility studies by the MA and provision of comments
- Revision of project documentation by the project beneficiaries
PRIORITY AXIS 1: STAGES OF PROJECT PREPARATION (2)
- Review of complete project documentation (feasibility studies, preliminary designs for WWTP, preliminary and detailed designs for sewerage and water supply networks, cost benefit analyses) by the MA and provision of comments
- Revision of documentation and submission of project proposals for evaluation
- Evaluation of the submitted proposals - Contract award upon completion of the
evaluation
PRIORITY AXIS 1: MOST COMMON MISTAKES
- Incorrect estimation of the number of PE
- Incorrect estimation of water consumption per capita
- The feasibility study does not examine the entire collecting and treatment system
PRIORITY AXIS 1: DIRECT AWARD PROCEDURES
- 2010: two direct award procedures for construction and technical assistance+construction (for agglomerations above 10 000 PE)
- 2011: one direct award procedure for construction (for agglomerations between 2 000 and 10 000 PE)
OPE IN SUPPORT OF THE WATER SECTOR REFORM (1)
Recent amendments to the Water Act:
- Public ownership of water infrastructure assets
- Management of water infrastructure by water associations established for each of the 28 designated areas in the country
OPE IN SUPPORT OF THE WATER SECTOR REFORM (2)
In 2012 the MA of OPE launched a direct grant award procedure aimed at supporting the water sector reform and the sustainable management of water infrastructure in the country.
OPE IN SUPPORT OF THE WATER SECTOR REFORM (3)
Planned activities of the procedure:
- Development of a strategy for the water sector- Capacity building of water companies (operators)
and water associations- Development of a single information system for
water services - Development of legislative acts and other documents
that regulate water infrastructure management and performance of water associations
OPE IN SUPPORT OF THE WATER SECTOR REFORM (4)
- Beneficiary: Water Infrastructure Directorate at the Ministry of Regional Development and Public Works
- Budget: 8 400 000 EUR
Cohesion Policy for Environment Directorate MANAGING AUTHORITY OF OPE