BONDING PROPOSALShall Beaverton Rural Schools, Gladw in and C lare Counties, M ichigan, borrow the sum of not toexceed Twelve Million One Hundred Thousand Dollars ($12,100,000) and issue its generalobligation unlim ited tax b onds th erefor, in one or more series, for the purpose of:
erecting, furnishing and equipping a dditions to, and remodeling, equipping and re-equipping and furnishing and re furnish ing school buildings; erecting a transportationmaintenance building; purchasing school buses; acquiring and installing technologyfor school buildings; developing, improving and equipping athletic fields andfacilities, play fields, and playgrounds; and preparing, developing and improvingsites?
The fol lowing is for informational purposes only:The estimated m illage that will be levied for the proposed bonds in 2011 , under current law, is 1 mill($1.00 on each $ 1,000 of taxable valuation). The ma ximu m num ber of years any single series of thebonds may be outstanding, exclusive of any refunding, is fifteen (15) years. The estimated simpleaverage annual m illage anticipated to be required to retire this bond debt is 2.99 m ills ($2.99 on each$1,000 of taxable valuation).If the school district borrows from the State to pay debt service on the bon ds, the school d istrict maybe required to continue to levy mills beyond th e term of the bonds to repay th e State.
/*"(Pursuant to State law, expenditure of bond proceeds must be audited, and the proceeds cannot beused for repair or maintenance costs, teacher, administrator or em ploy ee salaries, or other operatingexpenses.)
503974.wpd
-
8/7/2019 1-23-11 BRS State Treasury APP 1
2/18
Page 2
Financial SummaryBEAVERTON RURAL SCHOOLS
A. Existing Bond Debt List each outstanding debt issue separately in chronologies! order by issue dateIssue Date
6/12/03
mm
FinalMaturityDale5/1/15
m o m
PurposeRefunding
m m
Amount of Original Issue7,800,000
Totals
As of: 10/26/10Current Outstandina Principal Balance
Qualified4,680,000
4,680,000
Non-Qualified
0
Non-Voted
0
Fiscal Year End Balancein Debt Retirement Fund1,192,661
1,192,661
(Tax Year): Mil iageLevied This Year2-80
2 .80
Miliage Estimate forNext Year2.23
2.23Current SB L Fund Balance F J A s of : 10/26/10
Total Amount ofExisting Debt | 4,680,0Proceeds of existing bonds spent?) Yes\(lfNo, provide status o f unaudited bonds)
(Yes or No)B. Proposed Bond IssuList each ballot proposalseparately
Proposal 1Proposal 2Proposal 3Proposal 4
e/Est imated ImpactAmount
$12,100 ,000Bond Term
14 yrs., 1 1,5 mo sAv g Int Rate
4 5 0 %Bond Interest$5,411,114
SLRF Interest$0
Total Interest$5.411,114
Av g Mil iage299
Mil iage Year 11.57
Combined Issue $12,100,000 | 14y rs . . 11 S mo s 4 5 0 % $5.411,114 $0 $5,411,114 2,99 1.57(Totals may not foot due to dif ferences in the f inancial structure of individual proposals and a combined bond issue )
C. Existing Debt + Proposed Bond Issue
D. Key Financial Measures (forinformation purposes only)
E. Financial Assumptions
Total Estimated Miliage Proposed fo r Next Ta x YearMiliage without SLRF participation
(It borrowing from the SLRF )3.80n/a
Bonded Debl toTaxable Value4.92%
Property Valuat ion InformationTa x YearTaxable Value
Current EnrollmentTaxable Value per Pupil
2010340,871,721
1408242,096
Growth RatePrior 5 Yea rs Avg Rate 3.87%Projected Growth Rates: Y e a r s 1 - 5
WinterISummef
[Material Ta x Appeals Pending (Yes or No) NoIf distr ict is aware of any event or circumstance that couldsignificantly affect i ts future TV , disclosure must be included.
School Loan Revolving Fund
Bond IssuesSeries 1Series 2Series 3
Amount11,135.000
965,000Dated Date
5/15/11
Construction FundBe g Date
Jun 11May 17
End DateAnnual Bond MaturityDate
May 15May 21
Weighted average maturity of qualified bonds must not exceed 120% of useful life of assets .Average life of bonds120% of useful life of assets
9.9431.11
4- (number of years) (number of years)
F. CertificationTh e financial impact presented herein is based on certain assumptions regarding interest rates and taxable value growth rates.Actual miliage rates may be subject to adjustment based on differences in these assumptions, actual interest rates, and future taxable value growth.
[Prepared By: Robert J. Naughton J |Firm: Slauder. Barch & Associates, Inc.ATTACH FINANCIAL TABLES.
2_
-
8/7/2019 1-23-11 BRS State Treasury APP 1
3/18
Stauder, B AR CH & ASSOCI ATES, I nc .
BEAVERTON RURAL SCHOOLSEXISTING UNLIMITED TAX DEBT: BEFORE ADDITIONAL BONDING* N IC calculated from: 5/1/10
2003 REFUNDING BON DS - UTQOriginal Amount: $7,800,000Net In terest Cost : 3 .126%
Non-Callable
T a xYear201020112012201320142015201620172018201920 202021202220 2320 2420 25
FiscalYea rEnded6 -30 ,20112012201320142015201620172018201920 20202120 22202320 2420 252026
$4,680, 000Interest
DueNov 1$71
58443015
$221
,681,785,910,728,844
00000000000
,948
Current InterestIn teres t
DueMay 1
$715844
,681,785,91030,72815,844
$ 221
00000000000
,948
InterestRate
2 .8 5 0 %3.000%3.050%3.150%3.250%0.000%0.000%0.000%0.000%0.000%0.000%0.000%0000%0.000%0.000%0.000%
Bonds DatedPrincipalDue
Ma y 1$905,000925,000930,000945,000975,000
00000000000
$4,680,000
6 /1 2 /0 3To ta lP & l
$1,0481,042 ,363,5701,019,8201,006,4551,006,688
$5,123
00000000000
,895
T O T A LTo ta l
Principal$905,000925,000930,000945,000975,000
00000000000
$4,680,000
DEBTTo ta lP&l
$1,048,3631,042,5701,019,8201,006,4551,006,688
00000c00000$5,123,895
P Q N o v I O Draft2 wi thout QSCB 3:50 PM10/28/10
-
8/7/2019 1-23-11 BRS State Treasury APP 1
4/18
Stauder, BARCH & ASSOCIATES, Inc.
BEAVERTON RURAL SCHOOLSEXISTING UNLIMITED TA X DEBT: BEFORE ADDITIONAL BON DING* N IC calculated f rom: 5/1/10
2003 REFUNDING BONDS - UTQOriginal Amount: $7,800,000N et Interest Cost: 3.126%Non-Callable
TaxYear20102011201220132014201520162017201820192020202120 2220 2320 242025
FiscalYear
Ended6-30,2011201220132014201520162017201820192020202120 2220 2320 2420 252026
$4,680,000InterestDueN o v 1$7 158
443015
$221
,681,785,910,728,844
00000000000
,948
Current InterestInterestDueMay 1$71
5844
,681,785,910
30,72815,844
$ 2 2 1
00000000000
948
InterestRate2.850%3.000%3.050%3.150%3.250%0.000%0.000%0.000%0.000%0.000%0.000%0.000%0.000%0.000%0.000%0.000%
Bonds Dated 6 /1 2 /0 3PrincipalDueMa y 1$905 ,000925,00093 094 5 ,000,000
975,000
$4,680,
0000000000000 0
To ta lP&l$1,048 ,3631,042,5701,019,
1,0061,006
820,455,688
00000000000
$5,123,895
T O T A LT o ta l
Principal$905,000925,000930,000945,000975,0000
0000000000
$4,680,000
DEBTTotalP&l
$1,048,3631,042,5701,019,8201,006,4551,006,6880
0000000000$5,123,895
P Q N o v I O Draft2 wi thout QSCB3:50 PM10/28/10
-
8/7/2019 1-23-11 BRS State Treasury APP 1
5/18
PQNovIO Draft2 w/ o QSCB2017 Series $965,000BEAVERTON RURAL SCHOOLSCOUNTIES OF GLADWIN AND CLARE, STATE OF MICHIGAN
PROPOSED 2017 SCHOOL BUS BONDS(GENERAL OBLIGATION - UNLIMITED TAX)
SCHEDULE OF ESTIMATED CONSTRUCTION FUND EARNINGS
A v erage Life = 1.70 years
EXPENDITURE ACTIVITYConstruct ion Other FeesDate Projects and CostsMay 17May 17 $Jun 17Jul 17Au g 17Sep 17Oct17Nov 17Dec 17Jan 18Feb 18Mar 18Apr 18May 18Jun 18Jul 18Au g 18Sep 18Oct18Nov 18Dec 18Jan 19
Feb 19Mar 19Apr 19May 19Jun 19Jul 19Aug 19Sep 19Oct19Nov 19Dec 19Ja n 20Fe b 20Mar 20Apr 20May 20Jun 20Jul 20Aug 20Se p 20Oc t 2 0No v 20Dec 20Jan 21Feb 21Ma r 21
Apr 21May 21Jun 21Jul 21
197,300 $59,26700000000000200,98000000000000
204,7300000000000208,560000000000000106,36600
Tota ls
$256,56700000000000200,98000000000000
204,7300000000000208,560000000000000106,36600
Month
1234567891011
1213141516171819202122232425262728293031323334353637383940414243444 5464748495051
ConstructionFundPayout % Balance
26.26%26.26%26.26%26 26%26.26%26.26%26.26%26.26%26.26%2 62 6%26.26%26.26%46.82%46.82%4 6 8 2 %46.82%46.82%468 2 %46.82%46,82%46.82%46.82%4 6 8 2 %46.82%67.77%67.77%67.77%67.77%67.77%67.77%6777%67,77%67 77%67.77%67.77%89.12%89.12%89,12%89.12%89 12 %89.12%89.12%8 9 1 2 %89 12%89.12%89.12%89.12%89.12%
100.00%100.00%100.00%
$965,000708,433708,876709,319709,762710,206710,650711,094711.539711,983712,428712,874713,319512,785513,105513,426513,747514,068514,389514.711515,033515.354
515.677515,9995 1 6 ,3 21311,914312,109312,304312,499312,695312,890313,086313,281313,477313,673313,869105,505105,571105,637105,703105,769105,835
105,901105,968106,034106,100106,166106.233106,299000
ProjectedInterest InterestRate Earned
0.75%0.75%0,75%0.75%0.75%0.75%0 7 5 %0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0 7 5 %0.75%075%0 7 5 %0.75%0.75%0.75%
0.75%0.75%0.75%0.75%0 7 5 %0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%0.75%
$44344344344444444444 444544 544 544 6
44632032 13213 2 13213213223223223 2 23 2 23 23
19 519 519519 519519619619619619619 6666666666666666666666666660
00$917.936 $5 9,26 7 $977.202
PQNo vI O Draft2 without QSCB, 2017 Series
STAUDER, BARCH & ASSOCIATES, INC.Uuniripal Bond Financial and Marketing Consultants3989 Research Park DriveAnn Arbor, Michigan 48108(734) 668-6688 Fa x (734) 668-6723
$1 2,20 2Breakdown of Estimated Other Fees and Costs
OTHER FEES:Municipal Advisory Council Fe eAuditor's Subsequent Events ReviewBond AttorneyConstruct ion Manager (Incl. in Construction Costs)Financial ConsultantQualification of BondsOther:Credit Ratings $6,500Official Statement Printing & Mailing 5,500Treasury Filing 193T O T A L OTHER FEES
$2005007,892
07,7614,000
12,193$32,547
OTHER COSTS:Election, Notice o f Sale, Bond Printing, etc.Capitalized Interest: x mos. @ x%Bond Discount 2.000%Bond Insurance ( incl. in Bond Discount)OtherTOTAL OTHER COSTS:TOTAL OTHER FEES AND COSTSTo ta l Project CostLess Construction Fund EarningsAMOUNT OFBOND ISSUE _Estimated Construction Fund Deposit
$7,420019,30000J26.720
$59,267$977,20212,202
$965,000.00$905,733
RJN
-
8/7/2019 1-23-11 BRS State Treasury APP 1
6/18
PQNov10Draf t2BEAVERTON RURAL SCHOOLS
Bus Replacement Plan
Year123456789
1011
Date ofBus Order QuantityApr/A p r /Apr/A p r /Apr/A p r /Apr/A p r /Apr/A p r /
May 11May 12May 13May 14May 15May 16May 17May 18May 19May 20Ma y 21
20221022221
16
Unit Price*80,00081,60083 , 23284,89786,59588,32690 , 09391,89593,73395,60797,520
Order16 016 6169
8618 018318719197
11,423,
,0000
,464,793,595
0,186,790,466,215,520027
Contingency003 , 3363,4071,735
017,11417,19017,26417,345
8,846$86 ,23 9
Total16016917388197200204208106
$1,509,
,0000
,800,200,330
0,300,980,730,560,366266
EstimatedDate to beReplaced"May 19Ma y 20Ma y 21Ma y 22May 24Ma y 25May 26May 27Ma y 28
/ 2 11227 2 31 2 5/261 2 71 2 8/2 9
* Unit price assumes 2% annual inflation.** Assumes buses are replaced every 7- 8 years.STAUDER, BARCH & ASSOCIATES, INC.
Municipal Bond Financial and Marketing Consultants3989 Research Park Drive
Ann Arbor, Michigan 48108Phone (734) 668-6688 Fax (734) 668-6723
RJN10/28/10
PQNov10Draft2 without QSCB, BusPlan11a 10/28/10 3:50 PM
-
8/7/2019 1-23-11 BRS State Treasury APP 1
7/18
PQNovIC Final w/o QSCB$12,100,000
BEAVERTON RURAL SCHOOLSCOUNTIES OF GLADWN AND CLARE. STATE OF MICHIGAN
PROPOSED 2011 & 2017SCHOOL BULDING AND SITE AND BUS BONDS(GENERAL OBLIGATION - UNLIMITED TAX)
Schedule of Estimated Millage Needed to Retire Banded DebtF/Y
Tax EndYear 6-30,2010 20112011 20122012 20132013 20142014 20152015 20162016 20172017 20182018 20192019 20202020 20212021 20222022 20232023 23242024 20252 0 2 5 20262026 20272027 20282028 2 0 2 92029 2030
QuaifiedExisting Interest Interest
Debt Due Due$3 775 000 Nov 1 May 1$1,048,363 $0 $0
1,042.570 231,051 [1] 250,5381,019,820 250,538 250,5381,006,455 250.538 250,5381,006,688 250,538 250,538
0 248,738 248,7380 229,725 229,7250 209,813 209,8130 189.900 189,9000 169,538 169.5380 148.275 148.2750 126.113 126,1130 102,938 102,9380 78,638 78,6380 53.325 53.3250 26.888 26.8880 0 00 0 00 0 00 0 0
$512 3895 $2.566.551 $2.586.038
Amount:NC
DatedDelivered:1.5Ralio:
DebV(TV+IFT):Bond Term
Capitaized Int.Series 2011
InterestRate
4.500%4.500%4.500%4500%4.500%4.500%4.500%4.500%4500%4 500%4.500%4.500%4.500%4.500%4.500%4.500%4.500%4 500%4.500%4.500%
PrincpaDue
May 1$0000
80,000845,000885,000885,000905.000945.000985.000
1,030,0001,080,0001,125,0001,175,0001,195.000
0000
$11,135,000
Series 2011TotaP&l
$04 8 1 , 5 8 9501,075501,075581,075
1,342,4751,344,4501,304,6251,284,8001.284,0751,281,5501 , 2 8 2 . 2 2 51,285,8751,282,2751,281,6501,248,775
0000
$16,287,589
Scries 2011$11,135,0004 50%
May 15, 11May 15. 11
TRUE4.34%
14yrs.. 11.5 mos.$000
Series 2017Princpa
DueMay 1
$00000000
55,00090.000
130,000135.000135.000140,000140,000140,000
0000
$965 000
Series 2017$965.0004.50%May1. 17May1, 17
TRUE3.08%
9 yrs , 0 mos.$0.00
Int. Rate: 4.50%Series 2017
TolalP&l
$0000000
4 3 , 4 2 598,425
130,950166,900166,050159,975158,900152,600146,300
0000
11223,525
120% ol Proiect Useful Je > Ava. Life of Bond Term120% Proiect Useful Lfe Averaoe Lfe
Series 2011Series 2017
Tota Both SeriesI 10.28T 5.95
31.11 9.94
Taxable Vaue Growth Hstory200520062007200820092010
$282,661,294301,468,645 665%318,928,342 5.79%328,274,253 2.93%349.098,292 6.34%340.871,721 -2.36%
A v e r a g e Growth Rate: 3.87%Tota (Use) ot
TolalProposed
Debtso
481,589501,075501,075581,075
1,342,4751,344,4501,348,0501.383,2251,415,0251.448,4501.448,2751,445,8501.441,1751.434,2501,395,075
0000
$ 1 7 . 5 1 1 . 1 1 4
Existing & Plus Deq Funds onProposed A owance Hand Net Existing
Debl 1000% $1,192,661 Proposed Debt$1,048,363 $96,106 ($183,412) $961,056
1,524,159 31,715 (277,669) 1,278,2041,520,895 (242,691) 1,278,2041,507,530 (216,544) 1,290,9861,587,763 (272,345) 1,315,4181.342,4751,344,4501,348,0501,383,2251,415.0251,448,4501,448,2751,445.6501,441.1751.434,2501,395.075
0000
0 1,342,4750 1.344,4500 1,348,0500 1,383,2250 1,415,0250 1,448,4500 1,448.2750 1,445,8500 1,441,1750 1,434,2500 1,395,0750 00 00 00 0
Projected GrowthTxbl Vaue [3] Rate
$343.234,221 -2.36%336,369,537 -2.00%336,369,537 000%339.733,232 100%346,527,897 2.00%353,458.455 2-00%362,294,916 2.50%371.352,289 2.50%380,636.096 2.50%390.151.998 2.50%399,905,798 250%409,903.443 2.50%420,151.029 2.50%430.654,805 2.50%441,421,175 2.50%452,456,705 2.50%463,768,122 2.50%475,362,325 2.50%487,246,383 2.50%499,427,543 2.50%
July Levy. 100%Proposed Levy 3 80Current Levy 2.80Net Increase 100
Mi sNeeded Mi s
ALL SERIES NeededAvg 2.99 | AlDebl
2.801.57 3.801.49 3801.47 3.801.68 3.803.80 3.803.71 3.713.63 36 33.63 3.633.63 3.633.62 3.623.53 3.533 .4 4 3 4 43.35 3353.25 3.253.08 3.08
0000000.000.00
$22,635,009 J127.820 ($1.192.661 $21,570,168[1] 5 mos. 16 days interest.[2] Incudes $0 of Existing LTNQ Debl and $3,775,000 of Existing UT Debt as of Dated Date.|3] Incudes $2,362,500 of Equivaent IFT Vauations andLess DDA/TIFA Deb Captures of $0
PQNovfO Fntl vathout QSCB. PONovfO Fn/without QSCB STAUDER, BARCHt ASSOCIATES, INC. (734) 668-6688 11/4/10 11:46AM
-
8/7/2019 1-23-11 BRS State Treasury APP 1
8/18
3881 Page 4-1
Project Sheet
Name of School Building: Primary School
Description of Proposal or Series 1 Project:Classroom(s) addition, classroom(s) remodel, media center remodelan dtoilet room(s) remodel. Multi-purpose an d school administration office(s)addition. Remove and replaceapproximately 32,200 s.f. roof area.Remodeling of kitchen and cafeteria, approximately 2,500 s.f. in area.Demoliton of existing structure(s).Telephone systems, public address, security systems, wireless network,data network and technology infrastructure upgrades.Description of Proposal or Series 2 Project:
Description of Proposal or Series 3 Project:
Instructional Technology DescriptionComputers, printers, sound enhasncement systems,projectors, classroom response system.
Site Work DescriptionRemoval of existing parking lot / drive.New parent and bus drop off, parking and drives.Remodel playground area and equipment.
Type of Project:D Ne w Building0 Addition(s)0 RemodelingO Facility Closing O Demolish0 Site Work
N ew Construction Square FtN ew Addition Square Ft. 22,000
Cost per Sq FtC o s t per Sq Ft 138.28
O Retain for future use O Convert to non-instructionalO Sell or Lease O Undetermined
Statement describing any existing environmental or usability problems the proposed project will address.(ex: asbestos, energy use, or ADA requirements)Energy efficiency will be increased with the removal and replacement of roofing materials. Remodel of toilet rooms willaddress ADA requirements. Fire suppression additions to kitchen equipment. Illuminated exit signage and fire alarmadditions. Newsecure entrance will control access to school and student population.Estimated Cost of Proposed Construction Project: (Attach analysis showing how cost estimates were calculated.)
Total Proposal/Series 1 Proposal/Series 2 Proposal/Series 3Ne w ConstructionRemodelingConstruction ContingenciesInstructional TechnologyLoose Furnishing/EquipmentBusesSite WorkSite AcquisitionArchitectural Fees and CostsCM Fees an d CostsEstimatedCosts(Not including election or bond issuance costs)
$3,042,200$689,594$257,419$196,709$80,000
$0$312,500
$0$264,056$353,671
$3,042,200$689,594$257,419$196,709$80,000
$0$312,500
$0$264,056$353,671
$5,196,149 $5,196,149 $0 $0
Certificate by Registered ArchitectI certify that the details of the proposed project(s) described above
/-->*--~*/Signature10/28/10
Date
and the attached detail relative to the construction pro|ect(s) are true and correct to the best ot my knowledge and bel
Scott T. Hoeft Integrated Designs, Inc. #1301032176Printed Namescott(3>intdesians.comE-mail Address
810-220-6767Fax Number
Firm Name and License810-229-2701
ef.
Number
Area Code and Telephone Number
-
8/7/2019 1-23-11 BRS State Treasury APP 1
9/18
3881
Enrollment Projections
[ N am e of School District: Beaverton Rural Schools [District Code Number: 26-010Complete this form af ter acquir ing an enrol lment project ion report from an approved enrol lment project ion prov ider. Official enrol lment project ions should be based on the most recent fall memb er s h ip c oun t
Grade1
101112
Tota ls
Preceding5- Year
Enrollment(Year)
CurrentEnrollment
1009691929612312210711 8100
( Y e a r )Projected 5-Year
Enrollment
109105149
1,495 1,408Subtotals by School District's Grade Configuration: *
868081958698
106101100113140129106
1,321
(Co l 4 - Co l 3 ) / Co l 3Projected Enrollment
Change (%)-14.00%-16.67%-10.99%
3.26%-10.42%-20.33%-13.11%
-561%-15 .25%13.00%28.44%22.86%
-2886%-6.18%
Projection WorksheetEnrollment Consultants Projections
Low6
868081958698
106101100113140129106
1,321
Median7
8581809890
103109112107125157146118
1,411
High8
858381
10193
107112
1 2 1114133179163130
1,502
342491488
1,321
344521546
1,411
350547605
1,502Explanation of Method Selected
1.5 projec t ions utilized,expecting enrollments to fall between Imost likely and high closer to the most likely.Two times the most likely plus the high, divided by three.
Prepared By : Integrated Designs, Inc. Source: Middle Cities Education Association
0
-
8/7/2019 1-23-11 BRS State Treasury APP 1
10/18
Wolgas t Corporat ionIntegrated Designs BEAVERTON RURAL SCHOOLSCONCEPT BU DGET SUMMARY 11/4 /2010
School Description BudgetBeav er t on Rural SchoolsPrimary SchoolRoof ReplacementPrimaryParking Lots38,000 sq ft - New Parking and Drives9,200 sq ft - New Concrete Walks
Demo Existing StructuresRelocate Playground EquipmentSite Restora t ion related to additionsN ew Multi-purpose Gym/Secure Entrance/Storage/Toi lets/Off iceInfrastructure TechnologyThree New Classroom s and Two Toi let Rooms/Toi let UpgradesRenovate Exist ing CafeteriaRenovate Existing KitchenKitchen EquipmentUpdate Electric/Storage/FlooringConstruction Cost SubtotalA /E FeesCM FeesConstruction Support CostContingencyBusesFurniture/EquipmentInstructional TechnologyTOTAL BOND ISSUE COSTS
$138,500.00$180,500.00$40,000.00
$27,000.00$20,000.00$45,000.00$2,143,000.00$160,945.00$899,200.00$63,700.00$122 , 500 . 00$125 , 000 . 00$78,949.00$4,044,294.00
$264, 056 . 00$25 7 ,21 9 .0 0$96,452.00$257,419.00$0 . 00$80,000.00$196,709.00
$5,196,149.00
ID
-
8/7/2019 1-23-11 BRS State Treasury APP 1
11/18
3881 Building Utilization Page 5- 1
Existing/Adequate
(K-2) Lower Elementary(3-5) Upper Elementary(6-8) Junior High(9-12) High SchoolSub Totals
Remodeled
(K-2) Lower Elementary(3-5) Upper Elementary(6-8) Junior High(9-1 2) High SchoolSub Totals
Proposed New
(K-2) Lower Elementary(3-5) Upper Elementary(6-8) Junior High(9-1 2) High SchoolSub Totals
Total Teac hingStations
List # ofTeachingStations
310
13
List # ofTeachingStations10
1
List # ofTeachingStations
12
3
17
Current Gr. StructureProposed Gr. Structure
K-3K-3
Capacityx Factorx 20 =x 25 =x 22.5 =x 21.25 =
CapacityX Factorx 20 =x 25x 22.5x 2 1 .2 5 =
Capacityx Factorx 20 =x 25x 22.5 =x 21.25 =
TotalCapacityProjected5-YearPn'/\llm int
Utilization Percentage(Projected 5-Year Enrollment / Total Capacity)
Capacity
6025000
310
2000020
20500070
400
342
86%
1 List the number of teaching station inappropriate column.
2 Calculate total capacity using th eapplicable capacity factor.
3 Enter five (5 ) year projected enrollment.4 Calc ulate building utilization rate.
5 Attach floor and site plan of the building.Show th e rooms and category (adequate,remodeled, proposed new, closed).Number the teaching stations inconsecutive order.
List # ofFacility to be Closed Teaching x CP< = ., rsctorStations
(K-2) Lower Elementary x 20(3-5) Upper Elementary x 25(6-8) Junior High x 22.5(9-1 2) High School x 21.25 =Total Teaching Stations 0
Square Footage for TotalClosed Facility Capac ity
Capacity
0000
0
Please transfer applicable informationto the Utilization Summary on Page 7 ofthe aoolication.
-
8/7/2019 1-23-11 BRS State Treasury APP 1
12/18
Pa g e 6-1
Facility Condition AssessmentProject Number
Perform w alkthroug h inspection of the facility including special-use area s such as the cafe teria, art rooms, industr ial arts are as ,an d science labs. P lease complete th e following assessment form by responding to ALL statements.
Primary SchoolPlease provide an overall assessmentof each section or comment on anydeficiencies or special circumstances:
Health Section : Yes NO | N /A1, |Visible mold/damage does no t exist due to past or present water/mqislurejeaks. ~ ~ X2 Indoor surfaces are free of loose and peeling paint. X3 Air temperature is comfortable throughout the building. X_ 4 ^ |Unique/objectionable odors are not present in specificJaTeas or tTJrouqh'gjjnFe building." ~ "xOverall assessment or comments:
Life Safety Section _ Lje!_!_-b" N/A_v _ Lighted ex it signs ar e present at each entrance/exit_and are clearly visible. X2. Fire suppression equipment is present in kitchen, science rooms and corridors.^ X3 W ash room facilit ies ha ve barrier free accessibility. X4. Building acces s is limited to select, controlled entries. X
Overall assessm en t or comments:Kitchen is not a full service kitchen, appropriate fire extinguishers provided at kitchen, science rooms and corridors. Existing kitchen hood not f i re suppressed.Illuminated exit signage not present. Fire alarm pull stat ions not located near exitways.
structural section ; yes ! N O i N /A1. Inside masonry walls do not show visible signs o f cracks beyond normal aging. _ j_ _ X _ _2. Surface cracks do not exist around perimeter of interior/exterior doors and windows. _ X j3. Roof structure does no t show visible signs of damage, X j4 Building e xte rior is intact and does not showj/isible deterioration beyondjiormal aging._ _XOveral l assessment or comments:
Mechanical Section [ Yes | N o j N/A1. ! Windows an d exterior doo rs preve nt inefficient ai r l e a k a g e . X2. | W ater pressure exists to wash hands^supp}y water_f_ountains, and flush toilets. X_3 . W ater drains quick ly f rom sinks. i _ _ X > _ _4. Floor area near toilets and sin_ks is djry__ [_ X j_
Overall assessment or comments:
Electrical Section i Y e s I _ N O J_N/A_1. jTighting sys tem provides adeq uate intensity, 'diffusion', and distribution of iliumination. "_ "__ X j~ '2. Electrical controls are safely protected and accessible. X J3. |Classrooms have sufficient outlets to prevent regular use of electr ical extension cords. X.4. I The proximity of electr ical systems or panels is dry and free of standing w ater . X _Overall assessm en t or comments:
Certificate by Registered ArchitectI certi fy that I have assessed the factors described above and that the conditions relative to the faci l i ty are true and correc t to the best of my knowledge and belief.
Scott T. Hoeft Integrated Designs, Inc * 1301032176Signature Printed Name
[email protected] 810-229-6767
Firm Name and License Number
810-229-2701E-mail Address Fax Number Area Code and Telephone Number
-
8/7/2019 1-23-11 BRS State Treasury APP 1
13/18
3881 Page 4- 2
Project Sheet
Name of School Building: Middle School
Description of Proposal or Series 1 Project:Remodel of building primary entrance and administrative office.Additional lockers and corridor(s) remodel.Remove and replace approximately 78,300 s.f. roof area.Telephone systems, public address, security systems, wirelessnetwork, data network and technology infrastructure upgrades.
Description of Proposal or Series 2 Project:
Description of Proposal or Series 3 Project:
InstructionalTechnology DescriptionComputers, printers, sound enhasncement systems,projectors, classroom response system.
Site Work DescriptionRemove and replace 185,000 s.f.parking surfaces.Playground equipment and surfacing.
Cost per Sq FtCost per Sq Ft
Type of Project:EH Ne w Building > New Co nstruction Square FtD Addition(s) > New Addition Square Ft.0 RemodelingDFacility Closing ->ODemolish O Retain for future use O Convert to non-instructionalED Site Work O Sell or Lease O Undetermined
Statement describing any existing environmental or usability problems the proposed project wil l address.(ex: asbestos, energy use, or ADA requirements)Energy eff iciency wil l be increased with the removal and replacement of roofing materials. New secure entrance wil l controlaccess to school and student population.
Estimated Cost of Proposed Construction Project: (Attach analysis showing how cost estimates were calculated.)Total Proposal/Series 1 Proposal /Series 2 Proposa l /Series 3
Ne w ConstructionRemodelingConstruction ContingenciesInstructional TechnologyLoose Furnishing/EquipmentBusesSite WorkSite AcquisitionArchitectural Fees and CostsCM Fees and Costs
Estimated Costs(Not including election or bond issuance cos ts )
$0 s o$693,550$77,920$54,040
$0$0
$562,000$0
$75,900$101,655$1,565,065
$693,550$77,920$54,040
$0$0
$562,000$0
$75,900$101,655$1,565,065 $0 $0
Certificate by Registered ArchitectI certify that the details of the proposed project(s) described ab ove and the at tached detail relat ive to the construction pro ject ( s ) are true and correct to the best of my knowledge and belief.
Signature10/28/10
Scott T. He-eftPrinted Namescott(5)intdesians-corn
Date E-mail Address8 10 - 2 2 0 - 67 67Fax Number
Integrated Designs, Inc.#1301032176Firm Name and License Number810-229-2701_Area Code and Telephone Number
-
8/7/2019 1-23-11 BRS State Treasury APP 1
14/18
Wolgast CorporationIntegrated Designs B EAV ERT O N RU RAL SCH O O L SCONCEPT BUDGET SUMMARY 11 /4 /2010
School Description Budget_eaverton Rural Schools Middle/Elementary SchoolRoof ReplacementMiddle/Elementary SchoolParking LotsMiddle/Elementary School1 85,000 sq ft - Remove/Replace AsphaltNe w Secure Front EntranceInfrastructure TechnologyRemodel Existing Offices and Add A/ CAdd Lockers to North End of Building (1 50 )New playground EquipmentReplace Condenser/Evaporator CoolerConstruction Cost SubtotalA/E FeesCM FeesConstruction Support CostContingencyBusesFurniture/EquipmentInstructional Technology
$538,550.00
$462,000.00$25,000.00$44,000.00$35,000.00$36,000.00$100,000.00$15,000.00
$ 1 ,255,550.00$75,900.00$73,935.00$27,720 00$77,920.00$0.00$0.00$54,040.00
TOTA L BOND ISSUE COSTS $1 ,565,065 00
-
8/7/2019 1-23-11 BRS State Treasury APP 1
15/18
3881 Building Utilization Page 5- 2
Middle School
Existing/Adequate
(K-2) Lower Elementary(3-5) Upper Elementary(6-8) Junior High(9-1 2) High SchoolSub Tota ls
Remodeled
(K-2) Lower Elementary(3-5) Upper Elementary(6-8) Junior High(9-1 2) High SchoolSub Tota ls
Proposed N ew(K-2) Lower Elementary(3-5) Upper Elementary(6-8) Junior High(9-1 2) High SchoolSub Totals
Total TeachingStations
List # ofTeachingStations
1 116
27
List # ofTeachingStations
00
0
List # ofTeachingStations
0
27
Current Gr. Structure
Proposed Gr. Structure
4-8
4-8
CapacityX Factorx 20 =x 25x 22.5 =x 21.25 =
Capacityx Factorx 20 =x 25x 22.5x 21.25 =
CapacityX Factorx 20 =x 25x 22.5 =x 21.25 =
TotalCapacityProjected5-YearCnrnman
Utilization Percentage(Projected 5-Year Enrollment / Total Capaci ty)
Capacity
02753600
635
00000
00000
635
491
77%
1 List th e number of teaching station inappropriate column.2 Calculate total ca pacity using th eapplicable capacity factor.3 Enter five (5 ) year projected enrollment.4 Calculate building utilization rate.5 Attach f loor and site plan of the building.Show th e rooms and category (adequate,remodeled, proposed new, closed).
Number the teaching stations inconsecutive order.
List # o f C3D3Ct TVFacility to be Closed Teaching x c =_. . rSCtOrStations(K-2) Lower Elementary x 20 =(3-5) Upper Elementary x 25(6-8) Junior High x 22.5(9-12) High School x 21.25 =Total Teaching Stations 0
Square Footage fo r Tota lClosed Facility Capacity
Capacity
0000
0
Please transfer applicable informationto the Utilization Summary on Page 7 ofthe app l ica t ion .
-
8/7/2019 1-23-11 BRS State Treasury APP 1
16/18
Facility Condition Assessment'roject Number'erform walkthrough inspection of the facility including special-use areas such as the cafeter ia, art rooms, industrial arts areas ,nd science labs. Please complete the following assessment form by responding to ALL statements
Middle SchoolPlease provide an overall assessmentof each section or comment on anydeficiencies or special circumstances:
tealth Section. _ _ . . _2. I Indoor surfaces are free of loose and peeling paint.j9_Eas^opresent water/moisture leaks.! Yes | No j N/A__
Ai r temperature is comfortable throughout the building.Unique/objectionable odors are not present in specific areas or 9l[ojjgfvoyyhbuilding.
XXiverall assessment or comments
.ife Safety Section1_ Lighted'exit signs are present at each entrance/exit and_are clearly visible.3.
Fire suppression equipment is present in kitchen, science rooms and corridors.Washroom facilities have barrier free accessibility.
Ye s i No i N/ A"x~l i~ ~X jBuilding access is limited to select, controlled entries.
iverall assessment or comments:W ashroom facilities accessible, but toilet room fixtures and toilet stall configeration do not meet the current barrier f ree requirements
structural sectionl.~[lnside masonry walls do not sh o w visible signs o f cracks beyond normal aging.2. i Surface cracks do not exist around perimeter of interior/exterior doors and windows.3. j Roof structure does not show visible signs of damage.4. IBuilding exterior is intact an d does no t show visible deterioration beyond normal aging, _ _
)verall assessment or comments: There are approximately 10 to 12 lintels on the old gymnasium wing which are very corroded and sagging.
Yes_!_ _No i N/A__X _ jX
Mechanica l Section.! ' W indo ws and exterior doors prevent inefficient air leakage.2 . | Water pressure exists to wash hands, supply water fountains, and flush toilets._ 3 . _ | Water drains quickly from sinks.4. ~| Floor area near toilets an d sinks is dry.
j Yes I No ! N/AJUKI)verall assessment or comments. Some air infultration at door thresholds at some exterior doors. x i
i_
Electrical Section1. (Lighting system"provides adequate intensity, diffusion, an d distribution of illumination.2.
! Yes I No
3Electrical controls are safely protected an d accessible.Classrooms have sufficient outlets to prevent regular use of electrical extension cords.The proximity of electrical systems or panels is dry and free of standing water.
iverall assessment or comments:
X"xx
Certificate by Registered Architectcertify that I have assessed the factors described above and that the conditions relative to the facility are true and correct to the best of my knowledge and belief
Scott T. Hoeft Integrated Designs, Inc.# 1301032176ignature
0/28/10
Printed Name
scott(5)intdesiqns.com 810-229 -6767
Firm Name and License Number
810-229 -2701E-mai l Address Fax Number Area Code and Telephone Number_
\\c
-
8/7/2019 1-23-11 BRS State Treasury APP 1
17/18
-
8/7/2019 1-23-11 BRS State Treasury APP 1
18/18
Wo lg a s t Corporat ionIntegrated Designs BEAVERTON RURAL SCHOOLSCONCEPT BU DGET SUMMARY 11/4 /2010
School Description BudgetBeaverton Rural Schools High SchoolAsphalt Resurfacing (170,000 sf )Turf - NaturalHome Bleachers (1000 seat ing) with Storage UnderneathVisitors BleachersPress BoxStadium LightsTrack Resurface (8 Lanes)Move Long Jump, High JumpRevise Raised Grade @ BleachersRenovate Present Baseball & Softbal l FieldsRemove Exist ing Tennis Courts /Si te Re storat ionRevision to Front Entrance w/Secure Vest ibuleRelocate Exist ing Lockers to Corridors (424 Lockers)Infrastructure TechnologyRenovate Exist ing Locker Space to Gathering SpaceRemodel Exist ing Media Center for Open Computer Labs,Update Shelving and Seating, and New Exterior Exit.Cafeteria to Gathering Space Addit ions
Construction Cost SubtotalA/ E Fe eCM FeeConstruction Suppo rt CostContingencyBusesFurniture/EquipmentInstructional Technology
$60,000.00$160,000.00$287,000.00$47,500.00$81,000.00$194,500.00$178,800.00$16,200.00$37,800.00$400,000.00$25,00000$225,000.00$57,25000$274,400.00$226,525.00$106,180.00$64,800.00
$2,441,955.00$181,730.00$177 , 03000$66,375.00$143,190.00$0.00$10,000.00$335,350.00
TOTAL COSTS $3,355,630.00