07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2...

125
SECTION 00001 TABLE OF CONTENTS PAGE 1 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION Cover Section 00001 Table of Contents PROCEDURAL DOCUMENTS Bidding Requirements: Section 00003 Invitation to Bid Section 00004 Instructions to Bidders (A.I.A. Document A701) Section 00005 Supplementary Instructions to Bidders Section 00006 Bid Form - General Contractor Section 00007 State of CT Commission on Culture & Tourism Notification to Bidders Form Section 00008 Commission on Human Rights and Opportunities Form CONTRACT DOCUMENTS General Conditions: Section 00009 General Conditions of the Contract for Construction (A.I.A. Document A201) Section 00010 Supplementary General Conditions Forms of Contract and Affidavit: Section 00011 Standard Form of Agreement Between Owner and Contractor (AIA Document A101) DIVISION 1 - GENERAL REQUIREMENTS Section 01100 Summary of Work Section 01140 Work Restrictions Section 01250 Contract Modification Procedures Section 01290 Payment Procedures Section 01310 Project Management and Coordination Section 01330 Submittal Procedures Section 01400 Quality Requirements Section 01500 Temporary Facilities and Controls Section 01600 Product Requirements Section 01700 Execution Requirements Section 01731 Cutting and Patching Section 01732 Selective Demolition

Transcript of 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2...

Page 1: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00001 TABLE OF CONTENTS

PAGE 1 OF 2

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

Cover Section 00001 Table of Contents PROCEDURAL DOCUMENTS Bidding Requirements: Section 00003 Invitation to Bid Section 00004 Instructions to Bidders (A.I.A. Document A701) Section 00005 Supplementary Instructions to Bidders Section 00006 Bid Form - General Contractor Section 00007 State of CT Commission on Culture & Tourism Notification to Bidders

Form Section 00008 Commission on Human Rights and Opportunities Form CONTRACT DOCUMENTS General Conditions: Section 00009 General Conditions of the Contract for Construction (A.I.A. Document A201) Section 00010 Supplementary General Conditions Forms of Contract and Affidavit: Section 00011 Standard Form of Agreement Between Owner and Contractor (AIA Document A101) DIVISION 1 - GENERAL REQUIREMENTS Section 01100 Summary of Work Section 01140 Work Restrictions Section 01250 Contract Modification Procedures Section 01290 Payment Procedures Section 01310 Project Management and Coordination Section 01330 Submittal Procedures Section 01400 Quality Requirements Section 01500 Temporary Facilities and Controls Section 01600 Product Requirements Section 01700 Execution Requirements Section 01731 Cutting and Patching Section 01732 Selective Demolition

Page 2: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00001 TABLE OF CONTENTS

PAGE 2 OF 2

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

Section 01770 Closeout Procedures DIVISION 3 – CONCRETE Section 03300 Miscellaneous Cast-In-Place Concrete DIVISION 6 - WOOD AND PLASTICS Section 06105 Miscellaneous Carpentry Section 06402 Interior Architectural Woodwork DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07610 Sheet Metal Roofing Section 07620 Sheet Metal Fabrications (countertops & sinks) DIVISION 9 - FINISHES Section 09930 Stains and Transparent Finishes

Page 3: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00003 INVITATION TO BID

PAGE 1 OF 1

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

FLORENCE GRISWOLD MUSEUM

LANDSCAPE CENTER / BARN RENOVATIONS

SEALED BIDS will be received until 2:00 PM, Tuesday, December 2, 2008 at the Office of the Director, Florence Griswold Museum, Connecticut 06371, at which time they will be publicly opened and read aloud. Bids received after this time will be rejected. The Owner reserves the right to reject all bids or waive defects in same if it is deemed to be in the best interest of the Owner. The Florence Griswold Museum is an Affirmative Action/E.O.E. Bids shall be sealed and directed to: Ted Gaffney, Facilities Manager The Florence Griswold Museum 96 Lyme Street Old Lyme, Connecticut 06371 The successful Bidder will be required to furnish a satisfactory Performance, Labor and Materials Payment Bond for the full amount of the contract. After the opening of Bids, all proposals shall stand available for acceptance for 90 calendar days. A pre-bid conference will be held at 2:30pm on Thursday, November 13, 2008, at the project site. The pre-bid conference is not mandatory, but potential bidders are strongly encouraged to attend. One set of Specifications and Project Manual will be provided to each Bidder at no charge. Additional sets may be purchased by ordering and reserving the number of sets desired, prior to pick up, at the office of Bianco Giolitto Weston Architects, 500 Plaza Middlesex, Middletown, CT 06457; 860-344-9332. The Florence Griswold Museum reserves the right to reject any or all bids. Contract will be awarded to the responsible bidder whose bid, conforming to all material terms and conditions of the invitation for bids, is the lowest in price. This project is partially funded by the Commission on Culture & Tourism’s Historic Restoration Fund.

Page 4: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00004 INSTRUCTIONS TO BIDDERS

PAGE 1 OF 1

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

INSERT A.I.A. DOCUMENT A 701 HERE

Page 5: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00005 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

PAGE 1 OF 2

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

The following supplements modify the "Instructions to Bidders", AIA Document A701, 1997. Where a portion of the Instructions to Bidders is modified or deleted by these Supplementary Instructions to Bidders, the unaltered portions of the Instructions to Bidders shall remain in effect. ARTICLE 1: DEFINITIONS Add to Paragraph 1.9 the following: Sub-bidders shall comply with the requirements of the Bid Documents. ARTICLE 3: BIDDING DOCUMENTS 3.1 COPIES Delete Subparagraph 3.1.1 in its entirety Add the following: 3.1.1 Bidders may obtain complete sets of Bidding Documents from the issuing office listed in the Advertisement or Invitation to Bid for the purchase price stated therein. Delete Subparagraph 3.1.2 in it entirety. Add the following: 3.1.2 Bidders for all trades may directly purchase drawing sets from the issuing office. 3.2 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS Add to Subparagraph 3.2.1 the following: Any conflict existing between the Drawings and Specifications or drawings of different scale or trade and not brought to the attention of the Architect for clarification and resolved by Addenda before Bids are submitted, shall be resolved on the basis of furnishing the greatest quantity and/or the highest quality indicated. No change order for such a conflict will be considered. In submitting a Bid the Contractor agrees to and accepts the requirements of this stipulation. 3.3 SUBSTITUTIONS Add Subparagraph 3.3.5 as follows: 3.3.5 Approval by the Architect of any such substitutions shall not relieve the Contractor requesting the substitution, of any responsibility for additional costs incurred by other trades for changes made necessary to accommodate the substituted item.

Page 6: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00005 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

PAGE 2 OF 2

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

ARTICLE 4: BIDDING PROCEDURES 4.2 BID SECURITY Delete this section in its entirety. 4.3 SUBMISSION OF BIDS 4.3.1 Add the following sentence to the end of the paragraph: “The Bidder shall supply two copies of all required material with his bid.” ARTICLE 7: PERFORMANCE BOND AND PAYMENT BOND 7.1 BOND REQUIREMENTS Delete Subparagraph 7.1.1 and substitute the following: 7.1.1 Prior to signing the Contract, the Owner shall require the successful bidder to secure and post a Labor and Materials Payment Bond and a Performance Bond, each in the amount of 100% of the Contract Sum, and each on the form provided in the Project Manual. Such bonds shall be issued by Surety licensed within the State of Connecticut and acceptable to the Owner. Costs of such bonds will be included in the agreed Contract Sum. 7.1.2 The furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid.

END OF SECTION 00005

Page 7: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00006 BID FORM

PAGE 1 OF 3

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

BID FORM GENERAL CONTRACTOR

(To Be On Bidder's Letterhead)

Ted Gaffney, Facilities Manager Date: The Florence Griswold Museum 96 Lyme Street Old Lyme, Connecticut 06371 Dear Mr. Gaffney: We wish to submit our bid for the new Landscape Center / Barn Renovations at the Florence Griswold Museum. We will be able to provide a Performance, Labor and Material Payment Bond and a Certificate of Insurance from the following insurance company: _____________________________________________________________________________________. We have read the General Conditions and Instructions to Bidders along with the Supplementary Instruction to Bidders and are submitting our bid in full compliance. The undersigned having carefully examined the Contract Documents dated September 3, 2008 together with all Addenda issued and received prior to scheduled closing time for receipt of Bids as prepared by Bianco Giolitto Weston Architects LLC, 500 Plaza Middlesex, Middletown, CT 06457, hereby offers and agrees to the following: To provide all materials, all labor, and all else whatsoever necessary to erect and properly finish all work in accordance with the Contract Documents of above named project as follows: (words)

(figures) ( ) This Bid amount includes all taxes, permits, insurances, bonds, fees, overhead and profit to the Contractor and shall be the final and all-inclusive cost to the owner. Furthermore, we represent that we have thoroughly reviewed the Project Scope and propose to complete the work in the following number of calendar days: ADDENDUM RECEIPT: The receipt of the following Addenda to Drawings and Specification is hereby acknowledged:

Page 8: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00006 BID FORM

PAGE 2 OF 3

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

ADDENDUM NO. Dated ADDENDUM NO. Dated In submitting this bid, I agree as follows: 1. To hold open my bid for 90 days after bid opening. 2. To enter into and execute a contract, if awarded on the basis of this bid, according to the contract form

listed in the Project Manual. 3. To deliver properly executed Performance/Labor and Material Payment Bonds as described in the

Instructions at the time of execution of the contract. The amount of the premiums for the subject bonds is included in the lump sum price above.

4. To accomplish the work in accordance with the contract documents. By submission of this bid, our company and each person signing on behalf of our company certifies, and in case of a joint bid, each party thereto certifies, as to its own organization, under penalty of perjury, that to the best of its knowledge and belief: 1. The prices in this bid have been arrived at independently without collusion, consultation,

communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor.

2. Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by us and will not knowingly be disclosed by us prior to opening, directly or indirectly, to any other Bidder or to any competitor.

3. No attempt has been made or will be made by us to induce any other person, partnership, or corporation to submit or not submit a bid for the purpose of restricting competition.

____________________________________________________________________ (Firm Name) By_________________________________________________________________ (Signature and Title of Authorized Representative) _________________________________________________________________ (Business Address) _________________________________________________________________ (City and State) Date: ______________________________________ We are a (circle one): 1. Corporation, licensed in the State of _______________ 2. Partnership 3. Individual

Note:

Page 9: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00006 BID FORM

PAGE 3 OF 3

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

If the bidder is a corporation, affix corporate seal and give below the names of its President, Treasurer, and General Manager, if any; if a partnership, give full names and residential addresses of all partners; and if an individual, give residential address if different from business address. Also, if the bidder is a corporation, attach a statement of authorization to submit this proposal from the governing body of the corporation.

Page 10: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

NOTIFICATION TO BIDDERS FORM

The contract to be awarded is subject to contract compliance requirements mandated by Section 4114a of the Connecticut General Statutes; and, when the awarding agency is the state, Section 46a71(d) of the Connecticut General Statutes. There are Contract Compliance Regulations codified at Section 4-114a-1 et seq. of the Regulations of Connecticut State Agencies which establish a procedure for the awarding of all contracts covered by Sections 4-114a and 46a-71(d) of the Connecticut General Statutes.

According to Section 4-114a-3(9) of the Contract Compliance Regulations, every agency awarding a contract subject to the contract compliance requirements has an obligation to “aggressively solicit the participation of legitimate minority business enterprises as bidders, contractors, subcontractors and suppliers of materials.” “Minority business enterprise” is defined in Section 4-114a of the Connecticut General Statutes as a business wherein fifty-one percent or more of the capital stock, or assets belong to a person or persons: “(1) Who are active in the daily affairs of the enterprise; (2) who have the power to direct the management and policies of the enterprise; and (3) who are members of a minority, as such term is defined in subsection (a) of Section 32-9n.” “Minority” groups are defined in Section 32-9n of the Connecticut General Statutes as “(1) Black Americans ...... (2) Hispanic Americans...... (3) Women...... (4) Asian Pacific Americans and Pacific Islanders; or (5) American Indians ......” The above definitions apply to the contract compliance requirements by virtue of Section 4-114a-1 (10) of the Contract Compliance Regulations.

The awarding agency will consider the following factors when reviewing the bidder’s qualifications under the contract compliance requirements:

(a) the bidder’s success in implementing an affirmative action plan; (b) the bidder’s success in developing an apprenticeship program complying with Sections 46a-681 to

46a-68-17 of the Connecticut General Statutes, inclusive; (c) the bidder’s promise to develop and implement a successful affirmative action plan; the bidder’s

submission of EEO-1 data indicating that the composition of its work force is at or near parity when compared to the racial and sexual composition of the work force in the relevant labor market area; and the bidder’s promise to set aside a portion of the contract for legitimate minority business enterprises. See Section 4-114a-3(10) of the Contract Compliance Regulations.

INSTRUCTION

Bidder must sign acknowledgement below, detach along dotted line and return acknowledgement to Awarding Agency along with bid proposal. The undersigned acknowledges receiving and reading a copy of the “Notification to Bidders” form.

On behalf of ________________________________________________________________________________ (Signature, Title)

Page 11: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

-42-

Capital Improvement Grants - HRF FY09

STATE OF CONNECTICUT EMPLOYER REPORT OF COMPLIANCE STAFFING LABOR DEPARTMENT

Department _________________________________________________ Approved Pending Investigation

Compliance Officer _______________________________________ Disapproved Investigation Requested

Date ________________

This form should reflect the number of permanent employees on your payroll on date of submission.

Name of Contracting Firm _____________________________________________________________________

Type of Report ______________________________________________ Prime Contractor Subcontractor

EMPLOYEE INFORMATION

Total Employed:

White _____ African American _____ Spanish Surname ______ Other (specify) ___________________________

Does your firm have a collective bargaining agreement or other contract or understanding with a labor organization or

employment agency for the recruitment of labor? Yes* No*

* If yes, list the name and address of the agency or organization.

Name ______________________________________________________________________________________

Address/City/State/Zip ________________________________________________________________________

* If no, indicate the usual methods of recruitment.

Connecticut State Employment Service Private Employment Agency Newspaper Advertisement

Walk-In Other (specify) ________________________________________

SIGNATURE

The signer certifies that its practices and policies, including but not limited to matters concerning personnel, training, apprenticeship, membership, grievance and representation, and upgrading, do not discriminate on grounds of race, color, religious creed, age, sex, or national origin, or ancestry of any individual, and that the signer agrees it will affirmatively cooperate in the implementation of the policy and provisions of Executive order Number Three, and consent and agreement is made that recruitment, employment and the terms and conditions of employment under the contract shall be in accordance with the purpose and provisions of Executive Order Number Three.

Is firm in minority ownership? (51% of assets in control of minorities) Yes No

I certify that the above is correct to the best of my knowledge.

Employer ___________________________________________________________________________________

Business Name ___________________________________________________________ Date _______________

Signature ___________________________________________________________________________________

Title _______________________________________________________________________________________

COMMISSION ON HUMAN RIGHTS AND OPPORTUNITIES FORMS

Page 12: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00007 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION

PAGE 1 OF 1

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

INSERT A.I.A. DOCUMENT A 201 HERE

Page 13: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 1 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

The following supplements hereafter referred to as the "Supplementary Conditions" modify the "General Conditions of the Contract for Construction," AIA Document A201, 1997. Where a portion of the General Conditions is modified or deleted by these Supplementary Conditions, the unaltered portions of the General Conditions shall remain in effect. ARTICLE 1: GENERAL PROVISIONS 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS Add sub-paragraph 1.2.4 as follows: 1.2.4 “A portion of the Work referenced on one Drawing, Set of Drawings, Specification or Set of Specifications shall apply to that portion of the Work on all subsequent drawings and Specifications, unless noted to the contrary.” Add sub-paragraph 1.2.5 as follows: 1.2.4 In the case of an inconsistency between Drawings and Specifications or within the Documents, not

clarified by addendum, the better quality or greater quantity of Work shall be provided at the Contractor's expense without contention. No change orders will be accepted for items where a greater quantity or quality level is in conflict with other components of the construction document package. By signing the Contract for Construction the Contractor acknowledges and agrees to this provision.

ARTICLE 2: OWNER 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER. Delete Subparagraph 2.2.5 and substitute the following: 2.2.5 The Contractor shall procure and pay for drawings and specifications required for the execution of

the Work. Copies may be obtained as noted in the Invitation to Bid. ARTICLE 3: CONTRACTOR 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR Delete sub-paragraph 3.2.1 in its entirety and substitute the following: 3.2.1 The Contractor shall carefully study and compare the Contract Documents with each other and the

information furnished by the Owner pursuant to Subparagraph 2.2.2, and shall immediately report to the Architect and Owner errors, inconsistencies or omissions discovered. The Contractor shall not be liable to the Owner or Architect for damage resulting from errors, inconsistencies or omissions in the Contract Documents unless the Contractor recognized, or should have recognized, such error, inconsistency or omission and knowingly or negligently failed to report it to the Architect and Owner. If the Contractor performs any construction knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to the Architect and

Page 14: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 2 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

Owner the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction.

Delete sub-paragraph 3.2.2 in its entirety and substitute the following: 3.2.2 `The Contractor shall take field measurements and verify field conditions and shall carefully

compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors, inconsistencies, or omissions discovered shall immediately be reported to the Architect and Owner.

Delete 3.2.3 in its entirety and substitute the following: 3.2.3 The Contractor shall perform the Work in accordance with the Contract Documents and submittals

approved pursuant to Paragraph 3.12. 3.4 LABOR AND MATERIALS Add the following sub-paragraphs: 3.4.3.1 The use or possession of controlled substances such as alcohol or drugs shall not be permitted on the

project site. All personnel violating this requirement are subject to immediate and permanent removal from the project site.

3.4.3.2 There shall be no smoking on the property at any time. 3.4.4 The Contractor is encouraged to use local labor when feasible, but not at the expense of good

workmanship at the lowest cost. 3.4.5 The Contractor is encouraged to purchase articles or materials manufactured or produced in the

United States, but not at the expense of the highest quality at the lowest cost. 3.5 WARRANTY Add the following: 3.5.2 Claims made under Warranties/Guarantee shall reactivate the warranty period of one (1) year (unless

originally specified for longer period in which case the reactivated warranty period would equal the specified period of the said component or assembly) from the date of successfully completing repairs to those specific components or assemblies affected by repairs and or modifications required to correct problem.

3.5.3 The Warranty Period for his Project is one (1) year from the date of Substantial Completion, unless

extended warranties are specified in individual sections elsewhere in the Project Manual. 3.5.4 Extended warranties are noted in individual sections in the Specifications. Contractor shall review

each section and submit, in writing, a list of each of the extended warranties, certifying his acknowledgement of same. The list shall also include the name, address, phone number and contact person of the manufacturer and installer of each item.

Page 15: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 3 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES Amend sub-paragraph 3.12.2 as follows: 3.12.2 Add “Material Safety Data Sheets” after the word “brochures” on line 2. 3.15 CLEANING UP Amend sub-paragraph 3.15.1 as follows: 3.15.1 Add “on a daily basis” after the word “Contract” on line 2. Add sub-paragraph 3.15.3 as follows:

3.15.3 Burning of rubbish at the Project site or in the surrounding area is prohibited. The Contractor will provide for removal of rubbish on a weekly basis and shall broom clean the site daily at his own cost and expense.

ARTICLE 4: ADMINISTRATION OF THE CONTRACT 4.2 ARCHITECT’S ADMINISTRATION OF THE CONTRACT Delete paragraphs 4.2.5 through 4.2.7, and substitute the following: 4.2.5 Based on the Architect’s observations and evaluations of the Contractor’s Application for Payment,

the Architect will review and certify to the Owner the amounts due the Contractor. In all events, the Owner shall make the final decision on whether to make the payment, as certified by the Architect, to the Contractor in accordance with the Contractor’s Application for Payment.

4.2.6 The Owner and the Architect will have the authority to reject Work, which does not conform to the

Contract Documents. Whenever the Owner or the Architect considers it necessary or advisable for implementation of the intent of the Contract Documents, the Owner and Architect will have the authority to require additional testing or inspection of the Work in accordance with Subparagraphs 13.5.2 and 13.5.3, whether or not such work is fabricated, installed or completed. However, neither this authority of the Architect and Owner nor a decision made in good faith to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Owner or Architect to the Contractor, Subcontractors, material and equipment suppliers, their agents and employees, or any other persons performing portions of the Work. Responsibility for payment of additional inspection or testing shall be as follows: Owner shall be responsible for cost of initial inspections and testing. If the results of the initial inspections or testing are unsatisfactory, the Contractor shall be responsible for the cost of this and all subsequent inspections and testing.

4.2.7 The Architect will review or take other appropriate action upon the Contractor’s submittals such as

Shop Drawings, Product Data and Samples. The Architects action will be taken with such promptness as to cause no delay in the Work, while allowing sufficient time in the Architect’s judgment to permit adequate review. Review of such submittals is not conducted for the purpose of

Page 16: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 4 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or for performance of systems or equipment, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Architect’s review shall not relieve the Contractor of its obligations under Paragraphs 3.3, 3.5 and 3.12. The Architect’s review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the Architect or Owner, of any construction means, methods, techniques, sequences, or procedures. The Architect’s or Owners approval of a specific item shall not indicate approval of an assembly of which the item is a component.

Delete Paragraph 4.2.12 and substitute the following: 4.2.12 Interpretations and decisions of the Architect will be consistent with the intent of and reasonably

inferable from the Contract Documents and will be in writing and/or in the form of drawings. When making such interpretations and decisions the Architect will endeavor to secure faithful performance by both the Owner and the Contractor, will not show partiality to either and will not be liable for results of interpretations or decisions rendered in good faith.

ARTICLE 5: SUBCONTRACTORS 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE

WORK Delete sub-paragraph 5.2.1 and substitute the following: 5.2.1. Not later than thirty (30) days after the date of commencement, the Contractor shall furnish in

writing to the Owner through the Architect the names of persons or entities proposed as manufacturers or providers for each portion of the Work. The Owner, through the Architect, will respond in writing to the Contractor within thirty (30) days of receipt of the names of persons or entities proposed for each principal portion of the Work.

Add the following sub-paragraph 5.2.5: 5.2.5 The Contractor agrees to put into all subcontracts language acknowledging that the Owner may

unilaterally require MEDIATION of any dispute between the General Contractor and any subcontractors or vendors.

8.3 DELAYS AND EXTENSIONS OF TIME Amend sub-paragraph 8.3.1 as follows: 8.3.1 Delete the words “and arbitration” in line 5. Add the following sub-paragraph: 8.3.4 When and if the Contract Time has been extended as provided herein, such extension of time shall be

documented by a Change Order. If additional costs are due to the Contractor for administrative or other expenses, these will be noted in the Change Order. By accepting a Change Order for an

Page 17: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 5 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

extension of Contract Time, the Contractor waives all rights to future claims for additional compensation for the time extension.

Add the following sub-paragraph: 8.3.5 In planning the construction schedule within the agreed upon Contract Time, the Contractor shall

anticipate adverse weather conditions normal to the site of the Work for the season or seasons of the year involved. The Architect and Owner will consider time extensions only for weather delays attributable to other than normal weather conditions.

ARTICLE 9: PAYMENTS AND COMPLETION 9.2 SCHEDULE OF VALUES Delete 9.2.1 and substitute the following: 9.2.1 Before the Contract Documents are signed, the Contractor shall submit to the Architect and Owner a

cost breakdown of the job, scheduling costs of major divisions, further divided into major items of work within each division with separate lines for labor and materials, where appropriate, which shall total the Contract Sum. This breakdown will be used as the basis for determining progress payments, and must be approved by the Architect and the Owner. The breakdown shall be submitted using AIA Document G702, Application and Certification for Payment, supported by AIA Document G703, Continuation Sheet.

9.3 APPLICATIONS FOR PAYMENT Delete sub-paragraph 9.3.1 and substitute the following: 9.3.1 On the last day of each month the Contractor shall submit to the Architect 4 copies of an itemized

Application for Payment. The Application shall be a notarized AIA Document G702, Application and Certification for Payment and AIA Document G703, Continuation Sheet, supported by such data substantiating the Contractor’s right to payment as the Owner or Architect may require, such as copies of requisitions from Subcontractors and material suppliers, and reflecting retainage as required.

In order to expedite monthly payments during the course of the project, the Contractor shall review

with the Architect a preliminary draft of the aforementioned Application for Payment to ensure agreement with the Contractor before final copies of the Application are submitted. The Architect shall review the Contractor’s formal Application for Payment and certify in writing in accordance with Section 9.4, the total value of work done, including an allowance for the value of materials delivered and suitably stored at the site at the time of such estimate. The Owner shall retain five percent (5%) of such estimated value, said retainage to be held by the Owner as part security for the completion of the Work by the Contractor, and shall monthly pay the Contractor, while carrying on the Work, the balance not retained, after deducting all previous payments and all sums to be kept or retained under provisions of the Contract.

9.5 DECISIONS TO WITHHOLD CERTIFICATION

Page 18: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 6 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

Change paragraph 9.5.1.1 to read as follows: 9.5.1.1 “defective Work already paid for and not yet remedied.” 9.6 PROGRESS PAYMENTS Delete paragraph 9.6.1 and substitute the following: 9.6.1 After the Architect has issued a Certificate of Payment, The Owner shall review the Certificate of

Payment and decide within the time provided in the Contract Documents whether to make payment in accordance with the Certificate of Payment, and shall notify the Architect. In the event payment is approved by the Owner, Owner shall make payment as soon as practicable after making its decision.

Delete paragraph 9.6.2 and substitute the following: 9.6.2 The Contractor will pay each Subcontractor within 30 days after receipt of payment from the Owner,

out of the amount paid to the Contractor on account of such Subcontractor’s portion of the Work, the amount to which such Subcontractor is entitled. The Contractor, in accepting each payment warrants each Subcontractor will pay each Sub-subcontractor within 30 days after receipt of payment from the Contractor, out of the amount paid to the Subcontractor on account of such Sub-subcontractors portion of the Work, the amount to which each Sub-subcontractor is entitled. If requested by the Owner, the Contractor shall provide lien waivers submitted from each subcontractor for the previous pay period. Failure to submit lien waivers as requested will result in withholding of the payment or portion of payment equal to the value of the requested lien waivers.

Add paragraph 9.6.8 as follows: 9.6.8 No interest shall accrue or be paid by the Owner upon any sums retained under the provisions of this

agreement. Add paragraph 9.6.9 as follows: 9.6.9 The Owner shall have the right to deduct from any progress payment such amounts as the Owner

deems necessary to cover the cost of correcting defective work already paid for by the Owner. 9.7 FAILURE OF PAYMENT Amend paragraph 9.7.1 as follows: Delete the words “date” through “arbitration” on lines three and four and replace with “Owner’s

approval of payment to the Contractor.” 9.8 SUBSTANTIAL COMPLETION Add the following: 9.8.3.1 If repeat inspections are required, they shall be performed by the Architect at the expense of the

Contractor. Costs for repeat inspections will be deducted from the Contractor’s final payment.

Page 19: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 7 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

9.8.5 Delete the sentence beginning “Upon such acceptance ……….” And replace it with “The Owner

shall make payment of 95% of the total approved amount. The remaining 5% will be held until final payment unless otherwise authorized by the Owner in writing.”

9.10 FINAL COMPLETION AND FINAL PAYMENT Add the following at the end of paragraph 9.10.1:

“In all events the Owner shall make the final decision on whether to make payment to the Contractor in accordance with the final Certificate of Payment.”

Add the following: 9.10.1.1 If repeat inspections are required, they shall be performed by the Architect at the expense of the

Contractor. Costs for repeat inspections will be deducted from the Contractor’s final payment. ARTICLE 10: PROTECTION OF PERSONS AND PROPERTY

10.2 SAFETY OF PERSONS AND PROPERTY Add the following: 10.2.8 The Contractor shall protect all work and material from damage by water and by weather and shall

be responsible for adequate strength and safety of all scaffolding, staging and hoisting equipment and for temporary shoring, bracing and tying

10.2.9 The Contractor shall furnish hard hats other protective equipment as required, approved first aid

supplies, name of first aid attendant and a posted list of emergency facilities as necessary to provide for a safe work environment.

10.2.10 The Contractor shall take immediate action to correct any hazardous conditions reported. 10.2.11 No unauthorized visitors shall be allowed on the work site without permission from the Owner’s

representative or Architect. 10.2.12 The Contractor shall comply with the requirements of the Occupational Health and Safety Act and

the Construction Safety Act of 1970 including all standards and regulations which have been promulgated by the governmental agencies which administer such acts; and said requirements, standards and regulations are incorporated herein by reference. The Contractor shall be directly responsible for compliance therewith on the part of its agents, employees, materialmen, and Subcontractors, to so comply.

The Contractor shall defend, indemnify and hold harmless the Owner and the Architect and their officers, agents, servants, and employees from and against any and all suits, claims, damages, losses, litigation costs and expenses, including fines and reasonable attorney’s fees incurred by the Town and the Architect by reason of the real or alleged violation of such laws, ordinances, regulations, and

Page 20: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 8 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

directives, Federal, State and Local, which are currently in effect or which become effective in the future, by the Contractor, its Sub-contractors or Materialmen.

10.2.13 The Contractor shall hold weekly safety meetings to include all active subcontractors and the

Owner's representative. Delete Section 10.3.3 in its entirety: ARTICLE 11: INSURANCE AND BONDS 11.1 CONTRACTOR'S LIABILITY INSURANCE Delete sub-paragraph 11.1.1 and substitute the following: The Contractor agrees to carry as a minimum the following insurance in such form and with such carriers as are satisfactory to the Owner and will furnish the Owner with a copy of the policy and complying with the laws of Connecticut. The insurance policies required by Paragraph 11.1 shall apply to all written and oral Contracts. Certificates of Insurance are required before an exposure to loss can occur. Include in all policies as additional Named Insured, the Owner, Owner Project Representatives, Architect, Consultants and Agent's and employees of any of them. The Contractor shall supply coverage to include asbestos removal. Coverage shall be on an occurrence basis.. Statutory Workmen's Compensation Insurance: $500,000/$500,000/$500,000 Coverage is to be extended for USL&H benefits and include coverage for the Jones Act, where the Project involves work adjacent to or on the water. Commercial General Liability Insurance: A policy covering all work to be performed and all obligations assumed under this contract is to be issued. Products-Completed Operations, Independent Contractors, and Contractual Liability are included. All XCU exclusions are to be deleted. If the project is on or near water, deletion of the watercraft exclusions will be required. Products and Completed Operations Insurance shall be maintained for a minimum period of two (2) years after final payment and Contractor shall continue to provide evidence of such coverage to Owner on an annual basis during the aforementioned period. Limits shall not be less than $1,000,000 per occurrence and $2,000,000 in the aggregate. Owner's Protective Liability Insurance: A Liability Policy shall be purchased by and is the responsibility of the Contractor. Such policies shall be in the Name of the Owner, Owner Project Representatives, Architect, Architect Consultants and Agents and Employees of any of them. The Contractor shall provide this insurance in the name of the:

Page 21: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 9 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

Florence Griswold Museum, Architect, Architect’s Consultants and Agents and Employees of any of them including Personal Injury per CG 28 05 at the following limits. $ 1,000,000 Each Occurrence $ 2,000,000 Aggregate Automobile Liability: A policy issued to and covering the liability of the Contractor arising out of the use of owned, hired and non-owned vehicles which are required by law to be licensed for road use shall be provided. Limits of Liability: $1,000,000 per occurrence. “Claims Made” Insurance: If any insurance as specified herein is provided on “claims made” basis, then in addition to the foregoing requirements, the policies shall provide that:

1. Retroactive date must coincide with or precede the start of work. 2. If coverage is terminated for any reason, Contractor agrees to purchase an Extended

Reporting Period allowing claims to be reported for an additional two years from the date of cancellation.

3. Policy must have claim reporting verbiage which allows for reporting of circumstances

which might give rise to a claim. 4. Contractor will maintain insurance for at least two years following final payment.

Contractor shall furnish certificates to he Architect for all of the above 10 days prior to the start of any work. 11.3 PROJECT MANAGEMENT PROTECTIVE LIABILITY INSURANCE Delete Paragraph 11.3 in its entirety.

ARTICLE 13: MISCELLANEOUS PROVISIONS 13.5 TESTS AND INSPECTIONS Add the following Paragraph: 13.5.7 The Contractor shall notify all Town Review Agencies including the Building Official and Fire

Marshall 24 hours in advance of the test. Add Paragraph 13.8 as follows:

Page 22: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00010 SUPPLEMENTARY GENERAL CONDITIONS

PAGE 10 OF 10

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

13.8 EQUAL OPPORTUNITY 13.8.1 Equal Opportunity: The Contractor and all Subcontractors shall comply to Title VI of the Civil

Rights Act of 1964 and the provisions of the Code of Federal Regulations, Title 43, Part 17 as amended. The Contractor or any Subcontractor shall not discriminate against any employee or applicant for employment because of race, creed, color national origin. The Contractor will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color or national origin. Such actions shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this non-discrimination clause. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants shall receive consideration for employment without regard to race, creed, color or national origin. In the event of the Contractor's non-compliance with the non-discrimination clause of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated or suspended. The Contractor will provide, if required, the attached Affirmative Action Statement.

All work performed by the Contractor shall fully comply with the provisions of the Federal

Occupational Safety and Health Act and any rules and regulations enacted pursuant thereto. ARTICLE 14: TERMINATION OR SUSPENSION OF CONTRACT 14.4 TERMINATION BY THE OWNER FOR CONVENIENCE Modify 14.4.3 as follows: Delete remainder of sentence after "…….pay for Work executed……."

END OF SECTION 00008

Page 23: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 00011 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR

PAGE 1 OF 1

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

INSERT A.I.A. DOCUMENT A 101 HERE

Page 24: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01100 SUMMARY OF WORK

PAGE 1 OF 1

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: Project consists of renovations and alterations to the existing historic barn for use as a new landscape center. 1. Project Location and Owner: Florence Griswold Museum, Old Lyme, CT.

B. Architect Identification: The Contract Documents were prepared for the Project by Bianco Giolitto Weston Architects LLC, Middletown, Connecticut.

C. Owner’s Representative: Ted Gaffney, Facilities Manager

D. The Work consists of renovations and alterations to the existing structure including in general but not limited to: site work, controlled demolition, concrete, rough and finish carpentry, roofing and siding, window and door repair, millwork, plumbing and electrical work.

1.3 CONTRACT

A. The project will be constructed under a General Contractor contract.

1.4 WORK SEQUENCE

A. The Work shall be conducted in phases as noted.

1.5 USE OF PREMISES

A. General: Project area will be occupied during the construction period. See Phasing Schedule and coordinate with Owner as required by Section 01140 Work Restrictions.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01100

Page 25: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01140 WORK RESTRICTIONS

PAGE 1 OF 1

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 USE OF PREMISES

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. 1. Driveways and Entrances: Keep driveways and entrances serving premises clear and

available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

B. Contractor Parking and Staging: The site has limited access, storage and parking availability. The Owner will assist the Contractor with locations available on the property for parking of vehicles and staging of construction equipment and materials.

1.3 ENVIRONMENTAL REQUIREMENTS

A. The site is a museum open to the general public and includes groups of school age children. Workers on-site shall maintain appropriate attire (short sleeve shirts), language and displays.

B. There is no smoking allowed on the site.

1.4 OCCUPANCY REQUIREMENTS

A. Full Owner Occupancy: Owner will occupy site and existing building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01140

Page 26: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01250 CONTRACT MODIFICATION PROCEDURES

PAGE 1 OF 2

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for handling and processing Contract modifications.

1.3 MINOR CHANGES IN THE WORK

A. Architect will issue supplemental instructions authorizing Minor Changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's Supplemental Instructions."

1.4 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Proposal Requests issued by Architect are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change.

2. Within 10 Calendar days after receipt of Proposal Request, submit a quotation stating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

B. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract, Contractor may propose changes by submitting a request for a change to the Architect.

Page 27: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01250 CONTRACT MODIFICATION PROCEDURES

PAGE 2 OF 2

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

5. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified.

1.5 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714 . Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01250

Page 28: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01290 PAYMENT PROCEDURES

PAGE 1 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.3 DEFINITIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.

1.4 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule.

1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following:

a. Application for Payment forms with Continuation Sheets. b. Submittals Schedule.

2. Submit the Schedule of Values to Architect at earliest possible date but no later than seven days before the date scheduled for submittal of initial Application for Payment.

B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the Schedule of Values:

a. Project name and location. b. Name of Architect. c. Architect's project number. d. Contractor's name and address. e. Date of submittal.

2. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed:

Page 29: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01290 PAYMENT PROCEDURES

PAGE 2 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

a. Related Specification Section or Division. b. Description of the Work. c. Change Orders (numbers) that affect value. d. Dollar value.

1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.

3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate.

4. Round amounts to nearest whole dollar; total shall equal the Contract Sum. 5. Provide a separate line item in the Schedule of Values for each part of the Work where

Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

a. Differentiate between items stored on-site and items stored off-site. Include evidence of insurance or bonded warehousing if required.

6. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.

7. Each item in the Schedule of Values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.

8. Schedule Updating: Update and resubmit the Schedule of Values before the next Application for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.

1.5 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner.

1. The first Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements.

B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement.

C. Payment Application Forms: Use AIA Document G702 and AIA Document G703 Continuation

Sheets as form for Applications for Payment.

Page 30: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01290 PAYMENT PROCEDURES

PAGE 3 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action.

1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made.

2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

E. Transmittal: Submit 3 signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

F. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's liens from subcontractors, sub-subcontractors, and suppliers for construction period covered by the previous application.

1. Submit partial waivers on each item for amount requested, before deduction for retainage, on each item.

2. When an application shows completion of an item, submit final or full waivers, less retainage held, if any.

3. Owner reserves the right to designate which entities involved in the Work must submit waivers.

4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner.

G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors. 2. Schedule of Values. 3. Contractor's Construction Schedule (preliminary if not final). 4. Schedule of unit prices. 5. Submittals Schedule (preliminary if not final). 6. List of Contractor's staff assignments. 7. Copies of building permits. 8. Copies of authorizations and licenses from authorities having jurisdiction for

performance of the Work. 9. Report of preconstruction conference. 10. Certificates of insurance and insurance policies. 11. Performance and payment bonds. 12. Data needed to acquire Owner's insurance. 13. Initial settlement survey and damage report if required.

Page 31: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01290 PAYMENT PROCEDURES

PAGE 4 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

H. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work.

I. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements. 2. Insurance certificates for products and completed operations where required and proof

that taxes, fees, and similar obligations were paid. 3. Updated final statement, accounting for final changes to the Contract Sum. 4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims." 5. AIA Document G706A, "Contractor's Affidavit of Release of Liens." 6. AIA Document G707, "Consent of Surety to Final Payment." 7. Evidence that claims have been settled. 8. Final, liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01290

Page 32: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01310 PROJECT MANAGEMENT AND COORDINATION

PAGE 1 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. General project coordination procedures. 2. Conservation. 3. Coordination Drawings. 4. Administrative and supervisory personnel. 5. Project meetings.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility will be assigned to a specific contractor.

1.3 COORDINATION

A. Coordination: Coordinate construction operations included in various Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

B. Coordination: Each contractor shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its operations with operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

C. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

Page 33: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01310 PROJECT MANAGEMENT AND COORDINATION

PAGE 2 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

D. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule. 2. Preparation of the Schedule of Values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. 7. Project closeout activities.

E. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.

1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work.

1.4 PRECONSTRUCTION CONFERENCE

A. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments.

1. Attendees: Authorized representatives of Owner, Architect, and their consultants; Contractor and its superintendent; major subcontractors; manufacturers; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule. b. Phasing. c. Critical work sequencing. d. Designation of responsible personnel. e. Procedures for processing field decisions and Change Orders. f. Procedures for processing Applications for Payment. g. Distribution of the Contract Documents. h. Submittal procedures. i. Preparation of Record Documents. j. Use of the premises. k. Responsibility for temporary facilities and controls. l. Parking availability. m. Office, work, and storage areas. n. Equipment deliveries and priorities. o. First aid.

Page 34: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01310 PROJECT MANAGEMENT AND COORDINATION

PAGE 3 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

p. Security. q. Progress cleaning. r. Working hours.

B. Progress Meetings: Architect will conduct progress meetings at appropriate intervals.

1. Attendees: Owner, Architect, General Contractor. Representatives of other subcontractors, suppliers or other entities concerned with current progress or involved in planning, coordination, or performance of future activities shall attend when required by the Architect. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Architect will review and correct or approve minutes of previous progress meeting and review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Contractor shall review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

b. Contractor shall review present and future needs of each entity present, including the following:

1) Interface requirements. 2) Sequence of operations. 3) Status of submittals. 4) Deliveries. 5) Off-site fabrication. 6) Access. 7) Site utilization. 8) Temporary facilities and controls. 9) Work hours. 10) Hazards and risks. 11) Progress cleaning. 12) Quality and work standards. 13) Change Orders. 14) Documentation of information for payment requests.

c. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

C. Coordination Meetings: Conduct Project coordination meetings at appropriate intervals. Project coordination meetings are in addition to specific meetings held for other purposes, such as progress meetings and preinstallation conferences.

PART 2 - PRODUCTS (Not Used)

Page 35: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01310 PROJECT MANAGEMENT AND COORDINATION

PAGE 4 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 3 - EXECUTION (Not Used)

END OF SECTION 01310

Page 36: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 1 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

B. Informational Submittals: Written information that does not require Architect's approval. Submittals may be rejected for not complying with requirements.

1.4 SUBMITTAL PROCEDURES

A. General: Electronic copies of the Contract Drawings will be provided by Architect and his consultants for Contractor's use in preparing submittals, upon the execution of a Waiver Agreement by the Contractor and the Architect's receipt of $75 per drawing.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities.

D. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal.

Page 37: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 2 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Concurrent Review: Where concurrent review of submittals by Architect's consultants, Owner, or other parties is required, allow 21 days for initial review of each submittal.

3. Direct Transmittal to Consultant: Where the Contract Documents indicate that submittals may be transmitted directly to Architect's consultants, provide duplicate copy of transmittal to Architect. Submittal will be returned to Architect before being returned to Contractor.

4. If intermediate submittal is necessary, process it in same manner as initial submittal. 5. Allow 15 days for processing each resubmittal. 6. No extension of the Contract Time will be authorized because of failure to transmit

submittals enough in advance of the Work to permit processing.

E. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 4 by 5 inches on label or beside title block to record

Contractor's review and approval markings and for space for Architect's review stamp. 3. Include the following information on label for processing and recording action taken:

a. Project name. b. Date. c. Name and address of Architect . d. Name and address of Contractor. e. Name and address of subcontractor. f. Name and address of supplier. g. Name of manufacturer. h. Unique identifier, including revision number. i. Number and title of appropriate Specification Section. j. Drawing number and detail references, as appropriate. k. Other necessary identification.

F. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

G. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

1. Submit one copy of submittal to concurrent reviewer in addition to specified number of copies to Architect

2. Additional copies submitted for maintenance manuals will be marked with action taken and will be returned.

H. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Architect will discard submittals received from sources other than Contractor.

Page 38: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 3 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Architect on previous submittals, and deviations from requirements of the Contract Documents, including minor variations and limitations. Include the same label information as the related submittal.

2. Include Contractor's certification stating that information submitted complies with requirements of the Contract Documents.

3. Transmittal Form: Provide locations on form for the following information:

a. Project name. b. Date. c. Destination (To:). d. Source (From:). e. Names of subcontractor, manufacturer, and supplier. f. Category and type of submittal. g. Submittal purpose and description. h. Submittal and transmittal distribution record. i. Remarks. j. Signature of transmitter.

I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

J. Use for Construction: Use only final submittals with mark indicating action taken by Architect in connection with construction.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections. 1. Number of Copies: Submit copies of each submittal, as follows, unless otherwise

indicated:

a. Initial Submittal: Submit a preliminary single copy of each submittal where selection of options, color, pattern, texture, or similar characteristics is required. Architect will return submittal with options selected.

b. Final Submittal: Submit six copies. Architect will retain two copies; remainder will be returned. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

Page 39: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 4 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable:

a. Manufacturer's written recommendations. b. Manufacturer's product specifications. c. Manufacturer's installation instructions. d. Standard color charts. e. Manufacturer's catalog cuts. f. Wiring diagrams showing factory-installed wiring. g. Printed performance curves. h. Operational range diagrams. i. Mill reports. j. Standard product operating and maintenance manuals. k. Compliance with recognized trade association standards. l. Compliance with recognized testing agency standards. m. Application of testing agency labels and seals. n. Notation of coordination requirements.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Include the following information, as applicable:

a. Dimensions. b. Identification of products. c. Fabrication and installation drawings. d. Roughing-in and setting diagrams. e. Wiring diagrams showing field-installed wiring, including power, signal, and

control wiring. f. Shopwork manufacturing instructions. g. Templates and patterns. h. Schedules. i. Design calculations. j. Compliance with specified standards. k. Notation of coordination requirements. l. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

3. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 40 inches.

4. Number of Copies: Submit copies of each submittal, as follows:

a. Initial Submittal: Submit one correctable, translucent, reproducible print and one black-line print. Architect will return the reproducible print.

b. Final Submittal: Submit three black-line prints, unless prints are required for operation and maintenance manuals. Submit five prints where prints are required for operation and maintenance manuals. Architect will retain two prints; remainder will be returned.

Page 40: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 5 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

D. Coordination Drawings: Comply with requirements in Division 1 Section "Project Management and Coordination."

E. Samples: Prepare physical units of materials or products, including the following:

1. Comply with requirements in Division 1 Section "Quality Requirements" for mockups. 2. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or

sections of units showing the full range of colors, textures, and patterns available. 3. Samples for Verification: Submit full-size units or Samples of size indicated, prepared

from the same material to be used for the Work, cured and finished in manner specified, and physically identical with the product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

4. Preparation: Mount, display, or package Samples in manner specified to facilitate review of qualities indicated. Prepare Samples to match Architect's sample where so indicated. Attach label on unexposed side that includes the following: a. Generic description of Sample. b. Product name or name of manufacturer. c. Sample source.

5. Additional Information: On an attached separate sheet, prepared on Contractor's letterhead, provide the following: a. Size limitations. b. Compliance with recognized standards. c. Availability. d. Delivery time.

6. Submit Samples for review of kind, color, pattern, and texture for a final check of these characteristics with other elements and for a comparison of these characteristics between final submittal and actual component as delivered and installed. a. If variation in color, pattern, texture, or other characteristic is inherent in the

product represented by a Sample, submit at least three sets of paired units that show approximate limits of the variations.

b. Refer to individual Specification Sections for requirements for Samples that illustrate workmanship, fabrication techniques, details of assembly, connections, operation, and similar construction characteristics.

7. Number of Samples for Initial Selection: Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect will return submittal with options selected.

8. Number of Samples for Verification: Submit three sets of Samples. Architect will retain two Sample sets; remainder will be returned. a. Submit a single Sample where assembly details, workmanship, fabrication

techniques, connections, operation, and other similar characteristics are to be demonstrated.

9. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

Page 41: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 6 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

a. Samples that may be incorporated into the Work are indicated in individual Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

2.2 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. Architect will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Division 1 Section "Quality Requirements."

B. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

C. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements.

D. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified.

E. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements and, where required, is authorized for this specific Project.

F. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements. Include evidence of manufacturing experience where required.

G. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements.

H. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

I. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements.

Page 42: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 7 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

J. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

K. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

L. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

M. Research/Evaluation Reports: Prepare written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information:

1. Name of evaluation organization. 2. Date of evaluation. 3. Time period when report is in effect. 4. Product and manufacturers' names. 5. Description of product. 6. Test procedures and results. 7. Limitations of use.

N. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements in Division 1 Section "Closeout Procedures”.

O. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers.

P. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer. Include the following, as applicable:

1. Preparation of substrates. 2. Required substrate tolerances. 3. Sequence of installation or erection. 4. Required installation tolerances. 5. Required adjustments. 6. Recommendations for cleaning and protection.

Page 43: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 8 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

Q. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's tests and inspections. Include the following, as applicable:

1. Name, address, and telephone number of factory-authorized service representative making report.

2. Statement on condition of substrates and their acceptability for installation of product. 3. Statement that products at Project site comply with requirements. 4. Summary of installation procedures being followed, whether they comply with

requirements and, if not, what corrective action was taken. 5. Results of operational and other tests and a statement of whether observed performance

complies with requirements. 6. Statement whether conditions, products, and installation will affect warranty. 7. Other required items indicated in individual Specification Sections.

R. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage.

S. Material Safety Data Sheets: Submit information directly to Owner. If submitted to Architect, Architect will not review this information but will return it with no action taken.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

3.2 ARCHITECT'S ACTION

A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows:

1. No Exceptions Taken No resubmittal necessary

2. Correct as Noted No resubmittal necessary

3. Revise and Resubmit Resubmittal required

Page 44: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01330 SUBMITTAL PROCEDURES

PAGE 9 OF 9

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

4. Rejected Resubmittal required

C. Informational Submittals: Architect will review each submittal and will not return it, or will reject and return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

END OF SECTION 01330

Page 45: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01400 QUALITY REQUIREMENTS

PAGE 1 OF 3

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specific quality-control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's quality-control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality-control services required by Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section.

1.3 QUALITY CONTROL

A. Contractor Responsibilities: Unless otherwise indicated, provide quality-control services specified and required by authorities having jurisdiction.

1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.

a. Contractor shall not employ the same entity engaged by Owner, unless agreed to in writing by Owner.

2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.

3. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

4. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

5. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

Page 46: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01400 QUALITY REQUIREMENTS

PAGE 2 OF 3

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Retesting/Re-inspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and re-inspecting, for construction that revised or replaced Work that failed to comply with requirements established by the Contract Documents.

C. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

3. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

4. Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work.

5. Do not perform any duties of Contractor.

D. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work. 2. Incidental labor and facilities necessary to facilitate tests and inspections. 3. Adequate quantities of representative samples of materials that require testing and

inspecting. Assist agency in obtaining samples. 4. Facilities for storage and field-curing of test samples. 5. Delivery of samples to testing agencies. 6. Preliminary design mix proposed for use for material mixes that require control by testing

agency. 7. Security and protection for samples and for testing and inspecting equipment at Project

site.

E. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

F. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality-control services required by the Contract Documents. Submit schedule within 30 days of date established for the Notice to Proceed.

1. Distribution: Distribute schedule to Owner, Architect, [,] testing agencies, and each party involved in performance of portions of the Work where tests and inspections are required.

PART 2 - PRODUCTS (Not Used)

Page 47: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01400 QUALITY REQUIREMENTS

PAGE 3 OF 3

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 3 - EXECUTION

3.1 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Sections of these Specifications. Restore patched areas and extend restoration into adjoining areas in a manner that eliminates evidence of patching.

2. Comply with the Contract Document requirements for Division 1 Section "Cutting and Patching."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 01400

Page 48: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01500 TEMPORARY FACILITIES AND CONTROLS

PAGE 1 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes requirements for temporary facilities and controls, including temporary utilities, support facilities, and security and protection facilities.

B. Temporary utilities include, but are not limited to, the following: 1. Sanitary facilities, including toilets, wash facilities, and drinking-water facilities. 2. Electric power service. 3. Lighting. 4. Telephone service.

C. Support facilities include, but are not limited to, the following: 1. Project identification and temporary signs. 2. Waste disposal facilities. 3. Field offices. 4. Storage and fabrication sheds. 5. Lifts and hoists. 6. Construction aids and miscellaneous services and facilities.

D. Security and protection facilities include, but are not limited to, the following:

1. Environmental protection. 2. Stormwater control. 3. Tree and plant protection. 4. Pest control. 5. Barricades, warning signs, and lights. 6. Temporary enclosures. 7. Fire protection.

1.3 USE CHARGES

A. Water Service: Use water from Owner's existing water system without metering and without payment of use charges.

B. Electric Power Service: Use power extended from Owner's existing electrical system without metering and without payment of use charges.

Page 49: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01500 TEMPORARY FACILITIES AND CONTROLS

PAGE 2 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1.4 QUALITY ASSURANCE

A. Standards: Comply with ANSI A10.6, NECA's "Temporary Electrical Facilities," and NFPA 241.

1. Trade Jurisdictions: Assigned responsibilities for installation and operation of temporary utilities are not intended to interfere with trade regulations and union jurisdictions.

2. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Provide new materials. Undamaged, previously used materials in serviceable condition may be used if approved by Architect. Provide materials suitable for use intended.

B. Lumber and Plywood: Comply with requirements in Division 6 Section "Rough Carpentry”.

C. Tarpaulins: Fire-resistive labeled with flame-spread rating of 15 or less.

D. Water: Potable.

2.2 EQUIPMENT

A. General: Provide equipment suitable for use intended.

1. Field Office: Provide desk, chairs and filing cabinet for use within barn.

B. Fire Extinguishers: Hand carried, portable, UL rated. Provide class and extinguishing agent as indicated or a combination of extinguishers of NFPA-recommended classes for exposures.

1. Comply with NFPA 10 and NFPA 241 for classification, extinguishing agent, and size required by location and class of fire exposure.

C. Self-Contained Toilet Units: Single-occupant units of chemical, aerated recirculation, or combustion type; vented; fully enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material.

D. Drinking-Water Fixtures: Bottled-water drinking-water units, including paper cup supply.

Page 50: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01500 TEMPORARY FACILITIES AND CONTROLS

PAGE 3 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

E. Electrical Outlets: Properly configured, NEMA-polarized outlets to prevent insertion of 110- to 120-V plugs into higher-voltage outlets; equipped with ground-fault circuit interrupters, reset button, and pilot light.

F. Telephone Service: provide cell phone number access for project superintendent.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required.

B. Provide each facility ready for use when needed to avoid delay. Maintain and modify as required. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Engage appropriate local utility company to install temporary service or connect to existing service. Where utility company provides only part of the service, provide the remainder with matching, compatible materials and equipment. Comply with utility company recommendations.

1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

2. Provide adequate capacity at each stage of construction. Before temporary utility is available, provide trucked-in services.

B. Water Service: Use of Owner's existing water service facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.

1. Provide rubber hoses as necessary to serve Project site.

C. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking-water fixtures. Comply with regulations and health codes for type, number, location, operation, and maintenance of fixtures and facilities.

1. Disposable Supplies: Provide toilet tissue, paper towels, paper cups, and similar disposable materials for each facility. Maintain adequate supply. Provide covered waste containers for disposal of used material.

2. Toilets: Install self-contained toilet units. Shield toilets to ensure privacy. Provide separate facilities for male and female personnel.

3. Drinking-Water Facilities: Provide bottled-water, drinking-water units.

Page 51: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01500 TEMPORARY FACILITIES AND CONTROLS

PAGE 4 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

D. Electric Power Service: Provide weatherproof, grounded electric power service and distribution system of sufficient size, capacity, and power characteristics during construction period. Include meters, transformers, overload-protected disconnecting means, automatic ground-fault interrupters, and main distribution switchgear. 1. Install power distribution wiring overhead and rise vertically where least exposed to

damage. 2. Connect temporary service to Owner's existing power source, as directed by electric

company officials.

E. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations and traffic conditions.

1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.

2. Provide one 100-W incandescent lamp per 500 sq. ft. (45 sq. m), uniformly distributed, for general lighting, or equivalent illumination.

F. Telephone Service: Provide temporary telephone service throughout construction period for common-use facilities used by all personnel engaged in construction activities. Use of cell phones is permitted providing that cell phone is available during all working hours for communication.

3.3 SUPPORT FACILITIES INSTALLATION

A. General: Comply with the following: 1. Maintain support facilities until near Substantial Completion. Remove before Substantial

Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to Owner.

B. Dewatering Facilities and Drains: Comply with requirements in applicable Division 2 Sections for temporary drainage and dewatering facilities and operations not directly associated with construction activities included in individual Sections. Where feasible, use same facilities. Maintain Project site, excavations, and construction free of water.

1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining property nor endanger permanent Work or temporary facilities.

2. Before connection and operation of permanent drainage piping system, provide temporary drainage where roofing or similar waterproof deck construction is completed.

3. Remove snow and ice as required to minimize accumulations.

C. Temporary Signs: Install signs where required to inform public and persons seeking entrance to Project. Do not permit installation of unauthorized signs. 1. Provide 3’-0” x 5’-0”project sign per artwork supplied by Owner. 2. Construct signs of exterior-type Grade B-B high-density concrete form overlay plywood

in sizes and thicknesses indicated. Support on posts or framing of preservative-treated wood or steel.

Page 52: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01500 TEMPORARY FACILITIES AND CONTROLS

PAGE 5 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

3. Paint sign panel and applied graphics with exterior-grade alkyd gloss enamel over exterior primer.

D. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Comply with Division 1 Section "Execution Requirements" for progress cleaning requirements.

1. Provied separate containers, clearly labeled, for each type of waste material to be deposited.

2. Develop a waste management plan for Work performed on Project. Indicate types of waste materials Project will produce and estimate quantities of each type. Provide detailed information for on-site waste storage and separation of recyclable materials. Provide information on destination of each type of waste material and means to be used to dispose of all waste materials.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Avoid using tools and equipment that produce harmful noise. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site.

B. Stormwater Control: Provide earthen embankments and similar barriers in and around excavations and subgrade construction, sufficient to prevent flooding by runoff of stormwater from heavy rains.

C. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from construction damage. Protect tree root systems from damage, flooding, and erosion.

D. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights.

E. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. 1. Vertical Openings: Close openings of 25 sq. ft. or less with plywood or similar materials. 2. Horizontal Openings: Close openings in floor or roof decks and horizontal surfaces with

load-bearing, wood-framed construction. 3. Install tarpaulins securely using fire-retardant-treated wood framing and other materials. 4. Where temporary wood or plywood enclosure exceeds 100 sq. ft. in area, use fire-

retardant-treated material for framing and main sheathing.

Page 53: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01500 TEMPORARY FACILITIES AND CONTROLS

PAGE 6 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

F. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA 241.

1. Store combustible materials in containers in fire-safe locations. 2. Maintain unobstructed access to fire extinguishers, fire hydrants, temporary fire-

protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Maintenance: Maintain facilities in good operating condition until removal. Protect from damage caused by freezing temperatures and similar elements.

B. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired. 1. At Substantial Completion, clean and renovate permanent facilities used during

construction period. Comply with final cleaning requirements in Division 1 Section "Closeout Procedures."

END OF SECTION 01500

Page 54: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01600 PRODUCT REQUIREMENTS

PAGE 1 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following administrative and procedural requirements: selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products.

1.3 DEFINITIONS

A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation, shown or listed in manufacturer's published product literature, that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved through submittal process, or where indicated as a product substitution, to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and accompanied by the words "basis of design," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other named manufacturers.

D. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a particular product and specifically endorsed by manufacturer to Owner.

E. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for Owner.

Page 55: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01600 PRODUCT REQUIREMENTS

PAGE 2 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1.4 SUBMITTALS

A. Substitution Requests: Substitutions are only permitted during the bidding phase. Requests for substitutions shall be made by the end of the second week of bidding. Acceptance or rejection of substitution request will be made in the form of Addenda to the Contract during the bidding process.

B. Submit three copies of each request for consideration. Identify product or fabrication or

installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Documentation: Show compliance with requirements for substitutions and the following,

as applicable:

a. Statement indicating why specified material or product cannot be provided. b. Coordination information, including a list of changes or modifications needed to

other parts of the Work and to construction performed by Owner and separate contractors, that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested. f. List of similar installations for completed projects with project names and

addresses and names and addresses of architects and owners. g. Material test reports from a qualified testing agency indicating and interpreting test

results for compliance with requirements indicated. h. Research/evaluation reports evidencing compliance with building code in effect for

Project, from a model code organization acceptable to authorities having jurisdiction.

i. Detailed comparison of Contractor's Construction Schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating lack of availability or delays in delivery.

j. Cost information, including a proposal of change, if any, in the Contract Sum. k. Contractor's certification that proposed substitution complies with requirements in

the Contract Documents and is appropriate for applications indicated. l. Contractor's waiver of rights to additional payment or time that may subsequently

become necessary because of failure of proposed substitution to produce indicated results.

C. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 1 Section "Submittal Procedures." Show compliance with requirements.

1.5 QUALITY ASSURANCE

Page 56: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01600 PRODUCT REQUIREMENTS

PAGE 3 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, product selected shall be compatible with products previously selected, even if previously selected products were also options.

1. Each contractor is responsible for providing products and construction methods compatible with products and construction methods of other contractors.

2. If a dispute arises between contractors over concurrently selectable but incompatible products, Architect will determine which products shall be used.

1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.

5. Store products to allow for inspection and measurement of quantity or counting of units. 6. Store materials in a manner that will not endanger Project structure. 7. Store products that are subject to damage by the elements, under cover in a weathertight

enclosure above ground, with ventilation adequate to prevent condensation. 8. Comply with product manufacturer's written instructions for temperature, humidity,

ventilation, and weather-protection requirements for storage. 9. Protect stored products from damage.

B. Storage: Provide a secure location and enclosure at Project site for storage of materials and equipment by Owner's construction forces. Coordinate location with Owner.

1.7 PRODUCT WARRANTIES

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution.

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

Page 57: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01600 PRODUCT REQUIREMENTS

PAGE 4 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2. Specified Form: Forms are included with the Specifications. Prepare a written document using appropriate form properly executed.

3. Refer to Divisions 2 through 16 Sections for specific content requirements and particular requirements for submitting special warranties.

PART 2 - PRODUCTS

2.1 PRODUCT OPTIONS

A. General Product Requirements: Provide products that comply with the Contract Documents, that are undamaged, and unless otherwise indicated, that are new at time of installation.

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Owner reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Architect will make selection.

5. Where products are accompanied by the term "match sample," sample to be matched is Architect's.

6. Descriptive, performance, and reference standard requirements in the Specifications establish "salient characteristics" of products.

7. Or Equal: Where products are specified by name and accompanied by the term "or equal" or "or approved equal" or "or approved," comply with provisions in "Comparable Products" Article to obtain approval for use of an unnamed product.

B. Product Selection Procedures: Procedures for product selection include the following:

1. Product: Where Specification paragraphs or subparagraphs titled "Product" name a single product and manufacturer, provide the product named.

2. Manufacturer/Source: Where Specification paragraphs or subparagraphs titled "Manufacturer" or "Source" name single manufacturers or sources, provide a product by the manufacturer or from the source named that complies with requirements.

3. Products: Where Specification paragraphs or subparagraphs titled "Products" introduce a

list of names of both products and manufacturers, provide one of the products listed that complies with requirements.

4. Manufacturers: Where Specification paragraphs or subparagraphs titled "Manufacturers" introduce a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements.

Page 58: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01600 PRODUCT REQUIREMENTS

PAGE 5 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

5. Available Products: Where Specification paragraphs or subparagraphs titled "Available Products" introduce a list of names of both products and manufacturers, provide one of the products listed.

6. Available Manufacturers: Where Specification paragraphs or subparagraphs titled "Available Manufacturers" introduce a list of manufacturers' names, provide a product by one of the manufacturers listed.

7. Product Options: Where Specification paragraphs titled "Product Options" indicate that size, profiles, and dimensional requirements on Drawings are based on a specific product or system, provide either the specific product or system indicated or a comparable product or system by another manufacturer. Comply with provisions in "Product Substitutions" Article.

8. Basis-of-Design Products: Where Specification paragraphs or subparagraphs titled "Basis-of-Design Product[s]" are included and also introduce or refer to a list of manufacturers' names, provide either the specified product or a comparable product by one of the other named manufacturers.

9. Visual Matching Specification: Where Specifications require matching an established Sample, select a product (and manufacturer) that complies with requirements and matches Architect's sample. Architect's decision will be final on whether a proposed product matches satisfactorily.

a. If no product available within specified category matches satisfactorily and complies with other specified requirements, comply with provisions of the Contract Documents on "substitutions" for selection of a matching product.

10. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, textures" or a similar phrase, select a product (and manufacturer) that complies with other specified requirements. a. Full Range: Where Specifications include the phrase "full range of colors,

patterns, textures" or similar phrase, Architect will select color, pattern, or texture from manufacturer's product line that includes both standard and premium items.

2.2 PRODUCT SUBSTITUTIONS

A. Timing: Architect will consider requests for substitution if received within the first two weeks of the bid period. Requests received after that time will be rejected.

B. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

1. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations.

2. Requested substitution does not require extensive revisions to the Contract Documents. 3. Requested substitution is consistent with the Contract Documents and will produce

indicated results.

Page 59: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01600 PRODUCT REQUIREMENTS

PAGE 6 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

4. Substitution request is fully documented and properly submitted. 5. Requested substitution will not adversely affect Contractor's Construction Schedule. 6. Requested substitution has received necessary approvals of authorities having

jurisdiction. 7. Requested substitution is compatible with other portions of the Work. 8. Requested substitution has been coordinated with other portions of the Work. 9. Any revisions necessary to drawings, details, installation time, sequence or procedures

have been documented and provided as part of the request. 10. Requested substitution provides specified warranty. 11. If requested substitution involves more than one contractor, requested substitution has

been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

2.3 COMPARABLE PRODUCTS

A. Where products or manufacturers are specified by name, submit the following, in addition to other required submittals, to obtain approval of an unnamed product:

1. Evidence that the proposed product does not require extensive revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated.

3. Evidence that proposed product provides specified warranty. 4. List of similar installations for completed projects with project names and addresses and

names and addresses of architects and owners, if requested. 5. Samples, if requested.

PART 3 - EXECUTION (Not Used)

END OF SECTION 01600

Page 60: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01700 EXECUTION REQUIREMENTS

PAGE 1 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:

1. Construction layout. 2. Field engineering and surveying. 3. General installation of products. 4. Coordination of Owner-installed products. 5. Progress cleaning. 6. Starting and adjusting. 7. Protection of installed construction. 8. Correction of the Work.

1.3 SUBMITTALS

A. Qualification Data: For professional engineer and surveyor to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

B. Certificates: Submit certificate signed by professional engineer or surveyor, as appropriate, certifying that location and elevation of improvements comply with requirements.

C. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.

D. Certified Surveys: Submit two copies signed by land surveyor.

1.4 QUALITY ASSURANCE

A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.

PART 2 - PRODUCTS (Not Used)

Page 61: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01700 EXECUTION REQUIREMENTS

PAGE 2 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.

1. Before construction, verify the location and points of connection of utility services.

B. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction affecting the Work.

1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; and underground electrical services.

2. Furnish location data for work related to Project that must be performed by public utilities serving Project site.

C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following:

a. Description of the Work. b. List of detrimental conditions, including substrates. c. List of unacceptable installation tolerances. d. Recommended corrections.

2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

3. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.

4. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.

5. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Existing Utility Information: Furnish information to Owner that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.

Page 62: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01700 EXECUTION REQUIREMENTS

PAGE 3 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Architect and Owner not less than three days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Owner's written permission.

C. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

D. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

E. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Architect. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

3.3 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly.

B. General: Engage a professional surveyor to lay out the Work using accepted surveying practices.

1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.

2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions.

3. Inform installers of lines and levels to which they must comply. 4. Check the location, level and plumb, of every major element as the Work progresses. 5. Notify Architect when deviations from required lines and levels exceed allowable

tolerances. 6. Close site surveys with an error of closure equal to or less than the standard established

by authorities having jurisdiction.

C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and invert elevations.

D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and

Page 63: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01700 EXECUTION REQUIREMENTS

PAGE 4 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

electrical work. Transfer survey markings and elevations for use with control lines and levels. Level foundations and piers from two or more locations.

E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect

3.4 FIELD ENGINEERING

A. Identification: Owner will identify existing benchmarks, control points, and property corners.

B. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.

1. Do not change or relocate existing benchmarks or control points without prior written approval of Architect. Report lost or destroyed permanent benchmarks or control points promptly. Report the need to relocate permanent benchmarks or control points to Architect before proceeding.

2. Replace lost or destroyed permanent benchmarks and control points promptly. Base replacements on the original survey control points.

C. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark.

1. Record benchmark locations, with horizontal and vertical data, on Project Record Documents.

2. Where the actual location or elevation of layout points cannot be marked, provide temporary reference points sufficient to locate the Work.

3. Remove temporary reference points when no longer needed. Restore marked construction to its original condition.

3.5 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level. 2. Where space is limited, install components to maximize space available for maintenance

and ease of removal for replacement. 3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

Page 64: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01700 EXECUTION REQUIREMENTS

PAGE 5 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.

F. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.

2. Allow for building movement, including thermal expansion and contraction.

G. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

H. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

3.6 OWNER-INSTALLED PRODUCTS

A. Site Access: Provide access to Project site for Owner's construction forces.

B. Coordination: Coordinate construction and operations of the Work with work performed by Owner's construction forces. 1. Construction Schedule: Inform Owner of Contractor's preferred construction schedule

for Owner's portion of the Work. Adjust construction schedule based on a mutually agreeable timetable. Notify Owner if changes to schedule are required due to differences in actual construction progress.

3.7 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F.

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

B. Site: Maintain Project site free of waste materials and debris.

Page 65: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01700 EXECUTION REQUIREMENTS

PAGE 6 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the

entire work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

G. Cutting and Patching: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials.

1. Thoroughly clean piping, conduit, and similar features before applying paint or other finishing materials. Restore damaged pipe covering to its original condition.

H. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

I. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

J. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

K. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.8 STARTING AND ADJUSTING

A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.

B. Adjust operating components for proper operation without binding. Adjust equipment for proper operation.

C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

Page 66: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01700 EXECUTION REQUIREMENTS

PAGE 7 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

D. Manufacturer's Field Service: If a factory-authorized service representative is required to inspect field-assembled components and equipment installation, comply with qualification requirements in Division 1 Section "Quality Requirements."

3.9 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

B. Comply with manufacturer's written instructions for temperature and relative humidity.

3.10 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. Comply with requirements in Division 1 Section "Cutting and Patching."

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

B. Restore permanent facilities used during construction to their specified condition.

C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.

D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.

E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.

END OF SECTION 01700

Page 67: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01731 CUTTING AND PATCHING

PAGE 1 OF 5

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes procedural requirements for cutting and patching for both existing and new construction.

1.3 DEFINITIONS

A. Cutting: Removal of existing construction necessary to permit installation or performance of other Work.

B. Patching: Fitting and repair work required to restore surfaces to original conditions after installation of other Work.

1.4 SUBMITTALS

A. Cutting and Patching Proposal: Submit a proposal describing procedures at least 10 days before the time cutting and patching will be performed, requesting approval to proceed. Include the following information:

1. Extent: Describe cutting and patching, show how they will be performed, and indicate why they cannot be avoided.

2. Changes to Existing Construction: Describe anticipated results. Include changes to structural elements and operating components as well as changes in building's appearance and other significant visual elements.

3. Products: List products to be used and firms or entities that will perform the Work. 4. Dates: Indicate when cutting and patching will be performed. 5. Utilities: List utilities that cutting and patching procedures will disturb or affect. List

utilities that will be relocated and those that will be temporarily out of service. Indicate how long service will be disrupted.

6. Structural Elements: Where cutting and patching involve adding reinforcement to structural elements, submit details and engineering calculations showing integration of reinforcement with original structure.

7. Architect's Approval: Obtain approval of cutting and patching proposal before cutting and patching. Approval does not waive right to later require removal and replacement of unsatisfactory work.

Page 68: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01731 CUTTING AND PATCHING

PAGE 2 OF 5

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1.5 QUALITY ASSURANCE

A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.

B. Operational Elements: Do not cut and patch the following operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety. 1. Conveying systems. 2. Electrical wiring systems. 3. Operating systems of special construction in Division 13 Sections.

C. Miscellaneous Elements: Do not cut and patch the following elements or related components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety. 1. Membranes and flashings. 2. Exterior curtain-wall construction. 3. Piping, ductwork, vessels, and equipment.

D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

1. If possible, retain original Installer or fabricator to cut and patch exposed Work listed below. If it is impossible to engage original Installer or fabricator, engage another recognized, experienced, and specialized firm.

a. Processed concrete finishes. b. Matched-veneer woodwork. c. Roofing. d. Wall covering.

E. Cutting and Patching Conference: Before proceeding, meet at Project site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.

1.6 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by methods and with materials so as not to void existing warranties.

PART 2 - PRODUCTS

Page 69: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01731 CUTTING AND PATCHING

PAGE 3 OF 5

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections of these Specifications.

B. Existing Materials: Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.

1. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Temporary Support: Provide temporary support of Work to be cut.

B. Protection: Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

D. Existing Services: Where existing services are required to be removed, relocated, or abandoned, bypass such services before cutting to interruption of services to occupied areas.

3.3 PERFORMANCE

A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut existing construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

Page 70: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01731 CUTTING AND PATCHING

PAGE 4 OF 5

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Cutting: Cut existing construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Existing Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

3. Concrete Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.

4. Excavating and Backfilling: Comply with requirements in applicable Division 2 Sections where required by cutting and patching operations.

5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

6. Proceed with patching after construction operations requiring cutting are complete.

C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections of these Specifications.

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

3. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

a. Where patching occurs in a painted surface, apply primer and intermediate paint coats over the patch and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces.

4. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition.

END OF SECTION 01731

Page 71: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01732 SELECTIVE DEMOLITION

PAGE 1 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Demolition and removal of selected portions of a building or structure. 2. Demolition and removal of selected elements. 3. Demolition, storage and re-installation of items 4. Repair procedures for selective demolition operations.

1.3 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, demolished materials shall become Contractor's property and shall be removed from Project site.

B. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to Owner that may be encountered during selective demolition remain Owner's property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to Owner.

1.4 PROJECT CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.

B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from authorities having jurisdiction.

C. Owner assumes no responsibility for condition of areas to be selectively demolished. 1. Conditions existing at time of inspection for bidding purposes will be maintained by

Owner as far as practical.

Page 72: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01732 SELECTIVE DEMOLITION

PAGE 2 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

E. Storage or sale of removed items or materials on-site will not be permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

PART 2 - PRODUCTS

2.1 REPAIR MATERIALS

A. Use repair materials identical to existing materials.

1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.

2. Use materials whose installed performance equals or surpasses that of existing materials.

B. Comply with material and installation requirements specified in individual Specification Sections.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.

D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect.

E. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

3.2 UTILITY SERVICES

Page 73: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01732 SELECTIVE DEMOLITION

PAGE 3 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

A. Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.

B. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by Owner and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and to authorities having jurisdiction.

1. Provide at least 72 hours' notice to Owner if shutdown of service is required during changeover.

3.3 PREPARATION

A. Dangerous Materials: Drain, purge, or otherwise remove, collect, and dispose of chemicals, gases, explosives, acids, flammables, or other dangerous materials before proceeding with selective demolition operations.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.

2. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.

3. Protect existing site improvements, appurtenances, and landscaping to remain. 4. Erect a plainly visible fence around drip line of individual trees or around perimeter drip

line of groups of trees to remain.

C. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

D. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

Page 74: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01732 SELECTIVE DEMOLITION

PAGE 4 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Where heating or cooling is needed and permanent enclosure is not complete, provide insulated temporary enclosures. Coordinate enclosure with ventilating and material drying or curing requirements to avoid dangerous conditions and effects.

E. Temporary Partitions: Erect and maintain dustproof partitions and temporary enclosures to limit dust and dirt migration and to separate areas from fumes and noise.

F. Temporary Shoring: Provide and maintain shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of construction to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

3.4 POLLUTION CONTROLS

A. Dust Control: Use water mist, temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.

1. Do not use water when it may damage existing construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.

2. Wet mop floors to eliminate trackable dirt and wipe down walls and doors of demolition enclosure.

B. Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

1. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

C. Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.5 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

Page 75: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01732 SELECTIVE DEMOLITION

PAGE 5 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain adequate ventilation when using cutting torches. 6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and

promptly dispose of off-site. 7. Remove structural framing members and lower to ground by method suitable to avoid

free fall and to prevent ground impact or dust generation. 8. Locate selective demolition equipment and remove debris and materials so as not to

impose excessive loads on supporting walls, floors, or framing. 9. Dispose of demolished items and materials promptly. 10. Return elements of construction and surfaces that are to remain to condition existing

before selective demolition operations began.

B. Removed and Reinstalled Items: Comply with the following:

1. Clean salvaged items. 2. Pack or crate items after cleaning. Identify contents of containers. 3. Protect items from damage during transport and storage.

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.

D. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals, using power-driven saw, then remove concrete between saw cuts.

E. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, then remove masonry between saw cuts.

F. Roofing: Remove no more existing roofing than can be covered in one day by new roofing. Refer to requirements for hazardous material removal, elsewhere in this Section. Refer to applicable Division 7 Section for new roofing requirements.

G. Existing Electrical: Remove existing electrical systems in their entirety. It is the intention of this Project that no existing utilities remain upon completion of the project.

3.6 PATCHING AND REPAIRS

A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.

B. Patching: Comply with Division 1 Section "Cutting and Patching."

Page 76: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01732 SELECTIVE DEMOLITION

PAGE 6 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

C. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.

1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.

D. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.

E. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

1. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections of these Specifications.

2. Where patching occurs in a painted surface, apply primer and intermediate paint coats over patch and apply final paint coat over entire unbroken surface containing patch. Provide additional coats until patch blends with adjacent surfaces.

3. Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation.

3.7 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

B. Burning: Do not burn demolished materials.

C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.

END OF SECTION 01732

Page 77: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01770 CLOSEOUT PROCEDURES

PAGE 1 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATIO

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures. 2. Project Record Documents. 3. Operation and maintenance manuals. 4. Warranties. 5. Instruction of Owner's personnel. 6. Final cleaning.

1.3 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Owner of pending insurance changeover requirements. 3. Submit specific warranties, workmanship bonds, maintenance service agreements, final

certifications, and similar documents. 4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to

services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.

7. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions.

8. Complete startup testing of systems. 9. Submit test/adjust/balance records. 10. Terminate and remove temporary facilities from Project site, along with mockups,

construction tools, and similar elements. 11. Advise Owner of changeover in heat and other utilities. 12. Submit changeover information related to Owner's occupancy, use, operation, and

maintenance. 13. Complete final cleaning requirements, including touchup painting.

Page 78: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01770 CLOSEOUT PROCEDURES

PAGE 2 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATIO

14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.

1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Architect will provide one re-inspection. The cost for additional inspections will be paid by the Contractor, in he form of a Change Order to the Contract.

3. Results of completed inspection will form the basis of requirements for Final Completion.

1.4 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit a final Application for Payment according to Division 1 Section "Payment Procedures."

2. Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

4. Submit pest-control final inspection report and warranty. 5. Instruct Owner's personnel in operation, adjustment, and maintenance of products,

equipment, and systems. Submit demonstration and training videotapes.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Architect will provide one re-inspection. The cost for additional inspections will be paid by the Contractor, in he form of a Change Order to the Contract.

1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

Page 79: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01770 CLOSEOUT PROCEDURES

PAGE 3 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATIO

1. Organize list of spaces in sequential order. 2. Organize items applying to each space by major element, including categories for ceiling,

individual walls, floors, equipment, and building systems. 3. Include the following information at the top of each page:

a. Project name. b. Date. c. Name of Architect. d. Name of Contractor. e. Page number.

1.6 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for Architect's reference during normal working hours.

B. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.

1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Accurately record information in an understandable drawing technique. c. Record data as soon as possible after obtaining it. Record and check the markup

before enclosing concealed installations. d. Mark Contract Drawings or Shop Drawings, whichever is most capable of showing

actual physical conditions, completely and accurately. Where Shop Drawings are marked, show cross-reference on Contract Drawings.

2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.

3. Mark important additional information that was either shown schematically or omitted from original Drawings.

4. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

5. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets; bind each set with durable paper cover sheets. Include identification on cover sheets.

C. Record Specifications: Submit one copy of Project's Specifications, including addenda and contract modifications. Mark copy to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

Page 80: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01770 CLOSEOUT PROCEDURES

PAGE 4 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATIO

2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected.

3. Note related Change Orders, Record Drawings where applicable.

D. Record Product Data: Submit one copy of each Product Data submittal. Mark one set to indicate the actual product installation where installation varies substantially from that indicated in Product Data.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.

3. Note related Change Orders, Record Drawings where applicable.

E. Miscellaneous Record Submittals: Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.

1.7 OPERATION AND MAINTENANCE MANUALS

A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system. Include operation and maintenance data required in individual Specification Sections and as follows:

1. Operation Data:

a. Emergency instructions and procedures. b. System, subsystem, and equipment descriptions, including operating standards. c. Operating procedures, including startup, shutdown, seasonal, and weekend

operations. d. Description of controls and sequence of operations. e. Piping diagrams.

2. Maintenance Data:

a. Manufacturer's information, including list of spare parts. b. Name, address, and telephone number of Installer or supplier. c. Maintenance procedures. d. Maintenance and service schedules for preventive and routine maintenance. e. Maintenance record forms. f. Sources of spare parts and maintenance materials. g. Copies of maintenance service agreements. h. Copies of warranties and bonds.

B. Organize operation and maintenance manuals into suitable sets of manageable size. Bind and index data in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, with pocket inside the covers to receive folded oversized sheets. Identify each binder on front and spine with the printed title "OPERATION AND MAINTENANCE MANUAL," Project name, and subject matter of contents.

Page 81: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01770 CLOSEOUT PROCEDURES

PAGE 5 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATIO

1.8 WARRANTIES

A. Submittal Time: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.

B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor.

C. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

D. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

PART 3 - EXECUTION

3.1 DEMONSTRATION AND TRAINING

A. Instruction: Instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.

1. Provide instructors experienced in operation and maintenance procedures. 2. Provide instruction at mutually agreed-on times. For equipment that requires seasonal

operation, provide similar instruction at the start of each season. 3. Schedule training with Owner with at least seven days' advance notice. 4. Coordinate instructors, including providing notification of dates, times, length of

instruction, and course content.

Page 82: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01770 CLOSEOUT PROCEDURES

PAGE 6 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATIO

3.2 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

d. Remove tools, construction equipment, machinery, and surplus material from Project site.

e. Remove snow and ice to provide safe access to building. f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition,

free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

g. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

h. Sweep concrete floors broom clean in unoccupied spaces. i. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other noticeable, vision-obscuring materials. Replace chipped or broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces.

j. Remove labels that are not permanent. k. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.

l. Wipe surfaces of mechanical and electrical equipment, and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.

m. Replace parts subject to unusual operating conditions. n. Clean plumbing fixtures to a sanitary condition, free of stains, including stains

resulting from water exposure. o. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency.

Replace burned-out bulbs, and those noticeably dimmed by hours of use, and

Page 83: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 01770 CLOSEOUT PROCEDURES

PAGE 7 OF 7

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATIO

defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

p. Leave Project clean and ready for occupancy.

C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 01770

Page 84: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 1 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, including but not limited to the following: 1. Slabs on grade. 2. Concrete footings. 3. Joint devices associated with concrete work.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

C. Laboratory Reports: Laboratory reports or evaluation reports for concrete mix design materials and mix designs.

D. Color and finish sample – provide three foot square sample panel for architect’s approval of slab color and finish texture, 1. Remove at completion of project.

1.4 QUALITY ASSURANCE

A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

B. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from one source, and obtain admixtures through one source from a single manufacturer.

C. Comply with American Concrete Institued, ACI 301-95, “Specification for Structural Concrete,” including the following sections, unless modified by requirements in the Contract Documents: 1. “General Requirements.”

Page 85: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 2 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2. “Formwork and Formwork Accessories.” 3. “Reinforcement and Reinforcement Supports.” 4. “Concrete Mixtures.” 5. “Handling, Placing, and Constructing.”

D. Comply with Concrete Reinforcing Steel Institute, CRSI, “Manual of Standard Practice” latest edition.

E. Comply with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

F. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements: 1. Aggregates. Include service record data indicating absence of deleterious expansion of

concrete due to alkali aggregate reactivity.

G. Material Certificates: For each of the following, signed by manufacturere,: 1. Cementitious materials. 2. Admixtures. 3. Steel reinforcement and accessories. 4. Curing compounds. 5. Vapor retarders. 6. Semi-rigid joint filler. 7. Joint-filler strips. 8. Repair materials.

PART 2 - PRODUCTS

2.1 FORMWORK

A. Furnish formwork and formwork accessories according to ACI 301. Provide form materials with sufficient stability to withstand pressure of placed concrete without bow or deflection.

2.2 STEEL REINFORCEMENT

A. Plain-Steel Welded Wire Fabric (WWF): ASTM A 185, fabricated from as-drawn steel wire into flat sheets. 1. 10.10 4”x4” wwm.

2.3 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:

1. Portland Cement: ASTM C 150, Type I or II.

Page 86: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 3 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Normal-Weight Aggregate ASTM C 33, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source .

1. Maximum Coarse-Aggregate Size: 1 inch nominal. 2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

C. Water: Potable.

2.4 ADMIXTURES

A. Air-Entraining Admixture: ASTM C 260.

2.5 RELATED MATERIALS

A. Plastic Vapor Retarder: ASTM E 1745, Class C. Include manufacturer's recommended adhesive or pressure-sensitive tape.

1. Products:

a. Fortifiber Corporation; Moistop Plus. b. Raven Industries Inc.; Dura Skrim 8. c. Reef Industries, Inc.; Griffolyn Type-85. d. Stego Industries, LLC; Stego Wrap, 10 mils.

B. Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber, or ASTM D 1752, cork or self-expanding cork.

2.6 CURING MATERIALS

A. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

B. Water: Potable.

2.7 CONCRETE MIXTURES

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

B. Cementitious Materials:[ Use fly ash, pozzolan, ground granulated blast-furnace slag, and silica fume as needed to reduce the total amount of portland cement, which would otherwise be used, by not less than 40 percent.][ Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:]

1. Fly Ash: 25 percent. 2. Combined Fly Ash and Pozzolan: 25 percent. 3. Ground Granulated Blast-Furnace Slag: 50 percent.

Page 87: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 4 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

4. Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace Slag: 50 percent portland cement minimum, with fly ash or pozzolan not exceeding 25 percent.

5. Silica Fume: 10 percent. 6. Combined Fly Ash, Pozzolans, and Silica Fume: 35 percent with fly ash or pozzolans not

exceeding 25 percent and silica fume not exceeding 10 percent. 7. Combined Fly Ash or Pozzolans, Ground Granulated Blast-Furnace Slag, and Silica

Fume: 50 percent with fly ash or pozzolans not exceeding 25 percent and silica fume not exceeding 10 percent.

C. Limit water-soluble, chloride-ion content in hardened concrete to [0.06] [0.15] [0.30] [1.00] percent by weight of cement.

D. Color Pigment: Add color pigment to concrete mixture according to manufacturer's written instructions and to result in hardened concrete color consistent with approved mockup.

2.8 CONCRETE MIXTURES

A. Comply with ACI 301-95 requirements for concrete mixtures.

B. Normal-Weight Concrete: Prepare design mixes, proportioned according to ACI 301, as follows:

1. Minimum Compressive Strength: 4500 psi at 28 days. 2. Maximum Water-Cementitious Materials Ratio: 0.45. 3. Slump Limit: Concrete slump variance is plus or minus one inch for approved mix

designs. 4. Air Content: 5% - 7% per ACI 301 for selected aggregate size.

2.9 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94, and furnish batch ticket information.

1. When air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes.

PART 3 - EXECUTION

3.1 FORMWORK

A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.

B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

Page 88: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 5 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows:

1. Class A, 1/8 inch for smooth-formed finished surfaces. 2. Class B, 1/4 inch for rough-formed finished surfaces.

D. Construct forms tightly enough to prevent loss of concrete mortar.

E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

1. Install keyways, reglets, recesses, and the like, for easy removal. 2. Do not use rust-stained steel form-facing material.

F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.

G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations.

H. Chamfer exterior corners and edges as indicated, using wood, metal, PVC, or rubber chamfer strips fabricated to produce uniform smooth lines and tight edge joints.

I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items.

J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

L. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

1. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC's "Code of Standard Practice for Steel Buildings and Bridges."

2. Install reglets to receive waterproofing and to receive through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.

Page 89: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 6 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

3.3 REMOVING AND REUSING FORMS

A. General: Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F (10 deg C) for 24 hours after placing concrete, if concrete is hard enough to not be damaged by form-removal operations and curing and protection operations are maintained.

B. Leave formwork for beam soffits, joists, slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.

C. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.

D. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent.

E. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Architect.

3.4 VAPOR RETARDERS

A. Install, protect, and repair vapor retarders according to ASTM E 1643-98; place sheets in position with longest dimension parallel with direction of pour. 1. Lap joints 6 inches and seal with manufacturer's recommended tape. 2. Lap vapor retarder over footings and seal to foundation walls. 3. Seal all penetrations including pipes per manufacturer’s recommendations. 4. Repair damaged areas by cutting patches of vapor retarder, overlapping damaged areas

six inches and taping all four sides.

3.5 STEEL REINFORCEMENT

A. Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.

3.6 JOINTS

A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

Page 90: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 7 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of concrete thickness as follows:

1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of contraction joints after applying surface finishes. Eliminate groover tool marks on concrete surfaces.

2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch wide joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.

D. Isolation Joints: Install joint-filler strips at junctions with slabs-on-grade and vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface, unless otherwise indicated.

3.7 CONCRETE PLACEMENT

A. Comply with ACI 301 for measuring, batching, mixing, transporting, and placing concrete.

B. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301.

C. Do not add water to concrete during delivery, at Project site, or during placement.

D. Consolidate concrete with mechanical vibrating equipment.

3.8 FINISHING FORMED SURFACES

A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections exceeding ½ inch.

1. Apply to concrete surfaces not exposed to public view.

B. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces, unless otherwise indicated.

3.9 FINISHING UNFORMED SURFACES

A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

Page 91: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 8 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or darbies to form a univorm and open-textured surface place before excess moisture or bleedwater appears on surface. 1. Do not further disturb surfaces before starting finishing operations.

C. Float Finish: Apply float finish to surfaces indicated, to surfaces to receive trowel finish, and to floor and slab surfaces to be covered with fluid-applied or sheet waterproofing, fluid-applied or direct-to-deck-applied membrane roofing, or sand-bed terrazzo.

D. Trowel Finish: Apply a trowel finish to monolithic slab surfaces exposed to view and slab surfaces to be covered with resilient flooring, carpet, ceramic or quarry tile, paint, or another thin-film-finish coating system.

a. After floating, begin first trowel-finish operation using a power-driven trowel. Begin final troweling when surface produces a ringing sound as trowel is moved over surface. Consolidate concrete surface by final hand-troweling operation, free of trowel marks, uniform in texture and appearance, and finish surfaces to tolerances of F(F) 30 (floor flatness) and F (L) 20 (floor levelness) with minimum local values of flatness, F(F) 24; and of levelness, F(L) 15; for suspended slabs measured according to ASTM E 1155. Grind smooth any surface defects that would telegraph through applied floor covering system..

E. Trowel and Fine-Broom Finish: Apply a partial trowel finish, stopping after second troweling, to surfaces indicated and to surfaces where ceramic or quarry tile is to be installed by either thickset or thin-set methods. Immediately after second troweling and while concrete is still plastic, slightly scarify surface with a fine broom.

1. Comply with flatness and levelness tolerances for trowel finished floor surfaces.

F. Nonslip Broom Finish: Apply a nonslip broom finish to surfaces indicated and to exterior concrete platforms, steps, and ramps. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route.

3.10 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing.

B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

C. Begin during after finishing concrete but not before free water has disappearred from concrete surface.

D. Curing Methods: Cure formed and unformced concrete for at least seven days by one or a combination of the following methods:

Page 92: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 9 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:

a. Water. b. Continuous water-fog spray. c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete

surfaces and edges with 12-inch lap over adjacent absorptive covers.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape.

3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.

3.11 FIELD QUALITY CONTROL

A. Testing and Inspecting: Owner will engage a special inspector and qualified testing and inspecting agency to sample materials, perform tests, and submit test reports during concrete placement according to requirements specified in this Article.

B. Testing and Inspecting: Engage a qualified testing and inspecting agency to perform tests and inspections and to submit reports.

C. Inspections:

1. Steel reinforcement placement. 2. Steel reinforcement welding. 3. Headed bolts and studs. 4. Verification of use of required design mixture. 5. Concrete placement, including conveying and depositing. 6. Curing procedures and maintenance of curing temperature. 7. Verification of concrete strength before removal of shores and forms from beams and

slabs.

D. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:

1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd. (4 cu. m), but less than 25 cu. yd. (19 cu. m), plus one set for each additional 50 cu. yd. (38 cu. m) or fraction thereof.

a. When frequency of testing will provide fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

Page 93: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 10 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change.

3. Air Content: ASTM C 231, pressure method, for normal-weight concrete; ASTM C 173/C 173M, volumetric method, for structural lightweight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

4. Unit Weight: ASTM C 567, fresh unit weight of structural lightweight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

5. Compression Test Specimens: ASTM C 31/C 31M.

a. Cast and laboratory cure two sets of two standard cylinder specimens for each composite sample.

b. Cast and field cure two sets of two standard cylinder specimens for each composite sample.

6. Compressive-Strength Tests: ASTM C 39/C 39M; test one set of two laboratory-cured specimens at 7 days and one set of two specimens at 28 days.

a. Test one set of two field-cured specimens at 7 days and one set of two specimens at 28 days.

b. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.

7. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete.

8. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive-strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi (3.4 MPa).

9. Test results shall be reported in writing to Architect, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive-strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7- and 28-day tests.

10. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Architect but will not be used as sole basis for approval or rejection of concrete.

11. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Architect. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 42/C 42M or by other methods as directed by Architect.

12. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

13. Correct deficiencies in the Work that test reports and inspections indicate dos not comply with the Contract Documents.

Page 94: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 11 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

3.12 REPAIRS

A. Patching Defective Areas: Repair and patch defective areas with cement mortar immediately after removal of forms, when acceptable to Engineer.

B. Cut out honeycombs, rock pockets, voids over ¼” in any dimension, and holes left by tie rods and bolts, down to solid concrete, but in no case to a depth of less than 1”. Make edges of cuts perpendicular to the concrete surface. Before placing cement mortar or proprietary agent, brush-coat the area to be patched with neat cement grout or proprietary bonding agent.

C. For surfaces exposed to view, blend white portland cement and standard portland cement so that, when dry, patching mortar will match surrounding color. Patch a test area at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface.

D. Repair of formed surfaces: Flush out form tie holes, fill with dry pack mortar, or precast cement cone plugs secured in place with bonding agent.

E. Repair defects on concealed formed surfaces that affect concrete's durability and structural performance as determined by Architect. If defects cannot be repaired, remove and replace concrete.

F. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and verify surface tolerances specified for each surface. Correct low and high areas as specified herein. Test unformed surfaces sloped to drain for trueness of slope and smoothness, using a template having required slope.

G. Repair finished surfaces containing defects. Surface defects include spalls, popouts, honeycombs, rock pockets, crazing and cracks in excess of 0.01 inch (0.25 mm) wide or that penetrate to reinforcement or completely through unreinforced sections regardless of width, and other objectionable conditions.

H. After concrete has cured at least 14 days, correct high areas by grinding.

I. Correct low areas in unformed surfaces during or immediately after completion of surface finishing operations by cutting out low areas and replacing with fresh concrete. Finish repaired areas to blend into adjacent concrete. Proprietary patching compounds may be used when acceptable to Engineer.

J. Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and expose steel reinforcement with at least a 3/4-inch (19-mm) clearance all around. Dampen concrete surfaces in contact with patching concrete and apply bonding agent. Mix patching concrete of same materials and mixture as original concrete except without coarse aggregate. Place, compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete.

K. Repair random cracks and single holes 1 inch or less in diameter with patching mortar. Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and loose particles. Dampen cleaned concrete surfaces and apply bonding agent. Place patching mortar before

Page 95: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 03300 CAST-IN-PLACE CONCRETE

PAGE 12 OF 12

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

bonding agent has dried. Compact patching mortar and finish to match adjacent concrete. Keep patched area continuously moist for at least 72 hours.

L. Use epoxy-based mortar, approved by the Engineer, for structural repairs. Structural repairs include, but are not limited to, areas of unsound (honeycombed or spalled) concrete with a surface area greater than 9 square inches and/or with a depth greater than 1.5 inches, areas where reinforcement is exposed, or areas with cracks greater than 1/16 inch in width. All areas requiring a structural patch shall be approved by the Engineer prior to commencing patching operations.

END OF SECTION 03300

Page 96: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 06105 MISCELLANEOUS CARPENTRY

PAGE 1 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Framing with dimension lumber. 2. Wood blocking, cants, nailers. furring and grounds. 3. Wood trim. 4. New and restored wood siding. 5. Wood Sheathing. 6. Interior and Exterior Finish Carpentry. 7. Site built millwork and cabinetry.

1.3 QUALITY ASSURANCE

A. Forest Certification: provide materials produced from wood obtained from forests certified by an FSC-accredited, SFI accredited or other accrediting agencies.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Stack lumber flat with spacers between each bundle to provide air circulation. Provide for air circulation around stacks and under coverings.

PART 2 - PRODUCTS

2.1 WOOD PRODUCTS, GENERAL

A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, provide lumber that complies with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Provide lumber graded by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated. 1. Provide certificates of grade compliance issued by grading agency. 2. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for

moisture content specified. Where actual sizes are indicated, they are minimum dressed sizes for dry lumber.

Page 97: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 06105 MISCELLANEOUS CARPENTRY

PAGE 2 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

3. Provide rough-sawn lumber and timbers for all exposed new and repaired framing and decking/sheathings. a. Provide rough sawn lumber from Congdon Lumber, Beaver Brook Road, Lyme,

CT or approved equal source. 4. Provide dressed lumber, S4S, in all other cases unless otherwise indicated.

2.2 -PRESERVATIVE-TREATED MATERIALS

A. Preservative Treatment by Pressure Process: AWPA C2.

1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.

2. For exposed items indicated to receive a stained or natural finish, use chemical formulations that do not require incising, contain colorants, bleed through, or otherwise adversely affect finishes.

B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or does not comply with requirements for untreated material.

C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.

1. Provide certificates of treatment compliance issued by inspection agency.

D. Application: Treat the following: 1. Wood framing, blocking and furring attached directly to masonry or concrete.

2.3 DIMENSION LUMBER FRAMING & ROOF SHEETHING

A. Maximum Moisture Content: 19 percent.

B. Framing: No. 1 or2 the following species:

1. Hem-fir (north); NLGA. 2. Southern pine; SPIB. 3. Douglas fir-larch; WCLIB or WWPA.

2.4 MISCELLANEOUS LUMBER

A. General: Provide miscellaneous lumber for support or attachment of other construction.

B. Provide Construction or No. 2 grade lumber with 19 percent maximum moisture content of any species.

Page 98: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 06105 MISCELLANEOUS CARPENTRY

PAGE 3 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2.5 INTERIOR WOOD TRIM

A. General: Provide kiln-dried finished surfaced material without finger-jointing.

B. Softwood Lumber Trim. 1. Grade Finish, eastern white pine; NeLMA or NLGA.

2.6 INTERIOR CABINETS & MILLWORK

A. Hardwood Lumber for Clear Oiled Finish: Grade A Finish white oak; NHLA.

B. Galvanized Steel Sheet for Counter Tops: Hot-dip, zinc-coated steel sheet complying with ASTM A 653/A 653M, G60 (Z180) coating designation.

2.7 LUMBER SIDING

A. Provide kiln-dried lumber siding complying with DOC PS 20.

B. Species and Grade: Grade A western red cedar; NLGA, WCLIB, or WWPA.

C. Pattern: match profile and size of existing siding.

2.8 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this Article for material and manufacture.

1. Where carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M.

B. Nails, Brads, and Staples: ASTM F 1667.

C. Power-Driven Fasteners: NES NER-272.

D. Wood Screws: ASME B18.6.1.

E. Lag Bolts: ASME B18.2.1 (ASME B18.2.3.8M).

F. Bolts: Steel bolts complying with ASTM A 307, Grade A (ASTM F 568M, Property Class 4.6); with ASTM A 563 (ASTM A 563M) hex nuts and, where indicated, flat washers.

G. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as

Page 99: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 06105 MISCELLANEOUS CARPENTRY

PAGE 4 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

determined by testing per ASTM E 488 conducted by a qualified independent testing and inspecting agency.

1. Material: Carbon-steel components, zinc plated to comply with ASTM B 633, Class Fe/Zn 5.

2.9 MISCELLANEOUS MATERIALS

A. Flexible Flashing: Self-adhesive, rubberized-asphalt compound, bonded to a high-density, polyethylene film to produce an overall thickness of not less than 0.025 inch (0.6 mm).

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Set carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit carpentry to other construction; scribe and cope as needed for accurate fit. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.

B. Framing Standard: Comply with AF&PA's "Details for Conventional Wood Frame Construction," unless otherwise indicated.

C. Do not splice structural members between supports, unless otherwise indicated.

D. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.

E. Sort and select lumber so that natural characteristics will not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of member or pieces that are too small to use with minimum number of joints or optimum joint arrangement.

F. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated lumber.

1. Use inorganic boron for items that are continuously protected from liquid water. 2. Use copper naphthenate for items not continuously protected from liquid water.

G. Securely attach carpentry work to substrate by anchoring and fastening as indicated, complying with the following:

1. NES NER-272 for power-driven fasteners. 2. Table 2304.9.1, "Fastening Schedule," in ICC's International Building Code. 3. Table 23-II-B-1, "Nailing Schedule," and Table 23-II-B-2, "Wood Structural Panel Roof

Sheathing Nailing Schedule," in ICBO's Uniform Building Code. 4. Table 2305.2, "Fastening Schedule," in BOCA's BOCA National Building Code.

Page 100: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 06105 MISCELLANEOUS CARPENTRY

PAGE 5 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

5. Table 2306.1, "Fastening Schedule," in SBCCI's Standard Building Code. 6. Table R602.3(1), "Fastener Schedule for Structural Members," and Table R602.3(2),

"Alternate Attachments," in ICC's International Residential Code for One- and Two-Family Dwellings.

7. Table 602.3(1), "Fastener Schedule for Structural Members," and Table 602.3(2), "Alternate Attachments," in ICC's International One- and Two-Family Dwelling Code.

H. Use common wire nails, unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood; do not countersink nail heads, unless otherwise indicated.

3.2 WOOD BLOCKING, AND NAILER INSTALLATION

A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.

B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces, unless otherwise indicated.

C. Provide permanent grounds of dressed, pressure-preservative-treated, key-beveled lumber not less than 1-1/2 inches (38 mm) wide and of thickness required to bring face of ground to exact thickness of finish material. Remove temporary grounds when no longer required.

D. Install new girts or nailers 24” on center to support siding.

3.3 WOOD TRIM INSTALLATION

A. Install with minimum number of joints practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches (610 mm) long except where necessary. Stagger joints in adjacent and related standing and running trim. Cope at returns and miter at corners to produce tight-fitting joints with full-surface contact throughout length of joint. Use scarf joints for end-to-end joints.

1. Match color and grain pattern across joints. 2. Drill pilot holes in hardwood before fastening to prevent splitting. Fasten to prevent

movement or warping. Countersink fastener heads and fill holes. 3. Install to tolerance of 1/8 inch in 96 inches (3 mm in 2438 mm) for level and plumb.

Install adjoining finish carpentry with 1/32-inch (0.8-mm) maximum offset for flush installation and 1/16-inch (1.6-mm) maximum offset for reveal installation.

3.4 STANDING AND RUNNING TRIM INSTALLATION

A. Install flat grain lumber with bark side exposed to weather.

Page 101: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 1 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

SECTION 074113 - METAL ROOF PANELS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Standing-seam metal roof panels. 2. Related sheet metal flashing and trim.

1.3 DEFINITIONS

A. Metal Roof Panel Assembly: Metal roof panels, attachment system components, miscellaneous metal framing, thermal insulation, and accessories necessary for a complete weathertight roofing system.

1.4 PERFORMANCE REQUIREMENTS

A. General Performance: Metal roof panels shall comply with performance requirements without failure due to defective manufacture, fabrication, installation, or other defects in construction.

B. Delegated Design: Design metal roof panel assembly, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

C. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class indicated.

1. Uplift Rating: UL 90.

D. FMG Listing: Provide metal roof panels and component materials that comply with requirements in FMG 4471 as part of a panel roofing system and that are listed in FMG's "Approval Guide" for Class 1 or noncombustible construction, as applicable. Identify materials with FMG markings.

1. Fire/Windstorm Classification: Class 1A-120. 2. Hail Resistance: SH.

Page 102: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 2 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

E. Thermal Movements: Allow for thermal movements resulting from ambient and surface temperature changes. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces.

1.5 SUBMITTALS

A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of roof panel and accessory.

B. Shop Drawings: Show fabrication and installation layouts of metal roof panels; details of edge conditions, side-seam and endlap joints, panel profiles, corners, anchorages, trim, flashings, closures, and accessories; and special details. Distinguish between factory- and field-assembled work.

1. Accessories: Include details of the following items, at a scale of not less than 1-1/2 inches per 12 inches (1:10):

a. Flashing and trim.

C. Samples for Verification: For each type of exposed finish required, prepared on Samples of size indicated below:

1. Metal Roof Panels: 12 inches (300 mm) long by actual panel width. Include fasteners, closures, and other metal roof panel accessories.

2. Accessories: 12-inch- (300-mm-) long Samples for each type of accessory.

D. Manufacturer Certificates: Signed by manufacturer certifying that roof panels comply with energy performance requirements specified in "Performance Requirements" Article.

1. Submit evidence of meeting performance requirements.

E. Qualification Data: For qualified Installer.

F. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for each product.

G. Maintenance Data: For metal roof panels to include in maintenance manuals.

H. Warranties: Samples of special warranties.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: An employer of workers trained and approved by manufacturer.

Page 103: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 3 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Source Limitations: Obtain each type of metal roof panels from single source from single manufacturer.

C. Preinstallation Conference: Conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency representative, metal roof panel Installer, metal roof panel manufacturer's representative, Installer, and installers whose work interfaces with or affects metal roof panels including installers of roof accessories and roof-mounted equipment.

2. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

3. Review methods and procedures related to metal roof panel installation, including manufacturer's written instructions.

4. Examine deck substrate conditions for compliance with requirements, including flatness and attachment to structural members.

5. Review structural loading limitations of deck during and after roofing. 6. Review flashings, special roof details, roof drainage, and condition of other construction

that will affect metal roof panels. 7. Review governing regulations and requirements for insurance, certificates, and testing

and inspecting if applicable. 8. Review temporary protection requirements for metal roof panel assembly during and

after installation. 9. Review roof observation and repair procedures after metal roof panel installation. 10. Document proceedings, including corrective measures and actions required, and furnish

copy of record to each participant.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Deliver components, sheets, metal roof panels, and other manufactured items so as not to be damaged or deformed. Package metal roof panels for protection during transportation and handling.

B. Unload, store, and erect metal roof panels in a manner to prevent bending, warping, twisting, and surface damage.

C. Stack metal roof panels on platforms or pallets, covered with suitable weathertight and ventilated covering. Store metal roof panels to ensure dryness. Do not store metal roof panels in contact with other materials that might cause staining, denting, or other surface damage.

D. Protect strippable protective covering on metal roof panels from exposure to sunlight and high humidity, except to extent necessary for period of metal roof panel installation.

1.8 PROJECT CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit metal roof panel work to be performed according to manufacturer's written instructions and warranty requirements.

Page 104: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 4 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Field Measurements: Verify actual dimensions of construction contiguous with metal roof panels by field measurements before fabrication.

1.9 COORDINATION

A. Coordinate sizes and locations of roof curbs, equipment supports, and roof penetrations with actual equipment provided.

B. Coordinate metal roof panels with rain drainage work, flashing, trim, and construction of decks, parapets, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.

1.10 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace metal roof panel assemblies that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Structural failures including rupturing, cracking, or puncturing. b. Deterioration of metals, metal finishes, and other materials beyond normal

weathering.

2. Warranty Period: Two years from date of Substantial Completion.

B. Special Warranty on Panel Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace metal roof panels that show evidence of deterioration of factory-applied finishes within specified warranty period.

1. Exposed Panel Finish: Deterioration includes, but is not limited to, the following:

a. Color fading more than 5 Hunter units when tested according to ASTM D 2244. b. Chalking in excess of a No. 8 rating when tested according to ASTM D 4214. c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.

2. Finish Warranty Period: 20 years from date of Substantial Completion.

C. Special Weathertightness Warranty for Standing-Seam Metal Roof Panels: Manufacturer's standard form in which manufacturer agrees to repair or replace standing-seam metal roof panel assemblies that fail to remain weathertight, including leaks, within specified warranty period.

1. Warranty Period: 20 years from date of Substantial Completion.

Page 105: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 5 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 2 - PRODUCTS

2.1 ROOFING SHEET METALS

A. General: Protect mechanical and other finishes on exposed surfaces from damage by applying a strippable, temporary protective film before shipping.

B. Zinc-Tin Alloy-Coated Copper Sheet: ASTM B 370, cold-rolled copper sheet, H00 temper, coated on both sides with a zinc-tin alloy (50 percent zinc, 50 percent tin).

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following]:

a. Revere Copper Products, Inc.; FreedomGray.

2. Weight (Thickness): 16-oz./sq. ft. uncoated weight with 0.787-mil (0.020-mm) coating thickness applied to each side.

2.2 UNDERLAYMENT MATERIALS

A. Self-Adhering, High-Temperature Sheet: 30 to 40 mils (0.76 to 1.0 mm) thick minimum, consisting of slip-resisting, polyethylene-film top surface laminated to layer of butyl or SBS-modified asphalt adhesive, with release-paper backing; cold applied. Provide primer when recommended by underlayment manufacturer.

1. Thermal Stability: Stable after testing at 240 deg F (116 deg C); ASTM D 1970. 2. Low-Temperature Flexibility: Passes after testing at minus 20 deg F (29 deg C);

ASTM D 1970. 3. Products: Subject to compliance with requirements, available products that may be

incorporated into the Work include, but are not limited to, the following:

a. Carlisle Coatings & Waterproofing Inc., Div. of Carlisle Companies Inc.; CCW WIP 300HT.

b. Grace Construction Products; a unit of Grace, W. R. & Co.; Ultra. c. Henry Company; Blueskin PE200 HT. d. Metal-Fab Manufacturing, LLC; MetShield. e. Owens Corning; WeatherLock Metal High Temperature Underlayment.

B. Felts: ASTM D 226, Type I (No. 15), asphalt-saturated organic felts.

2.3 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for a complete roofing system and as recommended by fabricator for sheet metal roofing.

Page 106: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 6 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Fasteners: Wood screws, annular-threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads.

1. General:

a. Exposed Fasteners: Heads matching color of sheet metal roofing using plastic caps or factory-applied coating.

b. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws, gasketed, with hex-washer head.

c. Blind Fasteners: High-strength aluminum or stainless-steel rivets suitable for metal being fastened.

2. Fasteners for Zinc-Tin Alloy-Coated Copper Sheet: Copper, hardware bronze, or Series 300 stainless steel.

C. Solder:

1. For Zinc-Tin Alloy-Coated Copper: ASTM B 32, Grade Sn50, 50 percent tin and 50 percent lead.

D. Sealant Tape: Pressure-sensitive, 100 percent solids, gray polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 1/2 inch (13 mm) wide and 1/8 inch (3 mm) thick.

E. Elastomeric Sealant: ASTM C 920, elastomeric polymer sealant; low modulus; of type, grade, class, and use classifications required to seal joints in sheet metal roofing and remain watertight.

2.4 CONCEALED-FASTENER, LAP-SEAM METAL ROOF PANELS

A. General: Provide factory-formed metal roof panels designed to be installed by lapping and interconnecting side edges of adjacent panels and mechanically attaching through panel to supports using concealed fasteners in side laps. Include accessories required for weathertight installation.

B. Standing-Seam-Profile, Concealed-Fastener Metal Roof Panels: Formed with raised, curved-top, standing-seam-shaped major rib at panel edge and flat pan between major rib and panel edge.

C. Zinc-Tin Alloy-Coated Copper Sheet: ASTM B 370, cold-rolled copper sheet, H00 temper, coated on both sides with a zinc-tin alloy (50 percent zinc, 50 percent tin).

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following]:

a. Revere Copper Products, Inc.; FreedomGray.

2. Weight (Thickness): 20-oz./sq. ft. uncoated weight with 0.787-mil (0.020-mm) coating thickness applied to each side.

Page 107: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 7 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

a. Batten Caps: 20-oz./sq. ft. (0.70-mm) uncoated weight (thickness), with 0.787-mil (0.020-mm) coating thickness applied to each side unless otherwise indicated.

3. Panel Coverage: 18 inches. 4. Seam Height: 1.5 inches.

2.5 ACCESSORIES

A. Sheet Metal Accessories: Provide components required for a complete sheet metal roofing assembly including trim, copings, corner units, clips, , sealants, gaskets, fillers, metal closures, closure strips, and similar items. Match material and finish of sheet metal roofing unless otherwise indicated.

1. Provide accessories as recommended by portable roll-forming equipment manufacturer to produce sheet metal roofing assemblies that comply with UL 580 for wind-uplift resistance classification specified in "Quality Assurance" Article.

2. Clips: Minimum 0.0625-inch- (1.6-mm-) thick, stainless-steel panel clips designed to withstand negative-load requirements.

3. Backing Plates: Plates at roofing splices, fabricated from material recommended by SMACNA.

4. Closure Strips: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin foam or closed-cell laminated polyethylene; minimum 1-inch- (25-mm-) thick, flexible-closure strips; cut or premolded to match sheet metal roofing profile. Provide closure strips where indicated or necessary to ensure weathertight construction.

5. Flashing and Trim: Formed from same material and with same finish as sheet metal roofing, minimum 0.018 inch (0.46 mm) thick.

2.6 FABRICATION

A. General: Custom fabricate sheet metal roofing to comply with details shown and recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to the design, dimensions (panel width and seam height), geometry, metal thickness, and other characteristics of installation indicated. Fabricate sheet metal roofing and accessories at the shop to greatest extent possible.

1. Standing-Seam Roofing: Form standing-seam panels with finished seam height of 1.5 inchea.

B. General: Fabricate roll-formed sheet metal roofing panels with UL-certified, portable roll-forming equipment capable of producing roofing panels for sheet metal roofing assemblies that comply with UL 580 for wind-uplift resistance classification specified in "Quality Assurance" Article. Fabricate roll-formed sheet metal according to equipment manufacturer's written instructions and to comply with details shown.

C. Fabrication Tolerances: Fabricate sheet metal roofing that is capable of installation to tolerances specified in MCA's "Guide Specification for Residential Metal Roofing."

Page 108: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 8 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

D. Form exposed sheet metal work to fit substrates without excessive oil canning, buckling, and tool marks; true to line and levels indicated; and with exposed edges folded back to form hems.

1. Lay out sheet metal roofing so transverse seams, if required, are made in direction of flow with higher panels overlapping lower panels.

2. Offset transverse seams from each other 12 inches minimum. 3. Fold and cleat eaves and transverse seams in the shop. 4. Form and fabricate sheets, seams, strips, cleats, valleys, ridges, edge treatments, integral

flashings, and other components of metal roofing to profiles, patterns, and drainage arrangements shown on Drawings and as required for leakproof construction.

E. Expansion Provisions: Fabricate sheet metal roofing to allow for expansion in running work sufficient to prevent leakage, damage, and deterioration of the Work. Where lapped expansion provisions cannot be used, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with butyl sealant concealed within joints.

F. Sealant Joints: Where movable, nonexpansion-type joints are indicated or required to produce weathertight seams, form metal to provide for proper installation of elastomeric sealant in compliance with SMACNA standards.

G. Metal Protection: Where dissimilar metals will contact each other, protect against galvanic action by painting contact surfaces with bituminous coating, by applying self-adhering sheet underlayment to each contact surface, or by other permanent separation as recommended by fabricator of sheet metal roofing or manufacturers of the metals in contact.

H. Sheet Metal Accessories: Custom fabricate flashings and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated. Obtain field measurements for accurate fit before shop fabrication.

1. Form exposed sheet metal accessories without excessive oil canning, buckling, and tool marks and true to line and levels indicated, with exposed edges folded back to form hems.

2. Seams: Fabricate nonmoving seams with flat-lock seams. Tin edges to be seamed, form seams, and solder.

3. Sealed Joints: Form nonexpansion but movable joints in metal to accommodate elastomeric sealant.

4. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not allowed on faces of accessories exposed to view.

5. Fabricate cleats and attachment devices of sizes as recommended by SMACNA's "Architectural Sheet Metal Manual" for application, but not less than thickness of metal being secured.

I. Do not use graphite pencils to mark metal surfaces.

2.7 FINISHES

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

Page 109: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 9 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

B. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, metal roof panel supports, and other conditions affecting performance of the Work.

B. Examine primary and secondary roof framing to verify that rafters, purlins, angles, channels, and other structural panel support members and anchorages have been installed within alignment tolerances required by metal roof panel manufacturer.

C. Examine solid roof sheathing to verify that sheathing joints are supported by framing or blocking and that installation is within flatness tolerances required by metal roof panel manufacturer.

D. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

E. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrates of substances harmful to insulation, including removing projections capable of interfering with insulation attachment.

3.3 UNDERLAYMENT INSTALLATION

A. Self-Adhering Sheet Underlayment: Apply primer if required by manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation. Apply at locations indicated below, wrinkle free, in shingle fashion to shed water, and with end laps of not less than 6 inches (150 mm) staggered 24 inches (600 mm) between courses. Overlap side edges not less than 3-1/2 inches Roll laps with roller. Cover underlayment within 14 days.

1. Roof perimeter for a distance up from eaves of 24 inches beyond interior wall line. 2. Rake edges for a distance of 18 inches.

B. Felt Underlayment: Apply at locations indicated, in shingle fashion to shed water, and with lapped joints of not less than 2 inches (50 mm).

Page 110: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 10 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Apply on roof not covered by self-adhering sheet underlayment. Lap over edges of self-adhering sheet underlayment not less than 3 inches (75 mm), in shingle fashion to shed water.

3.4 METAL ROOF PANEL INSTALLATION, GENERAL

A. General: Anchor sheet metal roofing and other components of the Work securely in place, with provisions for thermal and structural movement. Install fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for a complete roofing system and as recommended by fabricator for sheet metal roofing.

1. Field cutting of sheet metal roofing by torch is not permitted. 2. Provide metal closures at rake edge, eaves and each side of ridge caps. 3. Flash and seal sheet metal roofing with closure strips at eaves, rakes, and perimeter of all

openings. Fasten with self-tapping screws. 4. Locate and space fastenings in uniform vertical and horizontal alignment. Predrill panels

for fasteners. 5. Install ridge caps as sheet metal roofing work proceeds. 6. Locate roofing splices over, but not attached to, structural supports. Stagger roofing

splices and end laps to avoid a four-panel lap splice condition. Install backing plates at roofing splices.

7. Install sealant tape where indicated. 8. Lap metal flashing over sheet metal roofing to allow moisture to run over and off the

material.

B. Thermal Movement. Rigidly fasten metal roof panels to structure at only one location for each panel. Allow remainder of panel to move freely for thermal expansion and contraction.

1. Point of Fixity: Fasten each panel along a single line of fixing located at eave 2. Avoid attaching accessories through roof panels in a manner that will inhibit thermal

movement.

C. Fasteners: Use fasteners of sizes that will penetrate [wood sheathing not less than 1-1/4 inches (32 mm) for nails and not less than 3/4 inch (19 mm) for wood screws.

D. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating, by applying self-adhering sheet underlayment to each contact surface, or by other permanent separation as recommended by SMACNA.

E. Conceal fasteners and expansion provisions where possible in exposed work and locate to minimize possibility of leakage. Cover and seal fasteners and anchors as required for a tight installation.

F. Fasciae: Align bottom of sheet metal roofing and fasten with blind rivets, bolts, or self-tapping screws. Flash and seal sheet metal roofing with closure strips where fasciae meet soffits, along lower panel edges, and at perimeter of all openings.

Page 111: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 11 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

3.5 CUSTOM-FABRICATED SHEET METAL ROOFING INSTALLATION

A. Fabricate and install work with lines and corners of exposed units true and accurate. Form exposed faces flat and free of buckles, excessive waves, and avoidable tool marks, considering temper and reflectivity of metal. Provide uniform, neat seams with minimum exposure of solder, welds, and sealant. Fold back sheet metal to form a hem on concealed side of exposed edges unless otherwise indicated.

1. Install cleats to hold sheet metal panels in position. Attach each cleat with two fasteners to prevent rotation.

2. Fasten cleats not more than 12 inches (300 mm) o.c. Bend tabs over fastener head. 3. Provide expansion-type cleats and clips for roof panels that exceed 30 feet (9.1 m) in

length.

B. Seal joints as shown and as required for watertight construction. For roofing with 3:12 slopes or less, use cleats at transverse seams.

1. Where sealant-filled joints are used, embed hooked flanges of joint members not less than 1 inch (25 mm) into sealant. Form joints to completely conceal sealant. When ambient temperature at time of installation is moderate, between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement each way. Adjust setting proportionately for installation at higher ambient temperatures. Do not install sealant-type joints at temperatures below 40 deg F (4 deg C).

C. Soldered Joints: Clean surfaces to be soldered, removing oils and foreign matter. Pre-tin edges of sheets to be soldered to a width of 1-1/2 inches (38 mm), except reduce pre-tinning where pre-tinned surface would show in completed Work. 1. Do not pre-tin zinc-tin alloy-coated copper. 2. Do not use torches for soldering. Heat surfaces to receive solder and flow solder into

joint. Fill joint completely. Completely remove flux and spatter from exposed surfaces. 3. Copper Roofing: Tin edges of uncoated copper sheets, using solder for copper.

D. Standing-Seam Roofing: Attach standing-seam metal panels to substrate with cleats, double fastened at 12 inches o.c. Install panels reaching from eave to ridge before moving to adjacent panels. Before panels are interlocked, apply continuous bead of sealant to top of flange of lower panel. Lock standing seams by folding over twice so cleat and panel edges are completely engaged.

1. Lock each panel to panel below with soldered transverse seam. 2. Loose-lock panels at eave edges to continuous cleats and flanges at roof edge at gutters. 3. Loose-lock panels at eave edges to continuous edge flashing exposed 24 inches (610 mm)

from roof edge. Attach edge flashing to face of roof edge with continuous cleat fastened to roof substrate at 12 inches o.c. Lock panels to edge flashing.

4. Leave seams upright after locking at ridges and hips.

3.6 ON-SITE, ROLL-FORMED SHEET METAL ROOFING INSTALLATION

A. General: Install on-site, roll-formed sheet metal roofing fabricated from UL-certified equipment to comply with equipment manufacturer's written instructions for UL wind-uplift

Page 112: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 12 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

resistance class indicated. Provide sheet metal roofing of full length from eave to ridge unless otherwise restricted by on-site or shipping limitations.

B. Standing-Seam Sheet Metal Roofing: Fasten sheet metal roofing to supports with concealed clips at each standing-seam joint at location, at spacing, and with fasteners recommended by manufacturer of portable roll-forming equipment.

1. Install clips to substrate with self-tapping fasteners. 2. Install pressure plates at locations indicated in equipment manufacturer's written

installation instructions. 3. Before panels are joined, apply continuous bead of sealant to top of flange of lower

panel. 4. Snap-On Seam: Nest standing seams and fasten together by interlocking and completely

engaging field-applied sealant. 5. Seamed Joint: Crimp standing seams with manufacturer-approved motorized seamer tool

so cleat, sheet metal roofing, and field-applied sealant are completely engaged.

C. Seal joints as shown and as required for watertight construction. For roofing with 3:12 slopes or less, use cleats at transverse seams.

1. Where sealant-filled joints are used, embed hooked flanges of joint members not less than 1 inch (25 mm) into sealant. Form joints to completely conceal sealant. When ambient temperature at time of installation is moderate, between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement either way. Adjust setting proportionately for installation at higher ambient temperatures. Do not install sealant-type joints at temperatures below 40 deg F (4 deg C).

2. Prepare joints and apply sealants to comply with requirements in Division 7 Section "Joint Sealants."

3.7 ACCESSORY INSTALLATION

A. General: Install accessories with positive anchorage to building and weathertight mounting and provide for thermal expansion. Coordinate installation with flashings and other components.

1. Install components required for a complete sheet metal roofing assembly including trim, copings, seam covers, flashings, sealants, gaskets, fillers, metal closures, closure strips, and similar items.

2. Install accessories integral to sheet metal roofing that are specified in Division 7 Section "Sheet Metal Flashing and Trim" to comply with that Section's requirements.

B. Flashing and Trim: Comply with performance requirements, manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.

1. Install flashing and trim as required to seal against weather and to provide finished appearance. Locations include, but are not limited to, eaves, rakes, corners, bases, framed openings, ridges, fasciae, and fillers.

Page 113: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 13 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2. Install continuous strip of self-adhering underlayment at edge of continuous flashing overlapping self-adhering underlayment, where "continuous seal strip" is indicated in SMACNA's "Architectural Sheet Metal Manual," and where indicated on Drawings.

3. Install exposed flashing and trim without excessive oil canning, buckling, and tool marks and true to line and levels indicated, with exposed edges folded back to form hems. Install sheet metal flashing and trim to fit substrates and to result in waterproof and weather-resistant performance.

4. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at a maximum of 10 feet (3 m) with no joints allowed within 24 inches (600 mm) of corner or intersection. Where lapped expansion provisions cannot be used or would not be sufficiently weather resistant and waterproof, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, and filled with butyl sealant concealed within joints.

3.8 ERECTION TOLERANCES

A. Installation Tolerances: Shim and align sheet metal roofing within installed tolerances specified in MCA's "Guide Specification for Residential Metal Roofing."

3.9 CLEANING AND PROTECTION

A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.

B. Clean and neutralize flux materials. Clean off excess solder.

C. Clean off excess sealants.

D. Remove temporary protective coverings and strippable films as sheet metal roofing is installed unless otherwise indicated in manufacturer's written installation instructions. On completion of sheet metal roofing installation, clean finished surfaces as recommended by sheet metal roofing manufacturer. Maintain sheet metal roofing in a clean condition during construction.

E. Replace sheet metal roofing components that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.

3.10 ROOFING INSTALLER'S WARRANTY

A. WHEREAS <Insert name> of <Insert address>, herein called the "Roofing Installer," has performed roofing and associated work ("work") on the following project:

1. Owner: <Insert name of Owner>. 2. Address: <Insert address>. 3. Building Name/Type: <Insert information>. 4. Address: <Insert address>. 5. Area of Work: <Insert information>. 6. Acceptance Date: <Insert date>.

Page 114: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 14 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

7. Warranty Period: <Insert time>. 8. Expiration Date: <Insert date>.

B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period,

C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will, at his own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition.

D. This Warranty is made subject to the following terms and conditions:

1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by:

a. Lightning; b. Basic wind speed exceeding 120 mph ; c. Fire; d. Failure of roofing system substrate, including cracking, settlement, excessive

deflection, deterioration, and decomposition; e. Faulty construction of parapet walls, copings, chimneys, skylights, vents,

equipment supports, and other edge conditions and penetrations of the work; f. Vapor condensation on bottom of roofing; and g. Activity on roofing by others, including construction contractors, maintenance

personnel, other persons, and animals, whether authorized or unauthorized by Owner.

2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.

3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.

4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty.

5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.

Page 115: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07610 SHEET METAL ROOFING

PAGE 15 OF 15

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration.

7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor.

E. IN WITNESS THEREOF, this instrument has been duly executed this <Insert day> day of <Insert month>, <Insert year>.

1. Authorized Signature: <Insert signature>. 2. Name: <Insert name>. 3. Title: <Insert title>.

END OF SECTION 07610

Page 116: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07620 SHEET METAL FABRICATIONS (COUNTERTOPS & SINKS)

PAGE 1 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Formed Products:

a. Custom sheet metal fabrications.

1.3 PERFORMANCE REQUIREMENTS

A. General: Sheet metal fabrications with related wood supports shall withstand static (50 psf) and impact (250 pond) loads without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.

B. Thermal Movements: Provide sheet metal flashing and trim that allows for thermal movements from ambient and surface temperature changes.

1. Temperature Change (Range): [120 deg F (67 deg C), ambient.

1.4 SUBMITTALS

A. Shop Drawings: Show fabrication and installation layouts of sheet metal fabrications, including plans, elevations, joint locations, and keyed details. Distinguish between shop- and field-assembled work. Include the following:

1. Identification of material, thickness, weight, and finish for each item and location in Project.

2. Details for forming sheet metal flashing and trim, including profiles, shapes, seams, and dimensions.

3. Details for joining, supporting, and securing sheet metal fabrications, including layout of fasteners, cleats, clips, and other attachments

Page 117: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07620 SHEET METAL FABRICATIONS (COUNTERTOPS & SINKS)

PAGE 2 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1.5 QUALITY ASSURANCE

A. Fabricator Qualifications: Shop that employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance.

B. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet Metal Manual" unless more stringent requirements are specified or shown on Drawings.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining, denting, or other surface damage. Store sheet metal flashing and trim materials away from uncured concrete and masonry.

PART 2 - PRODUCTS

2.1 SHEET METALS

A. Metallic-Coated Steel Sheet: Restricted flatness steel sheet, metallic coated by the hot-dip process and prepainted by the coil-coating process to comply with ASTM A 755/A 755M.

1. Zinc-Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 (Z275) coating designation; structural quality.

2.2 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation and recommended by manufacturer of primary sheet metal[ or manufactured item] unless otherwise indicated.

B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal. 1. Fasteners for Zinc-Coated (Galvanized Steel Sheet: Series 300 stainless steel.

2.3 FABRICATION, GENERAL

A. General: Custom fabricate sheet metal fabrications to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, geometry, metal thickness, and other characteristics of item indicated. Fabricate items at the shop to greatest extent possible.

Page 118: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07620 SHEET METAL FABRICATIONS (COUNTERTOPS & SINKS)

PAGE 3 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Fabricate sheet metal in thickness or weight needed to comply with performance requirements, but not less than that specified for each application and metal.

2. Obtain field measurements for accurate fit before shop fabrication. 3. Form sheet metal without excessive oil canning, buckling, and tool marks and true to line

and levels indicated, with exposed edges folded back to form hems. 4. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not

allowed on faces exposed to view.

B. Fabrication Tolerances: Fabricate sheet metal flashing and trim that is capable of installation to a tolerance of 1/4 inch in 20 feet (6 mm in 6 m) on slope and location lines as indicated and within 1/64-inch (1-mm) offset of adjoining faces and of alignment of matching profiles.

C. Sealed Joints: Form nonexpansion but movable joints in metal to accommodate elastomeric sealant.

D. Expansion Provisions: Where lapped expansion provisions cannot be used, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with butyl sealant concealed within joints.

E. Do not use graphite pencils to mark metal surfaces.

2.4 SHEET METAL FABRICATIONS

A. Countertops: Custom fabricate to seamless three-dimensional profiles for each location.

1. Fabricate from the following materials:

a. Galvanized Steel: 14 gauge thick.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions and other conditions affecting performance of the Work.

1. Verify compliance with requirements for installation tolerances of substrates. 2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely

anchored.

3.2 INSTALLATION, GENERAL

A. General: Anchor sheet metal and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, welding rods, protective coatings, separators, sealants, and adhesives to complete the functional system.

Page 119: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 07620 SHEET METAL FABRICATIONS (COUNTERTOPS & SINKS)

PAGE 4 OF 4

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Install sheet metal flashing and trim true to line and levels indicated. Provide uniform, neat seams with minimum exposure of solder, welds, and sealant.

2. Install sheet metal to fit substrates and to result in hand smooth pieces. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal.

3. Install exposed sheet metal without excessive oil canning, buckling, and tool marks. 4. Grind smooth all edges and transitions. 5. Do not use graphite pencils to mark metal surfaces.

3.3 CLEANING AND PROTECTION

A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.

B. Clean off excess sealants.

C. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed unless otherwise indicated in manufacturer's written installation instructions. On completion of installation, remove unused materials and clean finished surfaces. Maintain in a clean condition during construction.

END OF SECTION 076200

Page 120: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 09930 STAINING AND TRANSPARENT FINISHING

PAGE 1 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes surface preparation and the application of wood finishes on the following substrates:

1. Exterior Substrates: a. Existing and new wood siding and trim. b. Existing and new wood doors and windows.

2. Interior Substrates: a. Dressed lumber (finish carpentry).

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Samples for Verification: For each type of finish system and in each color and gloss of finish indicated.

1. Submit Samples on representative samples of actual wood substrates, 8 inches (200 mm) square.

2. Label each Sample for location and application area.

C. Product List: For each product indicated, include the following:

1. Cross-reference to finish system and locations of application areas. Use same designations indicated on Drawings and in schedules.

2. Printout of MPI's current "MPI Approved Products List" for each product category specified in Part 2, with the product proposed for use highlighted.

1.4 QUALITY ASSURANCE

A. MPI Standards:

1. Products: Complying with MPI standards indicated and listed in its "MPI Approved Products List."

2. Preparation and Workmanship: Comply with requirements in "MPI Architectural Painting Specification Manual" for products and finish systems indicated.

Page 121: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 09930 STAINING AND TRANSPARENT FINISHING

PAGE 2 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1.5 DELIVERY, STORAGE, AND HANDLING

A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F (7 deg C).

1. Maintain containers in clean condition, free of foreign materials and residue. 2. Remove rags and waste from storage areas daily.

1.6 PROJECT CONDITIONS

A. Apply finishes only when temperature of surfaces to be finished and ambient air temperatures are between 50 and 95 deg F (10 and 35 deg C).

B. Do not apply exterior finishes in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Benjamin Moore & Co. 2. Cabot Incorporated, Samuel. 3. California Paints. 4. ICI Paints. 5. PPG Architectural Finishes, Inc. 6. Sherwin-Williams Company (The)

2.2 MATERIALS, GENERAL

A. Material Compatibility:

1. Provide materials for use within each finish system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

2. For each coat in a finish system, provide products recommended in writing by manufacturers of topcoat for use in finish system and on substrate indicated.

B. VOC Content of Field-Applied Interior Primers, Stains, and Transparent Finishes: Provide products that comply with the following limits for VOC content, exclusive of colorants added to

Page 122: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 09930 STAINING AND TRANSPARENT FINISHING

PAGE 3 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24); these requirements do not apply to primers, stains, and transparent finishes that are applied in a fabrication or finishing shop:

1. Flat Primers: VOC content of not more than 50 g/L. 2. Nonflat Primers: VOC content of not more than 150 g/L. 3. Primers, Sealers, and Undercoaters: VOC content of not more than 200 g/L. 4. Clear Wood Finishes, Varnishes: VOC not more than 350 g/L. 5. Clear Wood Finishes, Lacquers: VOC not more than 550 g/L. 6. Floor Coatings: VOC not more than 100 g/L. 7. Shellacs, Clear: VOC not more than 730 g/L. 8. Stains: VOC not more than 250 g/L.

C. Stain Colors: As selected by Architect from manufacturer's full range.

2.3 WOOD FILLERS

A. Wood Filler Paste: MPI #91.

1. VOC Content: E Range of E3.

2.4 PRIMERS AND SEALERS

A. Exterior Alkyd Wood Primer: MPI #5.

1. VOC Content: E Range of [E2] [E3].

B. Exterior Latex Wood Primer: MPI #6.

1. VOC Content: E Range of E3.

2.5 STAINS

A. Exterior, Solid-Color Latex Stain: MPI #16.

1. VOC Content: E Range of E3.

B. Stain for Wood Decks: MPI #33.

1. VOC Content: E Range of [E1] [E3].

C. Interior Wood Stain (Semitransparent): - Danish Oil.

1. VOC Content: E Range of E1.

Page 123: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 09930 STAINING AND TRANSPARENT FINISHING

PAGE 4 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of work.

1. Maximum Moisture Content of Wood Substrates: 15 percent when measured with an electronic moisture meter.

2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes.

3. Begin finish application only after unsatisfactory conditions have been corrected and surfaces are dry.

4. Beginning application of finish system constitutes Contractor's acceptance of substrate and conditions.

3.2 PREPARATION

A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual" applicable to substrates indicated.

B. Remove plates, machined surfaces, and similar items already in place that are not to be finished. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and finishing.

1. After completing finishing operations, reinstall items that were removed; use workers skilled in the trades involved. Remove surface-applied protection if any.

C. Clean and prepare surfaces to be finished according to manufacturer's written instructions for each particular substrate condition and as specified.

1. Remove surface dirt, oil, or grease by washing with a detergent solution; rinse thoroughly with clean water and allow to dry. Remove grade stamps and pencil marks by sanding lightly. Remove loose wood fibers by brushing.

2. Remove mildew by scrubbing with a commercial wash formulated for mildew removal and as recommended by stain manufacturer.

3. Countersink steel nails, if used, and fill with putty tinted to final color to eliminate rust leach stains.

D. Apply wood filler paste to open-grain woods, as defined in "MPI Architectural Painting Specification Manual," to produce smooth, glasslike finish.

3.3 APPLICATION

A. Apply finishes according to manufacturer's written instructions.

1. Use applicators and techniques suited for finish and substrate indicated.

Page 124: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 09930 STAINING AND TRANSPARENT FINISHING

PAGE 5 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

2. Finish surfaces behind movable equipment and furniture same as similar exposed surfaces.

B. Apply finishes to produce surface films without cloudiness, holidays, lap marks, brush marks, runs, ropiness, or other surface imperfections.

3.4 FIELD QUALITY CONTROL

A. Owner reserves the right to invoke the following procedure at any time and as often as Owner deems necessary during the period when finishes are being applied:

1. Owner will engage the services of a qualified testing agency to sample finish materials being used. Samples of material delivered to Project site will be taken, identified, sealed, and certified in presence of Contractor.

2. Testing agency will perform tests for compliance with product requirements. 3. Owner may direct Contractor to stop applying finishes if test results show materials being

used do not comply with product requirements. Contractor shall remove noncomplying materials from Project site, pay for testing, and refinish surfaces finished with rejected materials. Contractor will be required to remove rejected materials from previously finished surfaces if, on refinishing with complying materials, the two finishes are incompatible.

3.5 CLEANING AND PROTECTION

A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.

B. After completing finish application, clean spattered surfaces. Remove spattered materials by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

C. Protect work of other trades against damage from finish application. Correct damage by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.

D. At completion of construction activities of other trades, touch up and restore damaged or defaced finished wood surfaces.

3.6 EXTERIOR WOOD-FINISH-SYSTEM SCHEDULE

A. New Wood Siding and Trim, Doors, Windows and Misc. Carpentry Substrates:

1. Solid-Color Latex Stain System: MPI EXT 6.2B.

a. Prime Coat: Exterior wood primer. b. Two Stain Coats: Exterior, solid-color latex stain.

B. Existing Wood Siding and Trim, Doors, Windows and Misc. Carpentry Substrates:

Page 125: 07280 00001 Table of Contents specification.pdf · SECTION 00001 TABLE OF CONTENTS PAGE 2 OF 2 9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT LANDSCAPE CENTER / BARN RENOVATION

SECTION 09930 STAINING AND TRANSPARENT FINISHING

PAGE 6 OF 6

9/2/08 FLORENCE GRISWOLD MUSEUM OLD LYME, CONNECTICUT

LANDSCAPE CENTER / BARN RENOVATION

1. Solid-Color Latex Stain System: MPI EXT 6.2B.

a. Two Stain Coats: Exterior, solid-color latex stain.

3.7 INTERIOR WOOD-FINISH-SYSTEM SCHEDULE

1. Danish Oil System: MPI INT 6.3M.

a. Two Finish Coats: Danish oil.