CLIENT ORDER QUOTATION Lift/System LIFT SHAFT STRUCTURE INSTALLATION Kg lift Load Home lift Upright Measurements brackets supply for guide rail anchorage Type or car model 145 55 145 80 145 100 145 120 145 145 internal external STRUCTURE DIMENSIONS AND CLADDING galvanised Anti-corrosion epoxy RAL STRUCTURE PAINTING colour type type colour type plastic coated steel sheet scratchproof coloured steel decorated steel UPRIGHT JAMBS AND CROSSBEAM CLADDING MATERIALS SHAFT STRUCTURE HEIGHT AND INTER-FLOOR HEIGHT Inter-floor heights are the exact vertical distance worked out between each treaded floor n. of landings Please, indicate any additional landings Ovrhead mm Travel mm Pit mm Total mm Height between floor -1 to floor 0 Height between floor 0 to floor 1 Height between floor 1 to floor 2 Height between floor 2 to floor 3 Height between floor 3 to floor 4 Height between floor 4 to floor 5 Height between floor 5 to floor 6 1 2 3 4 Shaft strcture external part Shaft struture external part D C side 3 A side 1 side 4 B side 2 landing side 0 Car side 1 2 3 4 Access side Micaceous iron Slim 30 mm Ref. Lift/System Ref. CMA PLEASE NOTE: The standard structure supplied is to be understood as not statically independent because it needs to be anchored to the surrounded structures every three meters height. The standard pitch between each crossbeam of the shaft structure is 1.5 mt. It does not include any assembly and/or masonry work. The measurements are expressed in mm. Please return this form completed in all its parts together with a copy of the project. colour colour Mod. M07-2a_7 (EN) C.M.A. Srl - Corato (BA) - ITALY - pag. 1/2 - Ed. 1 Rev. 0 del 14.03.2016

Transcript of 06 VANO CORSA ING DEF01 - CMAlifts · 2020. 2. 20. · Landing manual swing doors CMAlifts supplied...

Page 1: 06 VANO CORSA ING DEF01 - CMAlifts · 2020. 2. 20. · Landing manual swing doors CMAlifts supplied Prearrangement only LIFT/SYSTEM INFORMATION ACCESSES AUTOMATIC CENTRAL AUTOMATIC

CLIENT

ORDERQUOTATION

N° Lift/System

LIFT SHAFT STRUCTURE

INSTALLATIONKglift Load Home lift

UprightMeasurements

brackets supply for guide rail anchorage

Type or car model

14555

14580

145100

145120

145145

internal external

STRUCTURE DIMENSIONS AND CLADDING

galvanisedAnti-corrosion epoxyRAL

STRUCTURE PAINTING

colour

typetype

colour

type

plastic coated steel sheet

scratchproof coloured steel decorated steel

UPRIGHT JAMBS AND CROSSBEAM CLADDING MATERIALS

SHAFT STRUCTURE HEIGHT AND INTER-FLOOR HEIGHT Inter-floor heights are the exact vertical distance worked out between each treaded floor

n. of landings

Please, indicate any additional landings

Ovrhead mm

Travel mm

Pit mm

Total mm

Height between floor -1 to floor 0

Height between floor 0 to floor 1

Height between floor 1 to floor 2

Height between floor 2 to floor 3

Height between floor 3 to floor 4

Height between floor 4 to floor 5

Height between floor 5 to floor 6

1 2 3 4Sh

aft s

trctu

re e

xter

nal p

art

Shaft struture external part

DC side 3

Aside 1

side 4

B

side 2

landing side 0

Car side 1 2 3 4Access side

Micaceous iron

Slim30 mm

Ref. Lift/System

Ref. CMA

PLEASE NOTE: The standard structure supplied is to be understood as not statically independent because it needs to be anchored to the surrounded structures every three meters height. The standard pitch between each crossbeam of the shaft structure is 1.5 mt. It does not include any assembly and/or masonry work. The measurements are expressed in mm. Please return this form completed in all its parts together with a copy of the project.

colourcolour

Mod.

M07-

2a_7

(EN)

C.M.

A. Sr

l - Co

rato

(BA)

- ITA

LY -

pag.

1/2 -

Ed. 1

Rev

. 0 de

l 14.0

3.201

6

Page 2: 06 VANO CORSA ING DEF01 - CMAlifts · 2020. 2. 20. · Landing manual swing doors CMAlifts supplied Prearrangement only LIFT/SYSTEM INFORMATION ACCESSES AUTOMATIC CENTRAL AUTOMATIC

Side 3

Structure for seismic areas Self-supporting structure shaft structure calculations reportTYPE OF STRUCTURE

steel sheetsShaft structure roof supply

Roof flush to shaft

structure

landing doors supply

Pit Infill

roof air hole sideglass prearrengement onlySide1crystal Side 4Side 2bronze smoked clear

EXTERIOR FINISHES Please, note that the roof features a perimetrical framework protuding 50 mm beyond the structure edge.

Automatic landing doors

CMAlifts supplied

prearrangement only

Automatic folding doors

CMAlifts supplied

Prearrangement only

1 AT

2 AT

3 AT

left n.

left n.

left n.

n° accesses 2 AO

n° accesses 4 AO

n° accesses 6 AO

right n.

right n.

right n.

FLOOR 0 ACCESS SIDE MEASUREMENTS

height

height

N. of landings

Access opening size width

widthExternalmeasurements

Landing manual swing doors

CMAlifts supplied

Prearrangement only

LIFT/SYSTEM INFORMATION

ACCESSES

AUTOMATIC

CENTRAL

AUTOMATIC TELESCOPIC ACCESSES

(DOOR CLOSING VIEW FROM THE

LANDING)

AVAILABLE MATERIALS

1

COMMERCIAL INFORMATION

Note

Delivery time

Delivery Address

Transport

DATEAuthorising signature and company stamp

1

colour

SHAFT STRUCTURE INFILL

2 23 3

colour4 4

Supply

5 56 6

type7 78 8

colour9 9

type10 10

type11 11

supply12 12

Anti-corrosion epoxy paintRAL paint

Plastic coated sheetSkinplate

Polished steel BA

ScotchBrite steel

Scratch proof steel

Mirror polished steel

Coloured steel

Decorated steel

Wood

13

LANDING DOOR-FRAME SIDE PART INFILL

Materials and colours for landing doors

LANDING DOOR FRAME MATERIALS

holecorrugated insulated shutter

Side Supply Supply

prearrangement only

13 Safety glass

Insulated

supply13

1 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 4

Note

1

colour23

colour456

type78

colour9

type10

type11

supply1213

prearrangement only

supply13

1 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 4

1

colour23

colour456

type78

colour9

type10

type11

1 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 41 2 3 4

2nd ACCESS SIDE MEASUREMENTS

height

height

N. of landings

Access opening size width

widthExternal measurements

3nd ACCESS SIDE MEASUREMENTS

height

height

N. of landings

Access opening size width

widthExternal measurements

Crate packaging Shrink-wrapped

ROOF TYPE

flat

prism

double pitch

single pitch

Mod.

M07-

2a_7

(EN)

C.M.

A. Sr

l - Co

rato

(BA)

- ITA

LY -

pag.

2/2 -

Ed.

1 Rev

. 0 de

l 14.0

3.201

6