04 TRANSPORTATION AND INFRASTRUCTURE E18 corridor …...The Nesbru crossing E18 Asker | Ill.: Lumion...

2
The Nesbru crossing E18 Asker | Ill.: Lumion | Multiconsult 04_TRANSPORTATION AND INFRASTRUCTURE E18 corridor in Asker Local authority subplan with impact assessment, E18 Slependen–Drengsrud Preparation of a local authority subplan with impact assessment for eight kilo- metres of four- to six-lane motorway and a new parallel/main collector road. Plans call for a separate bus lane and main cycle lane along the corridor. In associ- ation with the bus lane, a new bus terminal providing increased capacity is planned at Asker Station. The assignment also includes the northern part of the Røykenvei- en road and solutions for connecting the Slemmestadveien road. This is primarily an environmental project which will lay the basis for an improved transport system, with the focus on public transport and cycling along the corridor and with urban development around the public transport hubs. It will reduce barrier effects, noise and local pollution. KEY NUMBERS Eight kilometres of motorway with asso- ciated bus and main cycle lanes TIME PERIOD 2012 - 2014 CLIENT Norwegian Public Roads Administrati- on, eastern region PROJECT E18 corridor in Asker LOCATION Asker local authority PROJECT TYPE Local authority subplan with impact assessment

Transcript of 04 TRANSPORTATION AND INFRASTRUCTURE E18 corridor …...The Nesbru crossing E18 Asker | Ill.: Lumion...

Page 1: 04 TRANSPORTATION AND INFRASTRUCTURE E18 corridor …...The Nesbru crossing E18 Asker | Ill.: Lumion | Multiconsult 04_TRANSPORTATION AND INFRASTRUCTURE E18 corridor in Asker Local

The Nesbru crossing E18 Asker | Ill.: Lumion | Multiconsult

04_TRANSPORTATION AND INFRASTRUCTURE

E18 corridor in AskerLocal authority subplan with impact assessment, E18 Slependen–Drengsrud

Preparation of a local authority subplan with impact assessment for eight kilo-metres of four- to six-lane motorway and a new parallel/main collector road.

Plans call for a separate bus lane and main cycle lane along the corridor. In associ-ation with the bus lane, a new bus terminal providing increased capacity is planned at Asker Station. The assignment also includes the northern part of the Røykenvei-en road and solutions for connecting the Slemmestadveien road.

This is primarily an environmental project which will lay the basis for an improved transport system, with the focus on public transport and cycling along the corridor and with urban development around the public transport hubs. It will reduce barrier effects, noise and local pollution.

KEY NUMBERSEight kilometres of motorway with asso-ciated bus and main cycle lanes

TIME PERIOD2012 - 2014

CLIENTNorwegian Public Roads Administrati-on, eastern region

PROJECTE18 corridor in Asker

LOCATIONAsker local authority

PROJECT TYPELocal authority subplan with impact assessment

Page 2: 04 TRANSPORTATION AND INFRASTRUCTURE E18 corridor …...The Nesbru crossing E18 Asker | Ill.: Lumion | Multiconsult 04_TRANSPORTATION AND INFRASTRUCTURE E18 corridor in Asker Local

The Holmen crossing bird’s eye view | Ill .: Lumion | Multiconsult Top: Fragmentary illustration plan by Asker center and Fusdal | Illustration: MulticonsultButtom: Landscape Cut the profile 1640 | Illustration: Multiconsult

411-

HM

-00

2: 0

1_0

08,

rev.

26

.04.

2010

OUR SERVICES• Road design• Landscape plans, including cross-sections• 3D structural engineering• Soil surveys• Noise and air quality assessments• Cross-disciplinary 3D model, Infra-works and Lumion• Impact assessment• Local authority subplan with plan description• Technical/economic plan• Aimsun traffic model

DISCIPLINES• Highway engineering• Landscape• Structural engineering• Geotechnology • Rock engineering• Acoustics • Area plan• Traffic

SCOPE OF WORKInternal coordination meetings were held regu-larly with all technical disciplines.

Regular project meetings were held with the Norwegian Public Roads Administration and Asker local authority.

Involvement by and information to affected parties were secured through contact-group meetings.

Cross-disciplinary 3D design in the early phase.

www.multiconsultgroup.com