Why mobile? - Speech at Lindholmen Software Development Day 20141018
03 CostReport FSG Workshop Conti Hanover 20141018
-
Upload
formulastudent -
Category
Documents
-
view
219 -
download
0
Transcript of 03 CostReport FSG Workshop Conti Hanover 20141018
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
1/26
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
2/26
FSG Workshop 2014 - Cost Report
Agenda
Feedback Cost Report 2014
How to do the Cost Report
Changes for 2015
Questions
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
3/26
FSG Workshop 2014 - Cost Report
Agenda
Feedback Cost Report 2014
How to do the Cost Report
Changes for 2015
Questions
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
4/26
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
5/26
Feedback Cost Report 2014
Event Discussion / Judges
Rules Knowledge of the Judges
Most of the Judges seem to be deep in the topic and well prepared
A few Judges had problems (have not been prepared well enough)
We tried to get 3 Judges in each groupin a few groups we had less
Behavior of the Judes
We heard of some rude judgeswe are really sorry for that! Judges sho
constructive feedback and not blame mistakes
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
6/26
Feedback Cost Report 2014
Event Discussion / Judges
Differences between Judge Groups
We only see small differences between the different judge groups but we h
improvements
Feedback at the Event (or later)
Judges should have given you directly a long and detailed feedback at you
There has been no explicit feedback form (like at the Design event)
We have been available for feedback on request
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
7/26
Feedback Cost Report 2014
Overall Feedback Cost Report / Results
Most of the Teams understand that 100 Points from Cost Report ar
win the event
The overall cost report performance of the teams has increased
Small spread of points
0.15 Points difference between Place 1 and 2 (FSC)
Between Winner and 6th place only less then 2.5 Points (FSC)
Between Winner and 5th place only less then 3 Points (FSE)
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
8/26
FSG Workshop 2014 - Cost Report
Agenda
Feedback Cost Report 2014
How to do the Cost Report
Changes for 2015
Questions
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
9/26
How to do the Cost Report
Concept Phase and Construction Phase
You are evaluating/developing a concept for your new car
Target should be to have an overall concept for your car which incl
aspects (and not only design aspects)
e.g.: Resource Analysis, Priorities for your cost expenses
You have to be able to explain why you made each decision
Define 1-3 Cost Report responsibles/experts (to complete the repo
They are not responsible for making every part! Only for summariziation an
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
10/26
How to do the Cost Report
Construction Phase
Each designer of a part should directly collect all needed data for th
Material
Machining Concept and Process steps
How to connect the part to the vehicle (Fasteners)
Design-to-cost aspects should be concidered
Therefore => Have a Cost Report Kick-Off with the design team t
data they have to collect and how the cost report files work
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
11/26
How to do the Cost Report
Assembly Phase/ Testing Phase (before the Cost Report is finish
Designers of the car/parts
Each designer should check their parts and compare it to the drawing
Adjust your process/material/fasteners if you have deviations
If material is missing => Add Item Request
Cost Report Experts
collect all the data of the designer
Summarize/complete the report
Have a look at the assembly processes
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
12/26
How to do the Cost Report
Documents to Upload/Send to FSG
Add item request (what you need)
Invoice of the not listed part
All Data needed for the part
Send to FSAE or [email protected]
Material Unit Cost Unit Cost Type Supplier Team Price Table Price CategoryAttachm
entDateAdde
Continental Tyre 13" $100,00 unit MRSP Continental $125,00 Tyres yes 05-Ju
Supplier Contact Address City State Zip Country Phone Fax Em
Continental
Mrs. Bartusch
Jdekamp 30 Hannover Germany 30419 Germany 0049-123456jessica.b
@contin
mailto:[email protected]:[email protected]:[email protected] -
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
13/26
How to do the Cost Report
Testing Phase/ Pre-Event-Phase (after final report)
Cost Report Experts
Start a change log
Collect every change of parts/process/fasteners
Designers of the car/part
If you have to redesign a part => make a change log
All new parts which are needed have to be concidered in the Cost Report
If you have broken partscheck if the spare parts look the same as the or
changes logged, too)
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
14/26
How to do the Cost Report
Final Event preparation and Event Discussion
Cost Report Experts (Upload of Cost Addendum)
From your change log you generate the data needed for the changes on th
the FSG-Homepage for Cost Addendum
You have to fill in the information for every adjusted, new or removed part
Prepare explanations (details) for those changes like the normal print out wprocess, fasteners (and toolings)
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
15/26
How to do the Cost Report
Final Event preparation and Event Discussion
Cost Report Experts (Event discussion preparation)
Be an expert of your car
Have a min. of 1 better 2 copies of the printed Cost Report at the Event
Have an introduction for the Judges
Cost Report Experts (At the Cost Event)
Introduction of your car cost concept
Reconciliation to the questions of the Judges
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
16/26
How to do the Cost Report
Final Event preparation and Event Discussion
Real Case Szenario
Have the team involved for brainstorming and solving the Real Case
Show the Judges not only the result in numbers, but show your method
Try to think beyond the normal borders
Prepare your Flipchart slides (e.g. prints/concept)
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
17/26
How to do the Cost Report
Good vs. Bad Example of Real Case Slides
Hints for slide
Not only Text
Visualiziations would be
good
Round numbers on slide
Show methods and results
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
18/26
FSG Workshop 2014 - Cost Report
Agenda
Feedback Cost Report 2014
How to do a Cost Report
Changes for 2015
Questions
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
19/26
Changes for 2015
Upload of Documents
Cost Report
The Complete BOM and all tables in one Excel-File (no drawings needed)
We will have a Master-Document to download, to avoid several types of do
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
20/26
Changes for 2015
Upload of Documents
Cost Report Supporting Material
Should include drawings, pictures or screenshots and exploded-drawings
It helps the Judges to prepare for the event
Otherwise the Judges are not able to understand your process and your pa
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
21/26
Changes for 2015
Penalties for Uploads
There will be penalties if BOM (Excel File) and Cost Summary will
(with a few USD tolerance for rounding errors)
There will be penalties for late submission of the Cost Addendum
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
22/26
Changes for 2015
Handling/ Calculation of prices
FSE
Electric Motor
For calculation the average/permanent power the Design Report/Spec-Sheet values ar
FSE and FSC
Tooling for welding
Each clamping point has to be countedyou need a min. of two clamping points for a w
Monocoque
The weight of the Design Report/Spec-Sheet will be binding (incl. resin)
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
23/26
Changes for 2015
At the Event
We try to improve the preparation of the Judges
To have a more even knowledge
Better balancing of Judges
Better Judge briefing documents for better prepared judges
We try to get Judge Groups of 3 persons
One long term experienced Judge
Two short term experienced Judges
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
24/26
FSG Workshop 2014 - Cost Report
Agenda
Feedback Cost Report 2014
How to do a Cost Report
Changes for 2015
Questions
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
25/26
-
8/10/2019 03 CostReport FSG Workshop Conti Hanover 20141018
26/26