7/30/2019 02-29-2012 Presentation 104 Chris Ingram http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 1/28  NRW - its Role and Challenges in Moving Indian Cities towards a 24x7 Supply Manila, 29 th February 2012 Chris Ingram B.Eng, C.Eng, FICE, FCIWEM NRW Management Specialist & World Bank Consultant Bill Kingdom, World Bank Lead Water Supply and Sanitation Specialist and Dinesh Rathi: Principal  – DRA Consultants Pvt. Ltd., Nagpur, India

Transcript of 02-29-2012 Presentation 104 Chris Ingram

Page 1: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 1/28

 NRW - its Role and Challenges in Moving

Indian Cities towards a 24x7 Supply 

Manila, 29th February 2012

Chris Ingram B.Eng, C.Eng, FICE, FCIWEM

NRW Management Specialist & World Bank Consultant

Bill Kingdom, World Bank Lead Water Supply

and Sanitation Specialist

and Dinesh Rathi: Principal  – DRA Consultants Pvt. Ltd., Nagpur, India

Page 2: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 2/28

2

Population = 1,100 million. Predicted

to overtake China by 2050. Already50+ cities over 1 million.

Excess of water demand over supply

is a major problem in India.

Intermittent supply was generallydeemed to be the solution. This hasbeen practised nationally for ageneration or more!

No Indian City has 24x7 water supply!

Introduction

Page 3: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 3/28

3

Detrimental effects include:

Excess valve operation

Adverse health outcomes fromingress of polluted ground water

Reduced customer confidence

 Abandonment of metered supplies

replaced with flat rate tariffs.

Poor levels of service.

Limited the Utilities’ ability to justify tariff 

increases. 

Page 4: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 4/28

4

The Government of India’ s aspirations for

improved services.

World Bank undertook preliminaryassessments of performance in three typicalcities to guide the future preparation of Service Improvement Plans (SIPs) in projectcities with a view to supporting this via apossible Project.

Government of India’ s 11th Five-Year Plan

(2007-12) specifically refers to NRWreduction for the first time

Page 5: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 5/28

5

This paper provides1. Initial findings on the NRW situation in

three typical cities in India

2. Outlines the NRW managementactivities required as an integralelement of the project  “SIPs” .

3. Describes results from recent projectswith NRW elements in 24x7

4. Outlines future planned works and

Conclusions for the way forward

Page 6: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 6/28

6

Page 7: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 7/28

7

1. None of the 3 Utilities had aclear NRW Management Plan.

2. No staff had NRW training

3. No access to the resources and

equipment needed for introducing

NRW Management4. Other major constraints were

observed.

Page 8: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 8/28

8

Results of the Assessment

Water Balances made

using ULBs own figures Huge NRW > 65%

Incredible ILIs >1,000!!!

Page 9: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 9/28

Summary of findings:

High levels of physical losses (evenwith low pressures!)

Due to un-metering, how much of so-called “physical loss” is actual

wastage, and is therefore actuallycommercial?

How much is due to poorinfrastructure?

9

Page 10: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 10/28

Problem with Intermittent Supply

Difficult for:

ALC

Hydraulic modelling

Night flow measurements

Metering(=> inaccurate water balances)

So this presents a huge challenge!

How can we move forward????

10

Page 11: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 11/28

11

If we move to 24 hr supply from(say) 4 hour supply, leakagelevels will potentially increase(x6)!

But Wastage will certainlydecrease if meters are installed

The Scale of the Challenge to

move to 24x7 supply 

Page 12: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 12/28

12

So how can weprovide 24x7 supply

and reduce NRW atthe same time?

Page 13: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 13/28

13

Typically, in Bhubaneswar averagemonthly billed quantities = 43m3(even at 4hrs supply per day!)

This is more than sufficient for anaverage household size of 6persons.

(6 x 130 l.c.d. x 30 days = 23.4m3)

So enough water is usually available!

Page 14: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 14/28

14

Gradual acceptance

of metering so meter 

all SCs

Therefore reduced losses

(with more

uniform pressure)

Increase supply time

(Starting with small

Demo Zone /DMAs)

Therefore less

wastage

Carry out ALC.

Fix leaks.

Replace SCs

Losses increase  – But wastage decreases

more! 

Better (more uniform

24 hour) pressure profile

Make Hydraulic Model

and calibrate when ~ 50% iscovered

Expand Demo

Zones

Carry out essential

structural adjustments

of network

More ALC.

Fix More Leaks.

More DMAs

The NRW Cycle towards 24x7

Wastage & Leakage

decrease further 

Increase supply

still time further 

More ALC, More DMAs

Finally Reach 24x7

Supply Time

with acceptable NRW !! 

Page 15: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 15/28

15

NRW reduction will be a coreactivity to achieving the

objectives of the proposedproject

2 Phases – during SIP 1 

(pre-feasibility studyactivities) and SIP 2 

(feasibility study activities).

The Way Forward 

Page 16: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 16/28

16

(Pre FS level assessment)

Water Balance – assess NRW

componentsPrepare Pilot DMA designs

Hydraulic modelULB’s investment commitments

Management Model decision

SIP Stage 1 - Objectives 

Page 17: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 17/28

17

Feasibility Study Level: to deepenunderstanding of challenges => preparefirst tranche of large scale investments.

Prepare calibrated hydraulic model Set up the Pilot DMAs to accurately

quantify Water Balance & confirmintegrity via ZPTs

Leak detection and repair, together withmeter investigation and tracing illegalconnections should then proceed. 

SIP Stage 2 

Page 18: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 18/28

18

Clear indications will beavailable regarding the impactof a 24x7 supply and effects of 

constant pressure on thenotional leakage levels.

Continue to operate DMAs

Detailed assessments of all PilotDMAs will be made with robust

Water Balances being available.

SIP Stage 2 

Page 19: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 19/28

19

Clarify the causes of the physical andcommercial losses

Figures become available for Nos. of piperepairs and replacements, service connection

replacements and metering requirements etc. tobe included in the main project implementation.

In particular the necessity of reducingleakage levels without resorting to

wholesale pipe replacements will becarefully investigated.

Result of SIP2 => Develop strategy for NRW

reduction e.g. Roll out program  – where and when

to establish DMAs, approach to ALC, costs etc.

SIP Stage 2 (continued) 

Page 20: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 20/28

20

3 Recent Experiences 

Nagpur 

Karnataka 

Malkapur 

Page 21: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 21/28

21

Recent NRW reduction in KarnatakaState showed that when a 24x7 supplywas provided, together with meteredservice connections, overall consumptionlevels actually reduced. 

The effect of a 24x7 supply on potentialincreased leakage but offset by reduced

wastage therefore needs to be carefullyinvestigated and quantified.

Recent Experiences (1) 

Page 22: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 22/28

Results from Demo Zones in Karnataka

State

Parameter  Situationbefore 

Situation afterintervention 

Hours of supply  2 hours in 3-7

days 

24x7 

Volume of watersupplied to demo

zones in Mld 

22  18 (18% less) 

Water connection(180,000 people) 

many thru.433 public

fountains 

By 24,000 individualconnections 

Losses  More than50% 

7% 

Metering  Negligible ornone 

100% 

22

Page 23: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 23/28

23

NRW reduction in Nagpur, Maharashtra State.Pilot area of Dharampeth. (Demo Zone)

Objectives:

• Comprehensive study/ diagnosis of the system

• Rehabilitation of the distribution network

• Replacement of House Service Connections andcustomer metering

• Reduction in NRW using DMAs & standard methodology

Improvement in billing system & Service level toCustomers

• 24x7 water supply to 15,000 Customers

• O&M of the demo area for 5 years

Recent Experiences (2) 

Page 24: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 24/28

24

Rehabilitation works 95% completed

More than 65% customers already

receiving 24x7 supply

House to house service connections in

slum areas

NRW reduced from 50+% to 27% in Oct

2011

Improvement in the water quality andpressure

25-year O&M contract for full city

commenced from Ist Dec-2011 – To

implement Pilot experience

Recent Experiences (2)

Nagpur Results

Page 25: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 25/28

Recent Experiences (3) 

Malkapur, Karad City, Maharashtra

25

Parameter  Situation Before

Project 

Situation on

Completion 

Population served  40,000 @ 55 l.c.d.  67,000 @ 110 l.c.d. Hours Supply  ~6 hours every 2 days  24x7 

NRW  >40%  12% 

Customer Metering  N/A (Flat rate)  100% O&M Cost Recovery  36%  ~100% Revenue  -Rs 300 million/year  +Rs 40 million/ year 

Page 26: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 26/28

The Immediate Future3 Projects being Tendered by DJB in Delhi all on aPPP Basis

Malviya Nagar: 24x7

Mehrauli & Vasant Vihar Service Level

Improvements Nangloi: (Precise ToR TBA)

All have

Strong bid participation criteria

2 years construction +10 years O&M

approx. 40,000 connections

NRW reduction element with performance

bonus incentives (and penalties!)26

Page 27: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 27/28

Conclusions Current Indian approach to management of the

distribution network is unsustainable

NRW capacity and practices are very weak

NRW is critical to improving utility sustainability andproviding good service to customers

Pilots have demonstrated that significant improvementscan be made

Challenge now is to scale up – for which strong incentivesare needed to encourage improved performance of service

providers. These may be financial incentives or politicalpressure (from consumers) or both.

Such scale up will demonstrate new paradigm for sector

24x7 is definitely not a “pipe dream” – 

with integral NRW Management!27

Page 28: 02-29-2012 Presentation 104 Chris Ingram

7/30/2019 02-29-2012 Presentation 104 Chris Ingram

http://slidepdf.com/reader/full/02-29-2012-presentation-104-chris-ingram 28/28

28

Thank you for yourattention

[email protected]

[email protected]