DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. June 2011- 1 Paris Air Show F-35 Lightning II: The Centerpiece for 21 st Century Global Security Paris Air Show June 2011 Major General C. D. Moore Deputy Program Executive Officer Tom Burbage Executive Vice President, F-35 Program 

Transcript of 01 Par is Brief 062011 Final

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 1/18

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.June 2011- 1

Paris Air Show

F-35 Lightning II: The Centerpiece for 21st Century Global Security 

Paris Air Show June 2011

Major General C. D. Moore Deputy Program Executive Officer 

Tom Burbage Executive Vice President, F-35 Program 

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 2/18

2DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Lethal Survivable Supportable Interoperable

Meeting Service and International Needs

• The Next Generation “Family” of Strike Fighters

 – Three Variants

 – F-16/F/A-18C “Like” Aero Performance

 – Stealth Signature and Countermeasures

 – Advanced Integrated Avionics, Data Links and Adverse WeatherPrecision Targeting

 – Increased Range With Internal Fuel and Weapons

 – Highly Supportable, State of the Art Prognostics and Health

Management• Three U.S. Services, Eight Partners, One FMS Customer

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 3/18

3DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

• Key Attributes:

 – Stealth

 – Integrated Avionics

 – A/G Munitions

 – Intraflight DL

 – Adv A/C Survivability

• General Features:

 – Single seat – Speed: 750 kts or 1.6M

 – Ceiling: 50,000 ft+

 – Engine: PW F135

• Sensors

 – Fully integrated open architecture system

 – A/G – A/A radar/SAR

 – Electro Optical A/G Targeting system – A/A IRST

 – Electronic Support Measures (ESM)

 – Short range EO spherical coverage

F-35 Characteristics

Three Variants: Max Commonality And Interoperability

Length: 51.4 ftWing Area: 460 ft2

Weight (Empty): 29,036 lbInternal Fuel: 18,480 lbRange: 600 + nm

Length: 51.1 ftWing Area: 460 ft2

Weight (Empty): 32,161lbInternal Fuel: 14,003 lbRange: 500 + nm

Length: 51.4 ftWing Area: 668 ft2

Weight (Empty): 32,072 lbInternal Fuel: 20,085 lbRange: 600 + nm

CTOL(AF)

STOVL(BF)

CV(CF)

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 4/18

4DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Derivatives and EnhancementsJSF SDD

1990 20351995 2000 2005 2010 2015 2020 2025 2030

ASTOVL

MRF

AX

JASTJSFCDP

LRIP

Full Rate Production

Performance Based Global Sustainment

ATA

NATF

System Development and Demonstration

Low Rate Initial Production

JSF Acquisition Timeline

F-35 PRECURSOR PROGRAMS:

Advanced Short Takeoff Vertical LandingMulti-Role Fighter

Advanced Tactical Aircraft

Naval Advanced Tactical Fighter

Advanced Attack

Joint Advanced Strike Technology / ConceptDemonstration Phase

Eglin AFB ITC Operations

FMS

At Nexus of Planned Concurrency

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 5/18

5DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

2011 Progress

• Six Aircraft Delivered to Flight Test

• First Two Production Aircraft Delivered to Edwards

• Flew Most Flights on One Day in Program History (10) – May 25

• Passed 400 SDD Flights for 2011

• Passed 110 VLs for Program

• CTOL Passed 300 Flight Mark at EAFB

• AF-8/AF-9 First Flights, Delivery to Eglin Set for June

AF-6

BF-2/BF-3

BF-2

CF-2

CF-1

CF-3

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 6/18

6DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

2011 Flight Test Progress

0

100

200

300

400

500

600

700

800

9001000

   O  v  e  r  a   l   l   C  u  m  u   l  a   t   i  v  e   F   l   i  g   h   t  s

Planned Actuals

Data as of 31 May 2011

0

500

1000

1500

2000

2500

3000

3500

Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11

   O  v  e  r  a   l   l   C  u  m  u   l  a   t

   i  v  e   T  e  s   t   P  o   i  n   t  s

Planned Actual

Data as of 31 May 2011

• Flights

 – CTOL – 174

 – CV – 58

 – STOVL – 161

• Test Points

 – CTOL – 1,376

 – CV – 621

 – STOVL – 1,476

Flight Test Ahead of 2011 Plan

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 7/187DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

0

50

100

150

200

250

300

350

   S   T   O   V   L   C  u  m  u   l  a   t   i  v  e   F   l   i  g   h   t  s

Planned Actual

2011 STOVL Flight Test Update

Data as of 31 May 2011

0

200

400

600800

1000

1200

1400

1600

   S   T   O   V   L   C  u  m  u

   l  a   t   i  v  e   T  e  s   t

   P  o   i  n   t  s

Planned Actual

Data as of 31 May 2011

STOVL Ahead of 2011 Plan

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 8/188DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Vertical Landing and Short Takeoff Progress

BF-1

BF-4

BF-3

BF-2

0

20

40

60

80

100

120

   M  a  r  -   1   0

   A  p  r  -   1   0

   M  a  y  -   1   0

   J  u  n  -   1   0

   J  u   l  -   1   0

   A  u  g  -   1   0

   S  e  p  -   1   0

   O  c   t  -   1   0

   N  o  v  -   1   0

   D  e  c  -   1   0

   J  a  n  -   1   1

   F  e   b  -   1   1

   M  a  r  -   1   1

   A  p  r  -   1   1

   M  a  y  -   1   1

   V  e  r   t   i  c  a   l   L

  a  n   d   i  n  g  s

0

50

100

150

200

250

   M  a  r  -   1   0

   A  p  r  -   1   0

   M  a  y  -   1   0

   J  u  n  -   1   0

   J  u   l  -   1   0

   A  u  g  -   1   0

   S  e  p  -   1   0

   O  c   t  -   1   0

   N  o  v  -   1   0

   D  e  c  -   1   0

   J  a  n  -   1   1

   F  e   b  -   1   1

   M  a  r  -   1   1

   A  p  r  -   1   1

   M  a  y  -   1   1

   S   h  o  r   t   T  a   k  e  o   f   f  s

Data as of 31 May 2011 Data as of 31 May 2011

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 9/189DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Mission Systems

BF-4, BF-5

AF-6/AF-7/AF-8/AF-9

CF-3

AF-3/AF-4 at Edwards

All Flying Block 1 Software

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 10/1810DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Radar Cross-Section Testing

Early Results Very Promising

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 11/1811DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Training Preparation

• On Track to Field ~ 50 Aircraft by the End of CY12 – Expecting First F-35A Deliveries to Eglin AFB This Month

Academic Training Center F-35 Squad Ops/AMU Hangars

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 12/18June 2011-12

Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 13/18June 2011-13

Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Aircraft Production

Production Maintaining Schedule 

Airc ra f t in Ground Test and Fl ight Ops 

SDD (18 A/C)

LRIP 1 (2 A/C)

LRIP 2 (9 A/C) In Ground andFlight Test

Data as of 13 June 2011

Airc ra f t on Order  

LRIP 1 (2 A/C)

LRIP 2 (12 A/C)

LRIP 3 (17 A/C)

SDD (19 A/C)

In Assembly

LRIP 4 (32 A/C)

LRIP 5 (35 A/C)

Rolled Out

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 14/18DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.June 2011- 14Paris Air ShowDISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited © 2011 Lockheed Martin Aeronautics Company 

June 2011 - 14 Paris Air Show 

Electronic Mate and Alignment System

Capability To Produce 48 Jets per Year Begins 

June 2012 

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 15/18June 2011-15

Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

United Kingdom (138 CV)

United States (2,443)

Italy (69 CTOL

62 STOVL)

Netherlands (85)

Turkey (100)

Canada (65)

Australia (100)

Norway (48)

Denmark (30)

Spain South Korea Japan Singapore Israel 

F-35 Builds Coalition Interoperability

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 16/18DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.June 2011- 16Paris Air Show

FMSPartners

U.S.

Economies of Commonality and Scale Counters Current and Future Threats 

An Effective Coalition Lower Life-Cycle Costs 

Key Tenets

Global SecurityIndustrial Cooperation

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 17/18 © 2011 Lockheed Martin CorporationJune 2011-17

Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Questions 

 © 2011 Lockheed Martin Aeronautics CompanyJune 2011 - 17Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

8/6/2019 01 Par is Brief 062011 Final

http://slidepdf.com/reader/full/01-par-is-brief-062011-final 18/18

June 2011-18© 2011 L kh d M i A i C

June 2011 - 18