01 Par is Brief 062011 Final
Transcript of 01 Par is Brief 062011 Final
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 1/18
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.June 2011- 1
Paris Air Show
F-35 Lightning II: The Centerpiece for 21st Century Global Security
Paris Air Show June 2011
Major General C. D. Moore Deputy Program Executive Officer
Tom Burbage Executive Vice President, F-35 Program
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 2/18
2DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Lethal Survivable Supportable Interoperable
Meeting Service and International Needs
• The Next Generation “Family” of Strike Fighters
– Three Variants
– F-16/F/A-18C “Like” Aero Performance
– Stealth Signature and Countermeasures
– Advanced Integrated Avionics, Data Links and Adverse WeatherPrecision Targeting
– Increased Range With Internal Fuel and Weapons
– Highly Supportable, State of the Art Prognostics and Health
Management• Three U.S. Services, Eight Partners, One FMS Customer
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 3/18
3DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
• Key Attributes:
– Stealth
– Integrated Avionics
– A/G Munitions
– Intraflight DL
– Adv A/C Survivability
• General Features:
– Single seat – Speed: 750 kts or 1.6M
– Ceiling: 50,000 ft+
– Engine: PW F135
• Sensors
– Fully integrated open architecture system
– A/G – A/A radar/SAR
– Electro Optical A/G Targeting system – A/A IRST
– Electronic Support Measures (ESM)
– Short range EO spherical coverage
F-35 Characteristics
Three Variants: Max Commonality And Interoperability
Length: 51.4 ftWing Area: 460 ft2
Weight (Empty): 29,036 lbInternal Fuel: 18,480 lbRange: 600 + nm
Length: 51.1 ftWing Area: 460 ft2
Weight (Empty): 32,161lbInternal Fuel: 14,003 lbRange: 500 + nm
Length: 51.4 ftWing Area: 668 ft2
Weight (Empty): 32,072 lbInternal Fuel: 20,085 lbRange: 600 + nm
CTOL(AF)
STOVL(BF)
CV(CF)
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 4/18
4DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Derivatives and EnhancementsJSF SDD
1990 20351995 2000 2005 2010 2015 2020 2025 2030
ASTOVL
MRF
AX
JASTJSFCDP
LRIP
Full Rate Production
Performance Based Global Sustainment
ATA
NATF
System Development and Demonstration
Low Rate Initial Production
JSF Acquisition Timeline
F-35 PRECURSOR PROGRAMS:
Advanced Short Takeoff Vertical LandingMulti-Role Fighter
Advanced Tactical Aircraft
Naval Advanced Tactical Fighter
Advanced Attack
Joint Advanced Strike Technology / ConceptDemonstration Phase
Eglin AFB ITC Operations
FMS
At Nexus of Planned Concurrency
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 5/18
5DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
2011 Progress
• Six Aircraft Delivered to Flight Test
• First Two Production Aircraft Delivered to Edwards
• Flew Most Flights on One Day in Program History (10) – May 25
• Passed 400 SDD Flights for 2011
• Passed 110 VLs for Program
• CTOL Passed 300 Flight Mark at EAFB
• AF-8/AF-9 First Flights, Delivery to Eglin Set for June
AF-6
BF-2/BF-3
BF-2
CF-2
CF-1
CF-3
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 6/18
6DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
2011 Flight Test Progress
0
100
200
300
400
500
600
700
800
9001000
O v e r a l l C u m u l a t i v e F l i g h t s
Planned Actuals
Data as of 31 May 2011
0
500
1000
1500
2000
2500
3000
3500
Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11
O v e r a l l C u m u l a t
i v e T e s t P o i n t s
Planned Actual
Data as of 31 May 2011
• Flights
– CTOL – 174
– CV – 58
– STOVL – 161
• Test Points
– CTOL – 1,376
– CV – 621
– STOVL – 1,476
Flight Test Ahead of 2011 Plan
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 7/187DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
0
50
100
150
200
250
300
350
S T O V L C u m u l a t i v e F l i g h t s
Planned Actual
2011 STOVL Flight Test Update
Data as of 31 May 2011
0
200
400
600800
1000
1200
1400
1600
S T O V L C u m u
l a t i v e T e s t
P o i n t s
Planned Actual
Data as of 31 May 2011
STOVL Ahead of 2011 Plan
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 8/188DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Vertical Landing and Short Takeoff Progress
BF-1
BF-4
BF-3
BF-2
0
20
40
60
80
100
120
M a r - 1 0
A p r - 1 0
M a y - 1 0
J u n - 1 0
J u l - 1 0
A u g - 1 0
S e p - 1 0
O c t - 1 0
N o v - 1 0
D e c - 1 0
J a n - 1 1
F e b - 1 1
M a r - 1 1
A p r - 1 1
M a y - 1 1
V e r t i c a l L
a n d i n g s
0
50
100
150
200
250
M a r - 1 0
A p r - 1 0
M a y - 1 0
J u n - 1 0
J u l - 1 0
A u g - 1 0
S e p - 1 0
O c t - 1 0
N o v - 1 0
D e c - 1 0
J a n - 1 1
F e b - 1 1
M a r - 1 1
A p r - 1 1
M a y - 1 1
S h o r t T a k e o f f s
Data as of 31 May 2011 Data as of 31 May 2011
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 9/189DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Mission Systems
BF-4, BF-5
AF-6/AF-7/AF-8/AF-9
CF-3
AF-3/AF-4 at Edwards
All Flying Block 1 Software
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 10/1810DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Radar Cross-Section Testing
Early Results Very Promising
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 11/1811DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Training Preparation
• On Track to Field ~ 50 Aircraft by the End of CY12 – Expecting First F-35A Deliveries to Eglin AFB This Month
Academic Training Center F-35 Squad Ops/AMU Hangars
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 12/18June 2011-12
Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 13/18June 2011-13
Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Aircraft Production
Production Maintaining Schedule
Airc ra f t in Ground Test and Fl ight Ops
SDD (18 A/C)
LRIP 1 (2 A/C)
LRIP 2 (9 A/C) In Ground andFlight Test
Data as of 13 June 2011
Airc ra f t on Order
LRIP 1 (2 A/C)
LRIP 2 (12 A/C)
LRIP 3 (17 A/C)
SDD (19 A/C)
In Assembly
LRIP 4 (32 A/C)
LRIP 5 (35 A/C)
Rolled Out
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 14/18DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.June 2011- 14Paris Air ShowDISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited © 2011 Lockheed Martin Aeronautics Company
June 2011 - 14 Paris Air Show
Electronic Mate and Alignment System
Capability To Produce 48 Jets per Year Begins
June 2012
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 15/18June 2011-15
Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
United Kingdom (138 CV)
United States (2,443)
Italy (69 CTOL
62 STOVL)
Netherlands (85)
Turkey (100)
Canada (65)
Australia (100)
Norway (48)
Denmark (30)
Spain South Korea Japan Singapore Israel
F-35 Builds Coalition Interoperability
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 16/18DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.June 2011- 16Paris Air Show
FMSPartners
U.S.
Economies of Commonality and Scale Counters Current and Future Threats
An Effective Coalition Lower Life-Cycle Costs
Key Tenets
Global SecurityIndustrial Cooperation
8/6/2019 01 Par is Brief 062011 Final
http://slidepdf.com/reader/full/01-par-is-brief-062011-final 17/18 © 2011 Lockheed Martin CorporationJune 2011-17
Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Questions
© 2011 Lockheed Martin Aeronautics CompanyJune 2011 - 17Paris Air ShowDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.