PETROLEUM AND NATURAL GAS INDUSTRIES Design and Operation of Subsea Production Systems

General Requirements and Recommendations

IS013628-1 ‘

Author, Fit

Page 2: « v- ^ MASTER

DISCLAIMER

Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

Page 3: « v- ^ MASTER

Status NORSOK Subsea Standarderiso

=-Wrr/yly -===

■ NORSOK Subsea standarder ble revidert sommeren 1998.

■ Tre NORSOK standarder ble fjernet, da disse er dekket med ISO standarder. Felgende er trukket:- U-CR-003 Subsea Christmas tree system- U-CR-005 Subsea production control systems- U-CR-008 Subsea colour and marking

■ Gjenvaerende NORSOK subsea standarder er:- U-001, Subsea production systems (rev. 2, June 1998)- U002, Subsea structures and piping ( rev. 2, June 1998)- U-006, Subsea production and control umb. (rev. 2, June 1998)- U-007, Subsea intervention (rev. 2, June 1998)

Author, Filename, 05.03.99, 3

Page 4: « v- ^ MASTER

NORSOK erfaringer 1

■ NORSOK prosessen har apnet for at de forskjellige aktorene i industrien i storre grad kan bidra med losninger. Kommunikasjon for rett bruk ma bedres.

■ Funksjonskrav er mye arsaken til dette.■ Det er tydelig at Vi ma laere hvordan vi skal forholde

oss til funksjonskrav. .■ Definisjonsfase nodvendig for at partene skal vaere

omforent i forstaelsen av hva trengs og hva tilbys.■ Dette ma gjores tidlig slik at partene har de samme

mal i gjennomforingen.

Author, Filename, 05.03.99,1

Page 5: « v- ^ MASTER

NORSOK erfaringerISO

■ Manglende forstaelse av nytt standard / spesifikasjons regime har fort til forvirring og konservativ praktisering av funksjons kravene. ( 0ker kostnader)

■ NORSOK er mer spesifikasjoner enn standarder

■ Forbedringer kan oppnas ved tidlig valg av leverandor og avklaring av felles mal, spesielt viktig ved overlapp meilom tidligere prosjekt faser

■ Dokumentasjon vaere mer malrettet og enklereAuthor, Filename, 05.03.99, 2

Page 6: « v- ^ MASTER

NORSOK erfaringer 3

■ Samarbeidsformer tilpasset nye gjennomforings modeller- NORSOK har ofte blitt offer hvor uklare samarbeidsformer egentlig

er arsaken. Noen prosjekter far problemer andre ikke. Vi seker etter arsaker for a forklare problemer.

■ Ta ansvar! •■ Avklar usikkerheter tidlig! ( Prosjekt gjennomfering er

blant annet minimalisering av usikkerheter)■ Gjennomfor ryddig!

Author, Filename, 05.03.99, 3

Page 7: « v- ^ MASTER

ISO subsea standards program 2PETROLEUM AND NATURAL GAS INDUSTRIES

Design and Operation of Subsea Production Systems

Through Flowline System (TFL)

ISO 13628-3Draft Int Std Voting End 99-06-07

API RP 17C First Edition 1991

Subsea Control Umbilical ISO 13628-5

Includes Steel Tubing Umbilicais CD Comments Resolved Dis Voting Premio 99

API 17E&IE : Second Edition 1998 l: RP First Edition 1998

Accelerator

Hydraulic Jar

Pulling Tool

General Requirements and Recommendations ISO 13628-1 under Publication

1 API 17a -

Subsea Wellhead and Christmas Tree Equipment

ISO 13628-4International Standard 99-04-15

API-17D First Edition Sup. 2 1996

Flexible Pipe System ISO 13628-2

Draft International Standard Voting End 99-01-27 API SPEC 17J First Edition 1996

API SPEC 17K Bonded Flexible Pipe (under development)

Dok

umen

tasj

onas

001

-652

0

Page 8: « v- ^ MASTER

ISO subsea standards program--------------------------------------------------ISO

PETROLEUM AND NATURAL GAS INDUSTRIES Design and Operation of Subsea Production Systems

Workover/Completion Riser SystemISO 13628-7 CD 99-04-15

API 17GFirst Edition 1995

General Requirements and Recommendations ISO 13628-1

Remotely Operated Vehicle (ROV) Interface

ISO 13628-8 Com Draft 99-04

API 17H Awaits ISO

Dynamic Production Risers ISO 16389

WD 99-04-15 .API RP-2RD

Remotely Operated Tool (ROT) Intervention System

ISO 13628-9Final Draft IntStd 99-04-15

No Equivalent AP std.

E

Page 9: « v- ^ MASTER

ISO Process ISO

Vole hv TC

MemberBodies

c=>New IVoject

Accepted

FinalDraft

International Standard

CFPis)

<=>Draft

InternationalStandard

CZ>w

Page 10: « v- ^ MASTER

Roles and Responsibilities

Build ConsensusI

Consensus: General agreement, characterized by the absence of sustained opposition to substantial issues by any important part of the concerned interests and by a process that involves seeking to take into account the views of all parties concerned and to reconcile any conflicting arguments.

Note: Consensus need not imply unanimity.Section 3 - Page 131SO/TC 67 Training, 1996

Page 11: « v- ^ MASTER

Status ISO standarder for subsea 1 _________________________________ iso■ ISO 13628-1 General requirements and recommendation ligger til

trykking ( proj. leder: Wiliam Bakke / Hydro)

■ ISO 13628-2 Flexible pipe systems for subsea and marine appl. Stemt over som Draft Internasjonal Standard (DIS) Kommentarer er innarbeidet, sendes ut som FDIS, 2Q 1999

( proj. leder Sijm Last / Shell)

■ ISO 13628-3 Through flowline ( TFL ) systems ute for DIS avstemning ( 199-06-07 ) ( proj. leder John Yonker / Halliburton)

■ ISO 13628-4 Subsea wellhead and tree equipment. Ligger til trykking ( proj. leder Dave Garnham / Cameron )

ftAuthor, Filename, 05.03.99, 4

Page 12: « v- ^ MASTER

Status ISO standarder for subsea 2

■ ISO 13628-5 Control Umbilicals, CD kommentarer blir innarbeidet og sendes ut som DIS, 2Q 1999 (proj. leder Fred Brink / Shell

■ ISO 13628-6 Subsea production control systemsSendes for FDIS, 20 1999 .( proj. leder J.H. Neuenkirchen / Statoil)

■ ISO 13628-7 Workover / completion riser systems WD March 1999 ( Proj. leder A. Muff / KOS )

Author, Filename, 05.03.99, 5

Page 13: « v- ^ MASTER

Status ISO standarder for subsea 3

■ ISO 13628-8 Remotely Operated Vehicles ( ROV ) interfaces on Subsea production systems sendes for CD, 20 1999 ( proj. leder Tim Marsh / Shell)

■ ISO 13628-9 Remotely Operated Tools ( ROT) intervention systems sendes for FDIS, 20 1999 ( proj. leder J. Bruun-Olsen / Statoil)

■ ISO 16389 Dynamic production risers WD, 02/99 ( proj. ledere B. Leira / SINTEF )

Author, Filename, 05.03.99, 6

Page 14: « v- ^ MASTER

Erfaringer fra ISO prosessen 1

■ Norsk mate er fordyrende pa folgende omrader- For omfattende dokumentasjonskrav- Vi er ikke dyktige til a utfordre “dyre / konservative” losninger- Material vaig- Forskjellige krav fra Sjofartsdirektoratet og oljedirektoratet- Spesielle Norske krav praktiseres for mobile “enheter”

■ Gi bed re forstaelse av ISO prosessen, for eksempel nar er et dokument offentlig tilgjengelig?

Author, Filename, 05.03.99, 7

Page 15: « v- ^ MASTER

Erfaringer fra ISO prosessen 2

■ ISO prosessen er tung og for langsom!

■ Vi ma gi industrien bed re forstaelse av ISO prosessen og standardene ( “Nytt” format)- Dokumentene inneholder

» Krav ( Requirements ) (shall) .» Anbefalinger ( Recommendations ) (should)» Ren Informasjon ( Tutorial information)

- Dette er som API spesifikasjonene ( Ref. colour coding of doc’s )

Author, Filename. 05.03.99, 8

Page 16: « v- ^ MASTER

Erfaringer fra ISO prosessen 3 ------------------------------------------------------ iso■ Hvordan skal OD regler / veiledninger og

Spesifikasjoner / Standarder spille sammen?

■ Det rader forvirring i oyeblikket!- NORSOK refereres til for mobile enheter. Ikke intensjonen nar de ble

laget. Hvordan skiller vi det maritime og apdre krav?

■ Norsk industri star overfor utfordringer i forbindelse med globalisering av industrien. Ett svar er globale standarder

Author, Filename, 05.03.99, 9