- NASDA Agency Report -

Osamu OchiaiNASDA/EORC

CEOS/WGISS SGs@ESRINMay 7-10, 2002

Page 2: - NASDA Agency Report - Osamu Ochiai NASDA/EORC CEOS/WGISS SGs@ESRIN May 7-10, 2002.

Future NASDA….

MEXT decided to unify 3 Japanese Space organizations NASDA, NAL(National Aerospace Laboratory in Japan), and ISAS(Institute of Space and Astronautically Science) to one agency in next few years based on administrative reform ordered by Prime Minister Koizumi.

New Japanese Space Agency will start at Jan. 2004 (TBS).

Page 3: - NASDA Agency Report - Osamu Ochiai NASDA/EORC CEOS/WGISS SGs@ESRIN May 7-10, 2002.

MOS, JERS, ADEOS: no operationTRMM: operationAqua (US satellite) /AMSR-E: Successfully launched May 4th 2002 (run up phase)ADEOS-II: launch Nov. 2002ALOS: launch June 2004GCOM-A1/B1: under studyGPM: under studyEarthCARE: under study

Access point : eos.nasda.go.jp

NASDA’s EO satellite schedule

Page 4: - NASDA Agency Report - Osamu Ochiai NASDA/EORC CEOS/WGISS SGs@ESRIN May 7-10, 2002.

DRTS-W (Data Relay Test Satellite – West): launch Aug. 2002IGS (Information Gathering Satellite) : launch two satellites during 2003 (radar and optical satellite)MTSAT: launch 2003/BWEOS (Whale Ecology Observation Satellite System): launch Nov. 2002ETS-VIII (Engineering Test Satellite-VIII ): launch 2004WINDS (Wideband InterNetworking engineering test and Demonstration Satellite): launch 2005

Other related satellite schedule

Page 5: - NASDA Agency Report - Osamu Ochiai NASDA/EORC CEOS/WGISS SGs@ESRIN May 7-10, 2002.

EO Activity status –Ground System-ADEOS-II and Aqua/AMSR-E ground system are ready for operation.

Now in training and initial operation preparationGLI250km, AMSR/AMSR-E, SeaWinds, DCS near real time I/F with NASA/NOAAPOLDER and DCS I/F with CNESILAS-2 I/F with MOENASA-NASDA Catalogue Interoperability Operation for ADEOS-II and AMSR-E

ALOS ground system is now manufacturing phase.Complex observation and acquisition and those requirementsHuge data volume (1TB/day) archiving and distributionALOS Data Node (CNES/ESA, NOAA/ASF, Geoscience Australia) concept/implementation are now discussingNode Interoperability (Level0 data and Catalogue I/F) is investigating.

Page 6: - NASDA Agency Report - Osamu Ochiai NASDA/EORC CEOS/WGISS SGs@ESRIN May 7-10, 2002.

EO Activity status –R&D-CIP status

Need to investigating how to implement (CIP/ODBC, CIP-IMS translator etc)

Satellite data Web Map Client and WMS prototype (JERS-1/SAR, ADEOS/AVNIR: High resolution data)

http://www.en.nas.co.jp/wms/index.php (Japanese only…)New data service investigation in 2002

ISO/TC211, OGC more deep considerationData MiningCluster ProcessingNetwork QoS

Page 7: - NASDA Agency Report - Osamu Ochiai NASDA/EORC CEOS/WGISS SGs@ESRIN May 7-10, 2002.

EO Activity status –R&D-WTF in 2002

CEOP• Frequently communication with CEOP/Tokyo Univ.• Need to organizing project plan and start implementation.

Ocean• Communication with Tohoku Univ.• Need to more discussion.

GOFC• NASDA-MAFF joint activity for Forest Monitoring Testbed.• Plan to enhance Web Mapping Client, WMS and WFS.• Outside Demo in Nov. Plenary demo??

Digital AsiaStudy for project organizing with AIT (leader), Chiba Univ. and Keio Univ.Promoting GIS system in Asia

Page 8: - NASDA Agency Report - Osamu Ochiai NASDA/EORC CEOS/WGISS SGs@ESRIN May 7-10, 2002.

Others

More ISO 9001/14001 enhanced in EO area.Security (both data and network) policy is very strict to access/open NASDA’s information.