ALMagd C-86-C Drilling Program v1
مشروع التخرج Underbalanced Drilling - Copy
13.375 Inter I - 68 ppf
SOP 829-004 Raise the Floor and Pin.
SOP 829-014 Remove the v-Door.
SOP 829-019 Rig Out the Mud Tanks and Pumps.
SOP 829-015 Nipple Down BOPs
9.625 Inter-Prod 53.5 Ppf
SOP 829- 032 Check-Reset KEMS, Crownomatic
Any Year Calendar1
Condensate Loading Cargos From CTP and RPF
06 Wellhead Xmas Tree [Compatibility Mode
Recomended Modification of DCS Screens
PD 2016-2017 PROD BUDGET OPERATING.xlsx
اسماء العاملين بادارة الانتاج
Water Content
WORK SCHEDULE DURING30.xlsx
Readme
jinuary schedual
Cover Letter