2_25 Comparision of Materials
Condenser Tube Cleaning Using Bullet Shot Method
High Thrust Bearing Temp. in TDBFP-APR10
HP Bypass Warm Up Lines Re Engineering to Prevent Condensate Accumulation,97-98
ATT Resetting Solenoid Problem , 210 MW, 97-98
Problem Faced in Turbine Governing System During Commissioning of TDBFP
CC Pump Cavity Temperature High
Delay in Opening of LP Bypass Valve
Failure of 11 kV Motor Terminal at MDBFP
LPBP Control Valve 1-LPBP Govern Sys
Self nomination MIE EXPERT
Presentation on the theme Child Labour-Kamla Nehru Public School, Phagwara
Presentation on child labour- Kamla Nehru Publci School, Phagwara
Child Labour Presentation-Kamla Nehru Public School, Phagwara
Low Vacuum in Condenser
Low Vacuum
LP by Pass System - Unit 2, 500 Mw, Commissioning Problems, 02-03
Poor Vacuum During Initial Commissioning
Tripping Cooling Water Pump in Overload at 50Hz
Vacuum System Improvement