Post on 25-Jun-2020
Organised byT | 61 2 9247 6000 F | 61 2 9247 6333 W | akolade.com.au
EXPERT SPEAKERS INCLUDE:
EARLY
BIRD OFFER
SAVE $550
Greg Wright, Procurement Development andImplementation, Infrastructure Procurement Solutions
Caroline James, Principal Advisor-Risk Support,Rio Tinto
KEY BENEFITS OF ATTENDING
• Underpinsuccessfullife-cycleprojectmanagementby developingsupportableriskandcontrolframeworks
• Mitigateriskthrougheffectiveplanningstrategies
• Developin-depthknowledgeofeffectiverisk managementsystems
• Gainprovenstrategiesforsuccessfulprojectdelivery
• Understandthetruefinancialcostsoftimedelay
• Learneffectivecommunicationtechniquestoreducerisk
13 new exclusive case studies
Hear what our past attendees have to say:
Took several pages of notes-interesting and informative
Good interaction between presenters and attendees
• BruceColman,Project Manager, NSW Department of Planning and Infrastructure
• JamesRobertson,Project Manager, Alstom Power
• GarretO’Connor,Project Director, M2 Upgrade, Transurban
• DenisHamel,Executive General Manager Projects, QCC Resources (part of Downer Australia Group)
• RichardMueller,Project and Engineering Manager, Veolia Water Australia
• BillMountakis,Commercial and Risk Manager, Jemena
• AndrewBondini,Project Director, Boral Property Group
• PaulCampbell,President, AIPM NSW Chapter and Director of AIPM, Australian Institute of Project Management
• ClaudeLeComte,AASIMS Project Scheduler, KBR
• SonyaCampbell,Manager, Project Procurement, Abigroup Asset Developments
• ScottNey,Principal Engineer, Senior Project Manager-Transport Group, Parsons Brinckerhoff
• StephenSanlorenzo,General Manager Operations, Executive Project Director, APP Corporation Pty Limited
• DanielLingwood,Senior Project Manager, Aurora Projects Pty Ltd
• KarenWenham,Associate Director, Tracey Brunstrom & Hammond Group
• JonathanStafford,Special Counsel- Construction and Major Projects Group, Clayton Utz
• ProfRashdaRana,Barrister, Ground Floor Wentworth Chambers, Sydney & Atkin Chambers, London
• AndrewGraham,Managing Director, EPM Projects Pty Ltd
• PatrickWeaver,Director, Mosaic Project Services Pty Ltd
• TonyPaul,Principal, PicoNet Consulting
ProjectManagement forMajorProjects Symposium
30 July - 01 August 2012 Sir Stamford, Circular Quay SYDNEY
Optimising project delivery through risk assessment and proven frameworks for major projects
PROJECTMANAGEMENTFORMAJORPROJECTSSYMPOSIUM
2 T | 61 2 9247 6000 F |61292476333 E|info@akolade.com.au W| akolade.com.au
mitigate risk in your projects
• Exploringdifferentmeasurementtechniquestoincreaseproject performance
• Developingkeyperformancemeasuresofhowprojectriskis being managed
Andrew Bondini, Project Director, Boral Property Group SonyaCampbell,Manager, Project Procurement, Abigroup Asset Developments Scott Ney, Principal Engineer, Senior Project Manager - Transport Group, Parsons Brinckerhoff
14:40 AfternoonTea
EFFECTIVELYUTILISINGRESOURCESTOMAXIMISEPRODUCTIVITY
15:10 CASE STUDY Addressing optimum productivity through project resourcing
• Allocatingprojectrisktoappropriateresources
• Ensuringthehighestqualityworkandcommitmentthroughout the project
• Examiningtheavailabilityofcompetentpeopletoworkon projects to minimise risk
• Deliveringtherightscopeattherighttimetomeetbusiness priorities
• Linkingriskinvolvementofaprojecttoclearactionand accountability
GarretO’Connor,Project Director, M2 Upgrade, Transurban
15:50 CASE STUDY Effectivelymanagingprojectstoavoiddelays
• Identifyingthecausesofdelaysinprojects
• Highlightingstrategiestobettermanageprojectstoprevent long delays
• Takingadvantageoflimitedresourcestomaximiseresults
• Addressingtherisksatthebeginningoftheprojectandmanaging them throughout the project
• Howtoidentifycomponentsinprojectsthatrequirelongleadtimes
Karen Wenham, Associate Director, Tracey Brunstrom & Hammond Group
16:45 ClosingremarksfromtheChairandconferenceadjourns
DAY TWO: TUESDAY 31st JULY 2012
9:00 OpeningremarksfromtheChair
PaulCampbell,President, AIPM NSW Chapter and Director of AIPM, Australian Institute of Project Management (AIPM)
ANALYSINGEFFECTIVECOMMUNICATIONSTRATEGIESFOR SUCCESSFUL PROJECT DELIVERY
9:10 CASE STUDY Understandingthesignificanceofcommunicationinproject planningtoavoidmajorprojectfailure
• Establishingtheprojectschedule(backtofrontapproach)
• Materialrequirementslinkingthescheduleandthedifferent functions
• Examiningtheleadingindicators
• Understandingclearcommunicationandreporting
Denis Hamel, Executive General Manager Projects, QCC Resources (part of Downer Australia Group)
9:50 CASE STUDY Strategiestoimprovecommunicationbetweenkeypersonnel andstakeholders
• Balancingcommunicationandengagementbetweenparties involved in the project
• Identifyingclearprojectscheduleswithstakeholderstocomplete the project on time and budget
• Obtainingeffectivefeedbacktoensureproductivetwoway communication
DAYONE:MONDAY30th JULY 20128:00 Registration Opens
9:00 OpeningremarksfromtheChair
PaulCampbell,President, AIPM NSW Chapter and Director of AIPM , Australian Institute of Project Management (AIPM)
REVIEWINGIMPLEMENTATIONSTRATEGIESTOMITIGATERISK
9:10 CASE STUDY Implementingeffectiveriskanalysisthroughoutyourproject lifecycle
• Understandingriskgovernancethroughaprojectlifecycle
• Effectivelyreportingriskoutcomestoexecutivelevels
• Implementingsystemsforprojectsdeployments
• Monitoringriskanalysisandevaluationinprojectslifecycle
RichardMueller,Project and Engineering Manager, Veolia Water Australia
9:50 CASE STUDY Reviewingriskmanagementsystemswithinyourprojects
• Identifyingkeyriskconcernsinaproject;safety,quality,and environmental
• Consideringmitigationmeasurestopreventriskreoccurring
• Evaluatingcontrolmeasuresandminimisingriskforlongtermsuccess
• Addressingoutstandingrisktoavoidprojectfailure
SonyaCampbell,Manager, Project Procurement, Abigroup Asset Developments
10:30 MorningTea
EFFECTIVELYINCREASEPROJECTCONTROLUSINGRISKMANAGEMENTTECHNIQUES
11:00 CASE STUDY Managingandimplementingprojectriskmanagementtools
• Usingeffectiveriskmatrixtoolstoassistwithmanagingprojects
• Understandingtheimpactofemergingrisksandthebestmitigation strategies
• Effectivelyincorporatingriskmanagementtoolstoincreaseproject performance
Daniel Lingwood, Senior Project Manager, Aurora Projects Pty Ltd
11:40 CASE STUDY Aligningariskmanagementframeworkinyourproject
• Tailoringyourcompany’sriskpolicy,culture,procedures,methodology and tools
• Relationshipbetweenprojectorganisationstructureandrisk accountability
• Settingupefficientinterfacesbetweentheriskfunctionandproject controls
BillMountakis,Commercial and Risk Manager, Jemena
12:20 NetworkingLuncheon
13:20 CASE STUDY OptimisingprojectperformanceusingEarnedValuePerformance Management(EVPM)
• UnderstandingthebasicconceptsofEVM
• FamiliarisingwiththeacronymsandterminologyofEVM
• Understandingtheorigin/derivationofatime-phasedPMB
• Beabletocorrectlyapply/produce/interpretgraphicalandtabular performancemeasurementreportssuchastheCost/Schedule Status Report (CSSR)
• ProducingacalculatedLatestRevisedEstimate(LRE)orEstimate-at- Completion (EAC)
Claude LeComte, Project Scheduler, AASIMS, Rolls-Royce/Kellogg Brown Root
14:00 PANEL DISCUSSION Measuringprojectriskperformance
• Examiningdifferentstrategiestoimplementriskmanagementto
3T | 61 2 9247 6000 F |61292476333 E|info@akolade.com.au W| akolade.com.au
30 July - 01 August 2012 Sir Stamford, Circular Quay SYDNEY
• Analysingtheprogressoftheprojecttomitigatescheduledelays and optimise project completion
JamesRobertson,Project Manager, Alstom Power
10:30 MorningTea
IMPLEMENTINGPROVENFRAMEWORKSTOIMPROVELONGTERM PROFITABILITY
11:00 CASE STUDY Strategiestoovercomebarrierstocompletiononmajorprojects
• Examiningcauseandeffect
• Overcomingbarriers–type&implications
• Discussingkeyelementsoftheprojectlifecycle
• Discussingtheimportanceofriskallocation&commercialresponses
• Analysingsuccessfulprojectplanning
• Understandingthesignificanceofprocurement
• Identifyingflexibilitystrategiestocompletemajorprojects
• Understandtheimportanceofthepartnersrole
• Examiningpracticaldisputeresolutions
StephenSanlorenzo,General Manager Operations, Executive Project Director, APP Corporation Pty Limited
11:40 CASE STUDY Establishingandeffectivelymanagingresourcestoincrease productivity
• Majorprojectsandresourcingfromaclient’sperspective
• Establishingandunderstandingrequirementswithinmajorprojects
• Aligningandunderstandingthevalueofprojectrequirements
• Blendingandpreparingtheplanningandplottingrequirementsto maximiseproductivity
Andrew Bondini, Project Director, Boral Property Group
12:20 NetworkingLuncheon
13:20 CASE STUDY Examininglargescaleurbandevelopmentprojects
• Projectmanaginglargescalerezoningsformajorurbandevelopment
• Managingthetechnicalandregulatoryprocesses
• Findingthebalancebetweennewresidentialandemploymentuses and conservation outcomes
• Engagingwithandmanagingstakeholderexpectations
• Matchingurbaninfrastructuredeliverywithnewurbandevelopment
Bruce Colman, Project Manager, NSW Department of Planning and Infrastructure
MANAGINGCONTRACTUALRISKINPROJECTS
14:00 Managingrisksinconstructioncontracts
• Examiningwarrantiestomanageriskinconstructioncontracts
• Draftingandnegotiatingtechniquestoenforceindemnities
• Discussingthebestclausetolimitcontractualrisk:limitationson liability
JonathanStafford,Special Counsel- Construction and Major Projects Group, Clayton Utz
14:40 AfternoonTea
15:10 Examiningthemethodsforsuccessfulprojectdelivery
• Reviewingprojectdeliverymethods
• Examiningtheadvantagesanddisadvantages
• Identifyingthepreferredmethodinthecircumstances
• Matterstoconsiderinadministeringeachmethods
Andrew Graham, Managing Director, EPM Projects Pty Ltd
15:50 Reducingtheriskofbreachofcontractualagreementsinproject delivery
• Examiningthereasonswhycontractsarebreachedandhowto prevent them
• Determiningactionstotakewhenyouarefacedwithabreach of contract
• Analysingtheprocessandproceduresundertakenforrecovery of loss and damage
ProfRashdaRana,Barrister, Ground Floor Wentworth Chambers, Sydney & Atkin Chambers, London
16:30 Concludingremarksfromthechairandendofconference
POST-CONFERENCE WORKSHOPS:WEDNESDAY 01st AUGUST 2012WorkshopA9:00–12:30 How to use project scheduling to drive project success
In this intensive workshop participants will learn about the key elements involved in effectively managing time on major projects. Understanding howyourschedulingtoolsworkisonlyhalfthebattle–thisworkshopwillfocus on using your tools to proactively manage time to achieve success! Five years of research by the CIOB is leading a paradigm shift in the way projectsaremanagedwithinnovativetechniquesandnewformsofcontract focused on the proactive and realistic achievement of scheduled deadlines! The presenter is heavily involved in this on-going work by the CIOB;thisworkshopwillbethefirsttimethefullpackageofinnovationsispresented as an integrated solution in Australia.
Theworkshopwillcover:
• Projectscheduling–whatworks,whatdoesnot
• Thedifferencebetweenplanning&scheduling,theimportance of both processes
• Scheduledensity–theartofkeepingtheschedulerealisticand achievable
• Anintroductiontothe‘Guide to the Management of Time in Complex Projects’
• AnintroductiontothenewCIOBformofcontractforprojects
• Asuggestedframeworkforsuccessfullymanagingtimeonyour projects
PatrickWeaver,Director, Mosaic Project Services Pty Ltd
WorkshopB1:30–5:00How to manage multiple projects
This intensive workshop will deliver to participants implementation strategies to best manage multiple projects and achieve project success. Participants will gain in-depth knowledge and easy learning tools to develop and implement frameworks by using program management.
• Implementingprojectschedulestoensuresmoothrunningof project activities
• Ensuringmanagementofprojectsareofqualityandmeets budget constraints
• Allocatingrisksbyreferencetoprojectobjectives
• Usingriskmanagementtoolstodrivesuccessfulprojects
• Learninghowtodevelopandimplementframeworksto prevent project failure
Tony Paul, Principal, PicoNet Consulting
Morningteaandafternoonteawillbeprovided. Lunchisprovidedfordelegatesattendingboth workshopsonly.
WHO SHOULD ATTEND:
• ProjectManagers• ProjectEngineers• RiskManagers• CommercialManagers
• ProjectSchedulers• ContractManagers• GeneralManager
4
VIPCODE PROJECTMANAGEMENTFORMAJORPROJECTSSYMPOSIUM
PRO05REGISTRATIONFORM
1: EARLYBIRDDISCOUNT. Register and pay by a deadline indicated above to achieve up to 20% SAVINGS onthe Standard Rate. Registrations received without payment are ineligible for an Early Bird Discount and will be charged at the Standard Rate.
2: TEAMDISCOUNT. ( i ) Register 3 delegates and receive a $1000 DISCOUNT off the Standard Price ( ii ) Register 4 delegates and receive the 5th ticket FREE off the Standard Price
All group registrations must be from the same company, at the same time and for the same event. Registrants must choose between the most advantageous discount option. Only one discount is available at the time a registration is made.
Phone: 61 2 9247 6000
5 EASY WAYS TO REGISTER
SAVE! Choosebetween:
Fax: 61 2 9247 6333
Email: registration@akolade.com.au
Online:www.akolade.com.au
Mail: Akolade Pty Ltd Unit 9, Level 2, 58 Pitt Street SYDNEY, NSW 2000, Australia
DATES & VENUE (Please tick)
CANCELLATION POLICY:Shouldyoubeunabletoattend,asubstitutedelegate isalwayswelcomeatnoextracharge.Alternativelya full refund, less a $200 service charge (including GST), will be made for cancellations received in writing up to 15 working days prior to the event. Regrettably no refunds can be made less than 15 working days prior to the event.
IMPORTANTNOTE: Attendance will only be permitted upon receipts of full payments. Please note that programme and speakers are subject to change without notice. Akolade will not be responsible for any event re-scheduled or cancelled.
Name
Job Title
Phone Email
Name
Job Title
Phone Email
Name
Job Title
Phone Email
DELEGATE DETAILS (Please complete in block letters) Today’sdate
Company
Postal Address POBox/StreetAddress
City
Delegate 1
Delegate 2
Delegate 3
State Postcode
EASYPAYMENTOPTIONS ABN96149066991 EFT:TransferyourpaymentstoAkoladePtyLimitedat CommonwealthBankofAustraliaBSB062099AccountNo.10685915.PleasequotePRO05ontheEFT.
CHEQUE:PleasemakeoutchequetoAkoladePtyLimited. PleasequotePRO05onthecheque.
CREDITCARD:Pleasechargemy VISA *DINERS MASTERCARD *AMEX
*Acreditcardfeeof2.5%willapplyforDinersorAmex
in the amount of $______________________
CardNo: ExpiryDate:
Cardholder’sName: Signature:
Akoladeconducts in-depthresearchand puts together leading edgeconferences, professional training,workshop and large scale eventsaddressingtheOilandGas,Mining,Infrastructure, Transport & Logistics,Law, Finance, IT&T, Healthcare, PharmaceuticalandPropertysector.
REGISTRATION FEE (includingGST)
EARLY BIRD DISCOUNTSRegisterandbookbefore:
04May2012 18May2012 01 June 2012 15June2012 06 July 2012
$2308.90
$2968.90
$3298.90
Conferenceonly
Conferenceplus1workshopor
Conferenceplus2workshops
$2418.90
$3078.90
$3408.90
$2528.90
$3188.90
$3518.90
$2638.90
$3298.90
$3628.90
$2748.90
$3408.90
$3738.90
$2858.90
$3518.90
$3848.90
STANDARDPRICE
A B
SYDNEY30 July - 01 August 2012Sir Stamford, Circular Quay 93MacquarieSt SYDNEY 2000Ph: +61 2 9252 4600
T | 61 2 9247 6000 F |61292476333 E|info@akolade.com.au W| akolade.com.au
E SK 1