Wheatstone Project Update:

November 1, 2013

© 2013 Chevron Corporation. All rights reserved.

Micro-tunnel Boring

In August, boring of the .75-mile (1.2-km) micro-tunnel began at the shore crossing. Micro-tunnelling is being used to bring the 44-inch trunk line ashore.

Site Offices and Support Facilities

Micro-tunnel Launch PitBeach

Jacking Pipes (Tunnel Liners)

2

© 2013 Chevron Corporation. All rights reserved.

Micro-tunnel Boring

Inside the micro-tunnel launch pit, workers complete a push of the concrete jacking pipes. More than 400 pipes are pushed together to provide a conduit to pull the trunk line.

3

© 2013 Chevron Corporation. All rights reserved.

LNG Plant Site

4

Construction works at the LNG plant site are progressing, with key areas now taking shape.

© 2013 Chevron Corporation. All rights reserved.

LNG Plant Site

At the LNG plant site, fill is being brought from nearby borrow pits to raise the site level and piling is underway for the foundations of LNG Train 1.

Beach

LNG Tanks Area

LNG Train Area

Main Plant Site Access

RoadCondensate Tanks Area

Fill Borrow Pit #2

5

© 2013 Chevron Corporation. All rights reserved.

LNG Tank Pad

Piling works for the foundations of the two LNG storage tanks is underway.

LNG Storage

Tank Piles

6

© 2013 Chevron Corporation. All rights reserved.

LNG Plant Site Foundations

Piling for the foundations of LNG Train 1 nears completion as construction of the refrigeration compressor foundation commences. More than 4,000 piles have been installed on site to date.

Refrigeration Compressor Foundation

7

© 2013 Chevron Corporation. All rights reserved.

LNG Plant Site Marine Facilities

At the Material Offloading Facility (MOF), the east quay piling platform and rock works for the temporary jetty are both complete.

Eastern MOF Quay

MOF Support Facilities Area

Southern MOF Quay

8

© 2013 Chevron Corporation. All rights reserved.

LNG Plant Site Marine Facilities

Installation of the abutment wall for the Product Loading Facility (PLF) is underway. The wall will anchor the shore end of the PLF.

9

© 2013 Chevron Corporation. All rights reserved.

Platform Construction

At the DSME shipyard in Okpo, Korea, the intermediate deck is now fully installed and erection of the top deck has commenced.

10

© 2013 Chevron Corporation. All rights reserved.

Platform Construction

At the DSME shipyard in Okpo, Korea, erection of the steel gravity structure (SGS) pontoon and node blocks is nearing completion.

11

© 2013 Chevron Corporation. All rights reserved.

Platform Construction

12

© 2013 Chevron Corporation. All rights reserved.

Construction Workforce Accommodation Facilities

With the first phases complete, more than 3,000 workers are now housed onsite.

13

© 2013 Chevron Corporation. All rights reserved.

Construction Workforce Accommodation Facilities

At the Construction Village, the new kitchen and western diner facilities are operating, while the eastern diner nears completion.

Kitchen and Diner

Construction Village

Fly CampPioneer Camp

14

© 2013 Chevron Corporation. All rights reserved.

Social Infrastructure

The Chevron-funded 1.2-mile (1,900-meter) runway at Onslow airport is now operational and construction of a new terminal is well underway.

15

New Runway

Old Runway

Terminal Building

New Apron

© 2013 Chevron Corporation. All rights reserved.

Social Infrastructure

The Chevron-funded upgrade to Four Mile Creek picnic and fishing area is nearing completion.

16

New Runway