July 2011: Beginning of traditional civil work
April 2013: Launch of the request proposals
Fall 2014: Selection of the bidder
2015-2020: Civil work related to the D-B Project
Schedule
3
3
Westmount
Saint-Jacques
overpass
Development of sector
Pullman, Saint-Rémi,
Saint-Jacques
Glen \ De Courcelle
area
Ramps of the Turcot
interchange are maintained
l
Activities Related to the MUHC
MUHC
4
4
The condition of the collector requires specific operations
Long-term closure of rue Saint-Jacques
Upcoming schedule
Pont Saint-Jacques
5
Coordination of the work between different partners
Opening of the Girouard on-ramp toward the A-15 South
(October 2013)
Addition of a right-turn lane on chemin de la Côte-St-Luc
(May 2014)
Implementation of a reserved lane on rue Sherbrooke
Ouest (June 2014)
Opening of the De Maisonneuve exit on the A-15 South
(August 2014)
Opening of the Sherbrooke U-turn (August 2014)
Addition of a temporary reserved lane on chemin Upper-
Lachine (to come)
5
Mitigation Measures on Pont Saint-Jacques
6
1. Saint-Jacques between Décarie and access road to MUHC
2. Pullman between the CO Turcot and rue De Courcelle
3. Saint-Rémi between Saint-Jacques and rue Cazelais
4. Development of the escarpment
COT
1
2 3 4
MUHC
Development of the Pullman Sector
Temporary closure of the Saint-Jacques off-ramp
on the A-720 West in the last phase of the
project, in 2015
7
7
Development of the Pullman Sector
8
Land on De
Courcelle/
Saint-Jacques
8
MUHC
Land on De Courcelle / Saint-Jacques
9
Maintenance of Existing Structures
Ramps G and M – Long-term closure
G
M
10
Maintenance of Existing Structures
Ramp B – Overnight closure
11
Neighbourhood committee in the South-West
Neighbourhood committee in NDG as of 2015
Website: www.turcot.gouv.qc.ca
Monthly electronic bulletin
Phone line dedicated to the project: 514 873-1372
Twitter @MTQ_Turcot
11
For More Information
12
www.turcot.gouv.qc.ca