Post on 22-Dec-2021
Classic Twelve O’clock Cabinet
Installation Instructions
CF36
CF42
2
Table of Contents
Technical Support
Technical assistance is available Monday through Friday, 8:00 am to 6:00 pm (Eastern Standard Time).
Phone: 800-659-5922Fax: 800-583-8506
General Information ....................................................................................................................... 3CF36 Cabinet Overview.................................................................................................................. 4CF36 Cabinet Dimensions ............................................................................................................. 5CF42 Cabinet Overview.................................................................................................................. 6CF42 Cabinet Dimensions ............................................................................................................. 7Optional Computer Storage Overview.......................................................................................... 8Optional Computer Cabinet Dimensions ..................................................................................... 8Preparing the Site ...................................................................................................................9 & 10Cabinet Installation .............................................................................................................. 11 - 14Door & Drawer Adjustment .......................................................................................................... 15Clock Instructions ........................................................................................................................ 16Electrical Diagram ........................................................................................................................ 17Installation and Servicing Checklist ........................................................................................... 18
THIS MANUAL IS FOR AUTHORIZED AND QUALIFIED INSTALLATION PERSONEL ONLY!
3
General Information
The following symbols may be used throughout the product manual:
CAUTION: Failure to carefully follow the
described procedure may result in damage to
the equipment.
WARNING: Failure to carefully follow the
described procedure may result in damage to
the equipment and the operator.
Risk of electrical shock present. Make sure
power is disconnected before attempting this
procedure.
Definitions of Symbols
IEC Symbols
The following symbols conform to IEC labeling standards and may be
located throughout the product.
AC (Alternating Current)
Protective teeth (Ground)
Attention: Consult accompanying documents
OFF
ON
Type B equipment(Protected against electrical shock)
Dangerous voltage
Manufacturing Date
Waste Electrical and Electronic Equipment
Technical Description
Model Designation: Pelton Classic Twelve O’clock Cabinet
Power Supply: CF—120V
Protection against harmful ingress penetration of water:
ordinary equipment
Mode of operation: CF—Continuous
~50Hz, 12A Service
CAUTION: Only authorized service technicians should attempt to service
this equipment. Use of other than authorized technicians will void the
warranty.
Product Identification
This cabinet can be identified by its product label, located underneath the
midsection front panel. This label states the unit model and serial number,
electrical specifications and safety classification.
Note the label shown below:sample
Obtaining Technical Literature
The manufacturer will make available on request circuit diagrams, component
parts lists, descriptions, calibration instructions or other information that will
assist technical personnel to repair and replace serviceable items.
Incompatible Units or Accessories
To guarantee the operational safety and function of this device, the use of
unapproved unit or accessories is not advised. Doing so could result in potential
hazard.
Interference with Electromedical Devices
To guarantee the operational safety of electromedical devices, it is
recommended that the operation of mobile radio telephones in the medical
practice or hospital is prohibited.
Strong EMI sources such as electro surgery units may affect performance.
If performance problems occur, move the unit to another electrical circuit or
physical location.
Equipment Disposal
Contact your local authorized dealer for proper disposal of the device to ensure
compliance with your local environmental regulations.
Thank you for purchasing your new cabinet.
Maintenance Instructions
It is engineered to provide
many years of reliable performance. However, a certain amount of care is
required. Conscientious adherence to the will
ensure that your unit will function to your satisfaction for many years to come.
Therefore, we have provided you with a set of technical literature, which may be
kept for quick and easy reference.
In order to protect your rights under the warranty, the purchaser must register
the unit by filling in the warranty information provided.
Safety Notes
This cabinet is not used in rooms where an explosion hazard exists.
The pre-installation of the facility must be performed in accordance with the requirements outlined in our “Pre-installation” instructions.
As the manufacturer of cabinetry, we can only assume responsibility from the safety related performance of the cabinet, if maintenance and repair are
carried out by the manufacturer, or by agencies authorized by Pelton & Crane for this purpose, and if needed components affecting the safety of the
appliance are replaced exclusively by original spare-parts.
We suggest that you request a certificate stating the type and extent of the work performed, from those performing such work, if necessary stating any
alterations of the rated parameters or operating ranges, as well as date, name of organization and signature.
This type of appliance is classified to UL 60601-1, EN 60601-1, certified to CSA C22.2 No. 601.1-M90. Due to legal regulations, alterations of the ,
which could impair the safety of the operator, patient, or third parties, are not lawful! For reasons of product safety, only original
In order to prevent injury to persons and damage to the equipment, you must also read the warning and safety notes given in this User’s Manual. These are
emphasized with WARNING, CAUTION and NOTE.
cabinet
Pelton & Crane accessories
approved for this product, or accessories by third parties, which have been approved by Pelton & Crane, may be used. Using non-approved accessories is
at the risk of the user.
34488
059334
RE
V 0
, 03/1
1
Listed to: UL 60601-1
OPERATORY CABINET
CF
IEC Type B, Class 1
Listed to: CAN/CSA C22.2 NO. 601.1-M90
(115VAC, 12A, 60Hz)
MN
SN
MO YR
4
CF36 Overview
A-C, upper module, storageB, counter workspaceD, accessory panelE, central column, power chaseK & M, lower module, storageL, unit mount area
A
E
B
K
C
D
M
L
5
CF36 Cabinet Dimensions
The CF cabinet provides a work surface, storage, and can be installed with or without a Pelton & Crane delivery system. The CF36 cabinet also provides a work surface and outlets. It is designed with the Dentist and staff in mind to provide a robust working enviroment for the daily activities of performing dentistry. This product is intend-ed for use by dental professionals.
CF36 Overview
72-1/2"
24"
31-1/2"
14"
16-1/2"
16-7/16"
17-7/16"
15-11/16"
17-15/16"
6
CF42 Overview
A-C, upper module, storageB, CPU storageD, accessory panelE, central column, power chaseF, counter workspaceK & M, lower module, storageL, unit mount area
A
E
D
K
C
B
F
M
L
7
CF42 Cabinet Dimensions
The CF cabinet provides a work surface, storage, and can be installed with or without a Pelton & Crane delivery system. The CF42 cabinet also provides a work surface and outlets. It is designed with the Dentist and staff in mind to provide a robust working enviroment for the daily activities of performing dentistry. This product is intend-ed for use by dental professionals.
CF42 Overview
72-1/2"
24"
31-1/2"
14"
16-1/2"
17-7/16"
15-11/16"
17-15/16"
42-7/16"
8
Optional Computer Storage Overview
Optional Computer Storage Dimensions
A computer can be stored in the center storage area of the upper cabinet. Insert the computer’s cables through the access holes in the bottom of the cabinet and route to the utility box. Place the CPU so the front is facingthe cabinet door.
Follow the computer system manufacturer’s installation procedure and plug the unit into the outlets in the utility box.
Read computer system manufacturer’s recommended safety, use & care and installation instructions. Follow the computer system manufacturer’s installation procedure.
21-1/2"
21-1/4"42-7/16"
CPU storage
Upperstorage
Upperstorage
9
Preparing the Site
WARNING: Always lift cabinets by bottom edge, being careful to lift with your legs and not your back.
CAUTION: Make all required, air water and drain attachments from the utilities to the incoming stub up connections before the delivery system installation occurs. Doing so prevents damage to the utility lines
from heat associated with some plumbing connection methods.
Turn main power OFF at the installation site.
WARNING: All Electrical wiring should be in accordance with local codes.
WARNING: To avoid risk of electrical shock this equipment must be connected to power mains with protective earth.
NOTE: Use floor template to locate utilities in relation to the dental chair. Because of varying city plumbing and electrical codes, the dealer should ensure that installation meets local requirements. Pelton & Crane can not be responsible for an installation which does not meet local plumbing and electrical codes.Select the location for cabinet that will meet the operator’s arm reach and storage requirements. Refer to the dimensional drawings while considering the location of air, water and electrical connections.
SPECIFICATIONS (Floor Template depicted in Illustration)Air & Water Shut-off Valves (If required for delivery) : 1/2” pipe N.P.T. (supplied by the contractor)
protruding 1” from floor or wall. Manual shut-off valve supplied by the dealer to be installed by the contractor. Maximum height can not exceed 5” when valves are fully opened.
Electrical: 1/2” conduit and quad box or equal junction (supplied by the contractor). Wire box as per code with top of the box no higher than 4 1/2” above finished floor.
Voltage: 120 Volts AC, 3 wire, 15 amp circuit.Central Vacuum (if required): Plumbing should be specified and terminated in treatment column with 5/8” OD
tube perpendicular to floor, similar to drain connection.
WATER
AIR
N2O
O2
VACUUM
ELECTRICAL STUB UP
UTILTIES CHASE FOR RIGHT SIDE OF ROOM
UTILTIES CHASE FOR CHAIR
UTITLIES CHASE FOR LEFT SIDE OF ROOM
(OPTIONAL) (OPTIONAL)(OPTIONAL)
OUTLINEOF CABINET
BACK OF CABINET
5" 7" 11" 12-1/2" 27-1/4" 29-1/2" 32" 34-1/2" 37" 42"
4-3/4"
5-1/4"
6"6-3/4"
8-1/4"
9"
14"
3-3/4"
Floor Template (CF42 Shown)
10
Preparing the Site (Cont’d)
1. Lay installation template over plumbing stub-ups and check the distance from the cabinet to the walls according to operatory layout. (Floor template is depicted in illustration. Stub-up information in the tem-plate illustration applies to all models.)
2. The shut-off valves for air and water must be installed above the finished surface as indicated in the template: 5” max. when in an open position.
3. Install air and water shut-off valves. NOTE: A 3/8” compression fitting is recommended for the output connection on the cutoff valves.4. Connect flexible hoses from air and water regulator assemblies to the air and water shut-off valves. NOTE: To ensure proper operation of the unit, flush air and water lines before connecting equipment. Place floor mounting bracket over the templet 5. Mark the (4) moutnings (2 each side) according to the template. If mounting a 2800 delivery unit, also
mark the front and rear mounting holes according to the template. NOTE: If flooring is carpeted, cut carpet away from the cabinet mounting point to gain stability to the
cabinet when secured to the floor.6. Concrete Floor: Drill four 3/8” holes, 3” deep into floor. Wood Floor: Drill four 1/4” holes, 2 3/4” deep into floor.
NOTE: The template illustration depicts the mounting points.
WALL ELEVATION
Allow 16" of 1/2" Flex Conduit to extend beyondstub-up for electrical hook-ups.
ELEC.
NOTE: Will need to cut back cabinet wall when installing utilities from the wall.
Elec. Vacuum
Air FinishedFloorSurface
2"
2"
4-1/2"
7"
9"
11"
13"
15"
(Optional)BOX
N O2 O2Water
11
Cabinet Installation
1. Remove the box and shrink wrap from around the cabinet.
2. Unclip the doors and/or drawers and place in a safe area.
12
3. Remove the shelves from the upper and lower cabinets .
Cabinet Installation cont’d.
4. Remove the (4) bolts, washers and nuts holding the cabinet section to the pallet.
Bolt
NutCenter bracketsused on 2800 only
Washer
13
7. Loosen the cabinet mounting brackets on each side using the (4) 1/4” bolts installed in the cabinet sides.
8. To level the cabinet, place a level on the top of the countertop and adjust the (4)
leveling feet so that the cabinet is completely level in all directions. Re-tighten
the (4) 1/4” bolts on the cabinet mounting brackets on each side and re-check level-ing.
5. Using the floor template provided, drill for concrete (4) 3/8” x 3” deep holes, for wood drill (4) 1/4” x 2-3/4” deep holes. For con-crete insert (4) 3/8” x 2-3/4” anchor bolt, washer, lock washer and nut, for wood in-sert (4) 3/8 x 3-1/2” lag screw, lock washer, and washer.
Note: On cabinets using a 2800 delivery system, (4) additional holes will need to be drilled and additional hardware used to secure the cabinet to the floor.
6. Remove the cabinet mount assembly from the pallet and place over the area marked for the installation. Bolt the cabinet to floor through the cabinet mounting brackets.
Note: Ensure that cabinet mounting
brackets are permanently and securely fastened to the floor.
Cabinet Installation cont’d.
FloorTemplate
Center bracketsused on 2800 only
CabinetMountingBracket
CabinetMountingBracket
Center bracketsused on 2800 only
Level
LevelingFeet
CabinetMountingBracket
LevelingFeet
CabinetMountingBracket
14
9. Connect utilities in accordance with local codes.
10. Re-install shelves and/or drawers and doors removed previously, taking care to place them in their original positions.
Cabinet Installation cont’d.
15
Door & Drawer Adjustment
Cam wing mounting plate
One piece wing plate
Range (5/32")
Range (5/32")
Rotate front screw to increase ordecrease door position.Range (3/32")
Rotate spiral -tech camscrew to adjust door position.Range (3/16")
WARNING over-adjusting hinges can cause damage
Note:Upper & lower platesmust be movedtogether for each door
Note:Upper & lower platesmust be movedtogether for each door
Drawer front adjustment - Standard
Vertical Adjustment
4.5. Turn clockwise to raise -
counter clockwise to lower,re-tighten Attachment Screw.
Loosen Attachment Screw
6. Tilt adjustment(for large drawers only)
Horizontal Adjustment
1. Loosen Mounting Screws2. Adjust Front3. Tighten Screws
1
1.
2/3.4.
5.
6.
Vertical Adjustment
4. Loosen the attachmentscrew. Adjust drawerfront up/down thentighten screw.
Horizontal Adjustment
1. Loosen Mounting Screws2. Adjust Front3. Tighten Screws
1.
4.
2/3.
16
Clock Instructions
To Set Calendar/ClockThe CLOCK button is used to alternate between 12 hour (AM / PM) and 24 hour (International / Military time) clock modes. When you insert the battery, the clock will automatically be in the 12 hour clock mode. If you would like the clock to be in the 24 hour clock mode press CLOCK before setting the clock. The letters AM or PM will appear for 12 hour clock only.
To set the calendar/clock, first press the SET button to adjust the settings. When SET is pressed, the flashing figures will display in the following sequence: year, month, date, hours, minutes, seconds. Press the or but-tons to change the calendar or the clock. The button will decrease the numbers and the button will increase the numbers.
NOTE: The day of the week will automatically change when you change the date.
To Use Stopwatch(Times up to 23 hours, 59 minutes, 59 seconds)Press the STOP WATCH button to enter the Count-up/Stopwatch mode. Press the START/STOP button to begin counting up in seconds. Press START/STOP again to stop time. Press again to restart. After you stop the time, press the and buttons at the same time to clear the time and reset to 00:00.
Your timer can time up to four activities at once, if desired. The maximum time for each being 23 hours, 59 min-utes, 59 seconds.
To Use The Basic TimerFirst press the TIMER button to enter the timer mode. The number “1” will be displayed in the upper right hand corner of the timer. Then press SET and using the and/or buttons, set the desired timing period (hours, minutes and seconds). Next press START/STOP to begin timing. Any time during the timing period the timer can be stopped by pressing START/STOP. Press START/STOP again to restart. Once time elapses, alarm will sound for 60 seconds. Timer will count up to show how much time has elapsed since the timer sounded. Press START/STOP to stop the tone and count-up time and reset to 00:00.
To Use Memory Timers 2, 3, and 4First press TIMER to enter the timer mode. Then press the MEMORY 2-3-4 button. Each time you press MEMORY 2-3-4, a different number will appear in the upper right hand corner of the timer. That number indicates which timer is being used. Press SET and using the and/or buttons set the desired timing period for each timer.
When you set timers 2, 3, and 4, the times will automatically be stored. To reset any of the stored times, press the and at the same time and this will erase the time in the memory.
Memory RecallTo recall a stored time after the time has expired, first make sure you are in the timer mode, then press MEMORY 2-3-4 until the correct timer is displayed.
NOTE: Timer 1 is a basic timer and does not include the memory recall feature.
17
Electrical Diagram
INPUT POWERCABLE
BLK
WH
TW
HT
GR
N
BLK
BLK
GR
N
( WIRE NUT)
WH
TW
HT
G/Y
G/Y
18
Verify the following after installation or servicing of the cabinet:
All manuals are present.
All labels are present and legible.
No mechanical damage on new installations.
The cabinet is connected to the correct power source.
There are no water or air leaks.
All the cabinet adjustments have been made according to the users manual.
Ensure control panel functions properly.
Installation and Servicing Checklist
19
NOTES
Pelton & Crane 11727 Fruehauf Drive Charlotte, NC 28273 USA
Order No. 059351Rev. 0, 4/11
Printed in USA
We reserve the right to make any alterations which may be due to any technical improvements.
© 2011, Pelton & Crane