Post on 12-Jun-2018
Tata Steel and Odisha: A Partnership Stronger Than Steel Arun Misra, Vice President (Gopalpur Project) Date: 30/10/2017
2nd most geographically diversified
steel producer in the world
23.88 million tonnes of annual crude steel production
50 countries with
commercial presence
US $18.11 billion Turnover in FY 17
Tata Steel: A Global Conglomerate
ML**, Odisha
Sukinda, Odisha
West Bokaro (J)
Kalinganagar (O)
CAPACITY
7 MnTPA
Tata Steel India: An Overview
1
4 3
5 6
9 7 8
2
Steel Manufacturing and Finishing Mills
LOCATION NATURE OF OPERATIONS
Flat Product Manufacturing
Long Product Manufacturing 3 MnTPA
Flat Product Manufacturing 3 MnTPA
Jamshedpur (J) 1
2
Khondbond (O)
LOCATION NATURE OF OPERATIONS CAPACITY*
8 MnTPA
6 MnTPA
2 MnTPA
3
Iron & Coal Mines
4
5
6
7
8
9
Noamundi (J)
Katamati (O)
Joda East (O)
Jamadoba (J)
Sijua (J)
O/C Iron Ore Mine
O/C Iron Ore Mine
O/C Iron Ore Mine
O/C Iron Ore Mine
U/G Coal Mine
U/G Coal Mine
U/G Coal Mine
ML**, Odisha
LOCATION NATURE OF OPERATIONS CAPACITY*
0.21 MnTPA
0.19 MnTPA
0.23 MnTPA
Other Business Units
Manganese Mines
4 Ferro Alloy Plants
Chromite Mine
9 MnTPA
5 MnTPA
0.7 MnTPA
0.5 MnTPA
*ROM Production in FY 17 **Multiple Locations
1928
Tata Steel & Odisha: The Journey
1909
Discovered Iron Ore in Odisha
Discovered Mn. Ore in Odisha 1949
Discovered Chrome Ore in Odisha
1950
Ferro Alloy Plant (50,000 TPA), Joda starts production
1956
Mining Operation commenced in Joda East Iron Mine
1960
Mining Operation commenced in Sukinda Chromite Mine
1964
Mining Operation commenced in Manganese Group of Mine
1991
Acquisition of Charge Chrome Plant (50,000 TPA) from M/s OMC, Bamnipal 2006
Acquired Ferro Chrome Plant (52,000 TPA) from M/s Rawmet
2016
The First Unit of the Gopalpur Industrial Park Starts operating
2017
55,000 TPA Capacity Ferro Alloy Plant became operational
The first phase (3 MnTPA) of the state of the Art Steel Plant became operational
Tata Steel Kalinga Nagar
- Second largest integrated steel plant in India
- 3 MT crude steel production capacity in the first phase
- Tata Steel Kalinganagar has achieved the fastest ramp-up in a Greenfield project in India. Crude steel production in FY2017 was 1.68 MT
- Has the largest blast furnace in India - 4330 cubic metres
380 Hectares
G O PA L P U R I N D U S T R I A L PA R K
Multi-Product SEZ (Suitable for Export Manufacturing)
Domestic Tariff Area (Suitable for Indian Markets)
Social Infrastructure (For people living within
the Industrial Park)
702 Hectares 120 Hectares
1202 Hectares
Gopalpur Industrial Park: An Introduction
Partners in Success
Climatic Impact Study Detail Engineering Traffic Assessment Master Planner
Railway Siding Study Anchor
Implementation Demand Study Marine Env. Study
*Logos represented are properties of respective companies and are protected by copyrights law.
0 KM
National Highway
Operational Air Strip
Sea Port
Railway Sliding
4 KM
8 KM
8 KM
Visakapatnam
Bhubaneswar
Golden Quadrilateral Road network (Connecting all Metro Cities of India)
Gopalpur Port
Paradip Port
Dhamra Port
Vishakapatnam
Bhubaneswar
Gopalpur Industrial park
Kolkata
National Highway 5 (Kolkata to Chennai)
East Coast Railway lane
From To Distance (in Nautical Miles)
Gopalpur Osaka, Japan 5,300
Multi-modal Connectivity
LIVING
- From Studio Apts. to Luxury Villas
- Serviced Apartments facilities available too
HEALTHCARE
- Primary Healthcare center
- 500 bed hospital
SHOPPING MALLS
- Departmental Stores - Restaurants - Brand Showrooms - Entertainment Zones
EDUCATION
- Primary Education - Vocational Training center - International Universities
GOPALPUR INDUSTRIAL PARK
The Complete City in the Offering
MANPOWER RESOURCING
SAFETY
& SECURITY
PLUG & PLAY INFRASTRUCTURE
CUSTOMER
RELATIONSHIP MANAGER
GUIDANCE IN
GOVT. APPROVALS
PAY PER USE FACILITIES
MAKE WITH
E A S E SERVICE
PROVIDERS
LIVING FACILITIES
Facilitation Support
Plug & Play Infrastructure Environment Clearance Obtained
Electricity - Incoming power supply at 220 KV - Stepped down power supply at 33/11 KV
Water - 10 MLD from Perennial water source - Additional 15 MLD Desalination Plant is proposed
Internal Road - Well planned internal roads
Drainage - Complete network of drainage and waste water collection system
“Units set up in Gopalpur Industrial Park are eligible for incentives offered by the Federal and State Governments”
Industrial Plots
Industrial plots with Power, Water, Road and Drainage connections up to the battery
limits of the plots.
Ready to Built Sheds
Ready built sheds of 10,000 Sq Ft area with Power, Water, Road and Drainage connections. Just Plug & Play!
Built to Suit
Factories are built as per the customer’s requirement. The customer provides the design req. and we build as per the requirements.
You Require, We Provide!
Tata Steel Ferro Chrome Plant
Leading Oil Marketing
Company in India
Pharmaceutical Company
Defence Manufacturing
Company
Mobile Manufacturing Unit
Russian Steel Maker
Golf Course by a USA based co.
USA based hospitality institute
Textile Manufacturer
Wellness Centre
International School
Medical Research Institute
Committed Plots
Bhubaneswar Half Marathon (2017)
Bhubaneswar Literary Meet (2017)
JN Tata Technical Training Centre, Gopalpur
Vaarta: Farmer - Scientist meet at Gopalpur (2017)
Community Outreach