CE 0694 TA05E011.G0606 Technical Specification RADIANT BRUCIATORI S.p.A. Montelabbate (PU) ITALY ENGLISH

CONTENTS

• General product information page 1

• Technical characteristics

◦ Dimensions 3

◦ Internal parts of boiler 4

◦ Water circuit 5

◦ Product Specification 6

◦ Technical Data 7

◦ Wiring diagram 9

• Installing the appliance

◦ Individual boiler installation 11

◦ Individual boiler + storage cylinder installation 12

◦ Cascade installation 14

◦ Cascade installation + storage cylinder installation 18

• Hydraulic accessories - manifolds

◦ Individual boiler installation 13

◦ Cascade Installation 19

• Flue accessories - manifolds

◦ Individual boiler installation 21

◦ Cascade Installation 23

• System control 26

• Installation examples 28

• Approvals 33

general product information RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

1

High Efficiency Premix Condensing Boiler

High Efficiency condensing boiler mod. RK 50, with a

premixed combustion exchanger system for heating only. It

can be installed as an individual boiler or in cascade

system.

The right solution for specification designers thanks to the

high flexibility of installation.

The right product for installers thanks to the wide variety of

accessories for a simple and trouble free installation .

The best solution and advantage for the end-user:

Energy saving, environmentally friendly

mod. RK 50 ◦ HEAT OUTPUT MAX 50 KW (80-60°C)

◦ PREMIX – CONDENSING

◦ EFFICIENCY 107,9 %

◦ INDIVIDUAL OR CASCADE INSTALLATION

◦ SUITABLE FOR OUTDOOR INSTALLATION IN MODULAR BOX UNITS

◦ COMPACT DIMENSION (LxWxH): 490X470X700

◦ CE APPROVAL NO. 0694BP0446

◦ SEDBUK BAND A

general product information RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

2

High flexibility of installation!

Output 50 kW

Output 50 kW

Output 100 kW

Output 200 kW

Output 150 kW

dimensions RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

3

470

470

134

336

490

700

210210 70

AR

110

VS

490

82

5452

107

364

165

198

78

470

270 112108

280 210

R A

SC

G

LEGENDA

R HEATING RETURN Ø1”1/4

A HEATING FLOW Ø1”1/4

G GAS Ø3/4”

SC CONDENSATE DRAIN Ø25

VS PRESSURE RELIEF VALVE DRAIN Ø3/4”

internal parts of boiler RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

4

3

14

4

18

9

12

17

16

5

144 3

15

11

9

21

21

10

11

8

19

22

4

5

23

12

FRONTRIGHT SIDE

LEFT SIDE

22

20237

13

146

21

1 1

2

Position Description 1 WATER PRESSURE SWITCH 2 FLUE TEST POINT 3 PUMP 4 FAN RG128 5 CONDENSING EXCHANGER 6 HEATING FLOW 7 HEATING RETURN 8 WATER TRAP SIPHON 9 FLUE DUCT CONNECTION CHAMBER 10 BURNER RUBBER PIPE DRAIN 11 CONDENSATE RUBBER PIPE DRAIN 12 AIR INTAKE PIPE 13 4 BAR PRESSURE RELIEF VALVE 14 GAS VALVE VK4115V 15 VENTURI 16 HEATING SAFETY THERMOSTAT 95°

17 FLUE SAFETY THERMOSTAT 90° MANUAL RESET

18 HEATING SENSOR 19 ELECTRONIC IGNITION BOARD 20 DRAIN TAP 21 IGNITION ELECTRODE 22 FLAME IONISATION ELECTRODE 23 CONDENSATE DARIN PIPE

water circuit

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

5

1 PUMP 11 HEATING SAFETY THERMOSTAT 95° 2 AUTOMATIC AIR VENT 12 FLUE SAFETY THERMOSTAT 90 ° M.R 3 FAN RG128 13 HEATING SENSOR 4 CONDENSING EXCHANGER 14 DRAIN TAP 5 BURNER 15 IGNITION ELECTRODE 6 FLUE DUCT CONNECTION CHAMBER 16 FLAME IONISATION ELECTRODE 7 AIR INTAKE PIPE 17 CONDENSATE DRAIN PIPE 8 4 BAR PRESSURE RELIEF VALVE 18 WATER TRAP SIPHON 9 GAS VALVE 19 WATER PRESSURE SWITCH 10 VENTURI

KEY

R - HEATING RETURN SC - CONDENSATE DRAIN G - GAS A - HEATING FLOW

17

12

5

8

G SC AR

18

19

14

1

2

1113

6

4

15

167

3

9

10

product specification

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

6

High efficiency premix condensing boiler – main components specification: : − Premixed stainless steel combustion exchanger system with stainless steel radial gas burner equipped with

ignition electrode and flame ionisation electrode; − Condensing exchanger with primary coil type exchanger gas/water in AISI 316L stainless steel; − Room sealed combustion chamber with separate air intake and flue exhaust connections. − Variable speed Exhaust fan; − Heating flow temperature sensor; − Heating safety thermostat; − Circulation pump with automatic air vent; − Water pressure switch; − Condensate drain circuit with water trap siphon and drain pipe; − Control Panel with microprocessor controlled electronic printed circuit board for a continuous modulation;

possibility of outside temperature sensor connection, dhw production priority control. − Short cycling device in heating mode, frost protection, pump inactivity protection, chimney sweeper (test

function); − External casing panels; − Operational parameters setting through touch pads and monitoring of operation mode through the digital

display; − Digital display showing the self-diagnostic function through error codes, the operating temperatures and

settings; Safety Features: − Self-diagnostic; − Water pressure switch: water deficiency control and boiler lock-out in case of low water pressure. − Heating safety thermostat: high temperature control across the primary exchanger; − Flue safety thermostat: high temperature control across the flue exhaust; − 4 bar safety valve – primary circuit; − Frost protection; Suitable for: − Cascade installation (up to 4 boilers); − Outdoor installation in modular box units; − Individual boiler installation and connection to a storage cylinder through an external 3-way valve Kit and

domestic hot water temperature sensor, for the domestic hot water production; − Cascade installation controlled by a cascade regulator system, heating flow sensor and outside temperature

sensor. Technical specification − Device Gas Category II2H3+

− Gas: Natural Gas or L.P.G. . − Modulation range: 12÷51 kW; − Output (80-60°C): 49.90 kW − Output (50-30°C): 54.50 kW − Heating temperature setting: 30÷80°C - 25÷40°C − Dimensions: 490x700x470 − Electrical protection: IPX4D − CE Approval – Sedbuk Band A

technical data

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

7

Technical Data CE Certification no. n° 0694BP0446 Flue category B23, C13, C33, C43, C53, C63, C83 Type II2H3/P Heat input max kW 51 Heat input min kW 12 Heat output max (80/60°C) kW 49,88 Heat output max (50/30°C) kW 54,47 Heat output min (80/60°C) kW 11,65 Efficiency 100% load (80/60°C) % 97,8 Efficiency 100% load (50/30°C) % 106,8 Efficiency 30% load (80/60°C) % 101,8 Efficiency 30% load (50/30°C) % 107,9 Gas directive 92/42/EEC – Efficiency marking Stars Heating circuit Central heating water temperature setting (min-max) °C 30-80 / 25-40 Max Heating temperature °C 90 Max working pressure bar 5 Circuit water content Litres 3.5 Dimensions Width mm 490 Height mm 700 Depth mm 470 Weight kg 80 Hydraulic connections Flow connection Ø 1”1/4 Return connection Ø 1”1/4 Gas connection Ø 3/4” Gas supply Natural Gas G20 Inlet pressure mbar 20 Gas consumption m3/h 5,40 Liquid Butane Gas G30 Inlet pressure mbar 30 Gas consumption kg/h 4.20 Liquid Propane Gas G31 Inlet pressure mbar 37 Gas consumption kg/h 3.96 Electrical supply Power supply V/Hz 230/50 Maximum power consumption W 195 Electrical protection IP X4D

technical data

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

8

Combustion data Combustion efficiency % 97.9 Flue efficiency losses with burner on (100% load) % 2.1 Flue efficiency losses with burner on (Min. output) % 2.9 Casing efficiency losses (100% load) % 0.1 Casing efficiency losses (Min. Output) % 1 Fumes temperature at nominal output °C 65.6 Fumes temperature at minimum output °C 60 Fumes flow rate at Nominal Output kg/h 80 Fumes flow rate at minimum Output kg/h 19.7 CO2 value at nominal output % 9.66 CO2 value at minimum output % 9.2 CO value at nominal output ppm 10 CO value at minimum output ppm 5 NOx ppm 20 NOx mg/kWh 35 NOx class (European Standard UNI EN 297 – pr A5 classe 5

Circulation pump head/flow graph

2200 2400 2600

RSL 15/7

8002000

10

0400 600

20

1000 200014001200 18001600

Hea

d kP

a

40

30

70

50

60

Flow rate litres/h

wiring diagram

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

9

CIR

CU

IT B

OAR

DC

ON

NE

CTO

RS

4565

PD

2020

TS

SE

TA

IG

1.5

bar

SRS

S

VD

KE

Y

LLI

VE

NN

EU

TRA

LP

AC

WA

TER

PR

ES

SU

RE

SW

ITC

H

IGM

AIN

SW

ITC

H

SS

D.H

.WA

TER

SE

NS

OR

(WIT

H S

TOR

AG

E C

YLIN

DE

R)

SR

HE

ATI

NG

SE

NS

OR

P

PU

MP

TSH

EA

TIN

G S

AFE

TY T

HE

RM

OS

TAT

SE

OU

TDO

OR

TE

MP

ER

ATU

RE

SE

NS

OR

TAR

OO

M T

HE

RM

OS

TAT

TSC

CO

ND

EN

SIN

G E

XCH

AN

GE

R S

AFE

TY T

HE

RM

OS

TAT

W

/MA

NU

AL

RE

SE

TV

DD

IVE

RTE

R V

ALV

EE

AIG

NIT

ION

ELE

CTR

OD

EE

RIO

NIS

ATI

ON

ELE

CTR

OD

EE

VM

OD

ULA

TIN

G F

AN

47

M4

brown

light-blue 1918

P

4546red

50 H

z

59

orange

light-bluebrown

8M

520C

2221R

S

56

7M

29

13

2

light

-blu

e

brown

light-blue

black

M8

5048

49

white

M9

5655

5758

brown

black

brown

orange

M10

M1

452

5153

54

orange

black

black

6061

black

LN

orange

PO

WE

R S

UP

PLY

LIN

K

230V

brownlight-blue

white

brown

red

brown

black

light-blue

( WIT

H D

.H.W

. S

TOR

AG

E C

YLIN

DE

R)

TSC

MO

DU

LATI

NG

FA

N

type

RG

128/

1300

-361

2D

IGIT

AL

IND

ICA

TOR

S B

OA

RD

- co

de 7

6654

LAP

RIN

TED

CIR

CU

IT B

OA

RD

SM

2001

5 - c

ode

7665

5LA

-1

+

65

34

2

NP

WM

LM

1012

118

9 7

L

M12

M1

M3

black

white

brown

green

yellow

blac

kgr

ey

light

-blu

egr

ey

brow

nbl

ack

brow

nlig

ht-b

lue

-

pspwm

ps+

LN 230

V A

C

Hs ps

ELE

CTR

ON

IC IG

NIT

ION

BO

AR

D

S45

65P

D20

20 -

code

766

57LA

13

45

26

78

9 10

1112

Hs

+

ps

4 PW

M

CM

1

-V2

+V

1

6 875

HS3

P2

P1

TP1

M2

CM

2

R156A

RV G

ND

+5VM

OD

+20

V

7471

7273

70

9 MO

DU

LATI

NG

FA

N

PR

INTE

D C

IRC

UIT

BO

AR

DS

K11

001

cod.

766

58LA

1110

1213

1416

1517

pwm

-

M9

M10 M12

M8

M11

M13

M7

M6

M1

M4

M2

M3

M5

electrical connections individual boiler + storage cyl. installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

10

Electrical connections: individual boiler + storage cylinder installation (with 3-way valve kit - cod. 26097LP)

SR

DIAGNOCODE SM 20015 ELECTRONIC P.C.B. - cod. 76655LA

M9M10

M12M8

M11

M13

M7

M6

M1

M4

M2M3

M5

whi

te

red/

blac

k

red

blac

k/w

hite

4645 494847 50

M8SR

blac

k

brow

n

C

light

blu

e

21 2220M5

STORAGE CYLINDER DHW TEMPERATURE SENSOR

code 31219LA

2609

7LP

Electrical connections: Connect the STORAGE CYLINDER DHW TEMPERATURE SENSOR (31219LA) as follows:: Remove the resistance from M8 terminal block and connect the DHW temperature sensor cables to terminals 45 and 46. Connect the 3-WAY VALVE CABLE (31282LA) as follows: Connect the 3-way valve cable to M5 terminal block

individual boiler installation RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

11

A wide choice of accessories has been designed to ensure the highest flexibility of installation.

The solution described below uses the connection kit (code 26110LP) and hydraulic compensator (code 26125LP)

for the control of different flow rates between the primary and possible secondary circuits.

2612

5LP

4

1

MIRI

2611

0LP

4

5

4

6

7

SC CONDENSATE DRAIN POINT Ø 25

KEY

WATER PRESSURE GAUGE CONNECTION SOCKET (Ø1/8")

7 FILLING LOOP CONNECTION (Ø1/2")

65 STRAINER

4 ISOLATING VALVE

TUNDISH32

EXPANSION VESSEL CONNECTION (Ø3/4") 14 BAR PRESSURE RELIEF VALVE CALDAIE

Ø 3/4"

Ø 3/4"

Ø 2"1/2

Ø 2"1/2

HYDRAULIC CONNECTIONS

HEATING FLOW

HEATING RETURN

TUNDISHSI

RIG

MI

ATTACCO GAS

ACCESSORIRES (optional)

26110LP HYDRAULIC COMPENSATOR KIT - DN150

26125LP HYDRAULIC COMPENSATOR KIT - Ø 2" CONNECTION

individual boiler + storage cylinder installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

12

An individual boiler installation connected to a remote storage cylinder for the Domestic Hot Water production with the use of a ‘3-way valve Kit’ (code 26097LP)

2612

5LP

2609

7LP

43

2

1

MB

RB

MIRI

2611

0LP

4

5

7

6

26125LPHYDRAULIC COMPENSATOR KIT - DN15026110LP

ACCESSORIRES (optional)

GAS

MI

G

RI

SI TUNDISH

HEATING RETURN

HEATING FLOW

HYDRAULIC CONNECTIONSØ 2"1/2

Ø 2"1/2

Ø 3/4"

Ø 3/4"

4 BAR PRESSURE RELIEF VALVE CALDAIE1 EXPANSION VESSEL CONNECTION (Ø3/4")

23 TUNDISH

ISOLATING VALVE4STRAINER5

6FILLING LOOP CONNECTION (Ø1/2")7WATER PRESSURE GAUGE CONNECTION SOCKET (Ø1/8")

KEY

Ø 25CONDENSATE DRAIN POINT SC

3-WAY VALVE KIT FOR DHW STORAGE CYLINDER CONN. (DHW SENSOR 31219LA INCLUDED)26097LP

MBRB HTG RETURN FROM DHW STORAGE CYLINDER

HTG FLOW TO DHW STORAGE CYLINDER Ø 1"

Ø 1"

HYDRAULIC COMPENSATOR KIT - Ø 2" CONNECTION

hydraulic accessories - manifolds individual boiler installation RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

13

HYDRAULIC VERTICAL CONNECTION KIT cod. 26110LP

For a direct connection to the boiler. On the return connection a strainer has been included to protect the boiler from any dirty or impurity that may cause obstructions.

The Kit includes: 1. strainer 2. isolating valve 3. expansion vessel connection 4. water pressure gauge connection socket 5. filling loop connection (5. INTERN: Heating system

filling point) HYDRAULIC COMPENSATOR KIT cod. 26125LP

The use of a compensator is recommended when there is a primary circuit with its own circulating pump and a secondary circuit with one or more circulating pumps. The compensator will negate situations whereby the different pumps of the circuit will interact one with another creating abnormal flow variations.

The compensator will create a low pressure loss zone so that the primary circuit (of the boiler) will become independent from the secondary circuit to guarantee flexibility of installation and on systems with several pumps, high flow rates and high pump heads

The Kit includes: 1. washer (x2) Ø1”1/2; 2. washers (x2) Ø2”1/2; 3. hydraulic compensator ; 4. Ø2”1/2 => Ø2” adapters;

3-WAY VALVE KIT cod. 26097LP

It is possible to connect the boiler to a storage cylinder for the domestic hot water production by installing the 3-Way valve Kit. The installation of the 3-way valve kit (on the heating return) requires the use of a chronostat for the boiler control, excluding the use of a cascade regulator. The kit includes a 3- Way valve, a cylinder DHW temperature sensor (8 metres length) that will be connected to the boiler main pcb to enable the correct setting and data display (DHW temperature)

The Kit includes: 1. htg flow manifold to DHW storage cylinder Ø1”1/2; 2. htg return manifold from DHW storage cylinder Ø1”1/2; 3. 3-way valve; 4. storage cylinder dhw temperature sensor;

Ø1"1/2

Ø 1"1/21

4

2

4

2

Ø 2"

Ø 2"

1

3

Ø1"1/2Ø1"1/2

Ø1"1/2 Ø1"1/2

12

3

HEATING RETURN FLOW

HEATING

HEATING FLOWDHW STORAGE CYLINDER Ø1"

CYLINDER Ø1"DHW STORAGE HEATING RETURN

2

5

4

Ø1"1/2

Ø1"1/2

Ø1"1/2

Ø1"1/2

3

2

1

2

cod. 26125LP

cod. 26110LP

cod. 26097LP

cascade installation - Output 100 kW RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

14

82103LP

26116LP

RI

MI

26164LP

4 BAR PRESSURE RELIEF VALVE

DN 65

DN 65HEATING RETURN

HEATING FLOWMIRI

HYDRAULIC COMPENSATOR KIT - DN15026116LPHYDRAULIC CONNECTIONS

DN 65

DN 65HTG FLOW MANIFOLD

HTG RETURN MANIFOLD CRCM

THE CASCADE SYSTEM INCLUDES:

RRRM HTG FLOW VERTICAL CONNECTOR

HTG RETURN VERTICAL CONNECTOR Ø1"1/2

Ø1"1/2

ACESSORIES

82103LP FLUE MANIFOLD KIT MK50 Ø125 IN PP FOR 2 BOILERS IN CASCADE INSTALLATION

26164LP HYDRAULIC MANIFOLD KIT FOR 2 BOILERS IN CASCADE INSTALLATION

NO RETURN VALVE

STRAINER

TUNDISH

ISOLATING VALVE

EXPANSION VESSEL CONNECTION (Ø3/4")

• CE APPROVAL NO.0694BP0446 • HYDRAULIC MANIFOLDS IN STEEL MATERIAL

COMPLETE WITH ISOLATING VALVES, NON-RETURN VALVE, STRAINER.

• FLUE MANIFOLDS AVAILABLE AS ACCESSORIES

• FLUE SYSTEM DESIGN CONSULTANCY • HEATING ONLY OR HEATING + D.H.W.

CONNECTION VERSIONS

cascade installation - Output 150 kW RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

15

HYDRAULIC MANIFOLD KIT FOR 2 BOILERS IN CASCADE INSTALLATION26164LPHYDRAULIC MANIFOLD KIT 1 ADDITIONAL BOILER IN CASCADE INSTALLATION26163LP

FLUE MANIFOLD KIT MK50 Ø125 IN PP FOR 2 BOILERS IN CASCADE INST.82103LP

ACESSORIES

RI

MI

26116LP

26163LP

26116LP HYDRAULIC COMPENSATOR KIT - DN150

82104LP82103LP

82104LP FLUE MANIFOLD KIT SK50 Ø125 IN PP FOR 1 ADDITIONAL BOILER IN CASCADE INST.

HYDRAULIC CONNECTIONS

THE CASCADE SYSTEM INCLUDES:

4 BAR PRESSURE RELIEF VALVE

DN 65

DN 65HEATING RETURN

HEATING FLOWMIRI

DN 65

DN 65HTG FLOW MANIFOLD

HTG RETURN MANIFOLD CRCM

RRRM HTG FLOW VERTICAL CONNECTOR

HTG RETURN VERTICAL CONNECTOR Ø1"1/2

Ø1"1/2

NO RETURN VALVE

STRAINER

TUNDISH

ISOLATING VALVE

EXPANSION VESSEL CONNECTION (Ø3/4")

26164LP

• CE APPROVAL NO.0694BP0446

• HYDRAULIC MANIFOLDS IN STEEL MATERIAL COMPLETE WITH ISOLATING VALVES, NON-RETURN VALVE, STRAINER.

• FLUE MANIFOLDS AVAILABLE AS ACCESSORIES

• FLUE SYSTEM DESIGN CONSULTANCY

• HEATING ONLY OR HEATING + D.H.W. CONNECTION VERSIONS

cascade installation - Output 200 kW RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

16

8210

3LP

8210

4LP

RI

MI

2611

6LP

EXP

AN

SIO

N V

ES

SE

L C

ON

NE

CTI

ON

(Ø3/

4")

ISO

LATI

NG

VA

LVE

TUN

DIS

H

STR

AIN

ER

NO

RE

TUR

N V

ALV

E

4 B

AR

PR

ES

SU

RE

RE

LIE

F VA

LVE

TH

E C

AS

CA

DE

SY

ST

EM

IN

CLU

DE

S:

Ø1"

1/2

Ø1"

1/2

HTG

RE

TUR

N V

ER

TIC

AL

CO

NN

EC

TOR

HTG

FLO

W V

ER

TIC

AL

CO

NN

EC

TOR

R

MR

R

CM

CR

HTG

RE

TUR

N M

AN

IFO

LD

HTG

FLO

W M

AN

IFO

LD

DN

65

DN

65

RI

MI

HE

ATI

NG

FLO

W

HE

ATI

NG

RE

TUR

ND

N 6

5

DN

65

HY

DR

AU

LIC

CO

NN

EC

TIO

NS

HYD

RA

ULI

C C

OM

PE

NS

ATO

R K

IT -

DN

150

2611

6LP

AC

ES

SO

RIE

S

2616

4LP

2616

4LP

HYD

RA

ULI

C M

AN

IFO

LD K

IT F

OR

2 B

OIL

ER

S IN

CA

SCA

DE

INS

TALL

ATI

ON

2616

4LP

FLU

E M

AN

IFO

LD K

IT M

K50

Ø12

5 IN

PP

FO

R 2

BO

ILE

RS

IN C

AS

CA

DE

INS

T.82

103L

P82

104L

PFL

UE

MA

NIF

OLD

KIT

SK

50 Ø

125

IN P

P F

OR

1 A

DD

ITIO

NA

L B

OIL

ER

IN C

AS

CA

DE

INS

TALL

ATI

ON

cascade installation - Output 200 kW RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

17

• C

E A

PP

RO

VA

L N

O.0

694B

P04

46

• H

YD

RA

ULI

C M

AN

IFO

LDS

IN

STE

EL

MA

TER

IAL

CO

MP

LETE

WIT

H

ISO

LATI

NG

VA

LVE

S, N

ON

-R

ETU

RN

VA

LVE

, STR

AIN

ER

. •

FLU

E M

AN

IFO

LDS

A

VA

ILA

BLE

AS

A

CC

ES

SO

RIE

S

• FL

UE

SY

STE

M D

ES

IGN

C

ON

SU

LTA

NC

Y

• H

EA

TIN

G O

NLY

OR

H

EA

TIN

G +

D.H

.W.

CO

NN

EC

TIO

N V

ER

SIO

NS

cascade + storage cylinder installation RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

18

26167LP

MB

RB

MI

RI

26116LP

26164LP

RI

MI

26167LP

RB

MB

26116LP

26163LP

Output 200 kW

Output 150 kW

26163LA HYDRAULIC MANIFOLD KIT 1 ADDITIONAL BOILER IN CASCADE INSTALLATION 26164LA HYDRAULIC MANIFOLD KIT FOR 2 BOILERS IN CASCADE INSTALLATION

26167LP HYDRAULIC MANIFOLD KIT FOR 2 BOILERS IN CASCADE INSTALLATION + 3-WAY VALVE KIT FITTED FOR DHW STORAGE CYLINDER CONNECTION

26116LP HYDRAULIC COMPENSATOR KIT - DN150 MI HEATING FLOW RI HEATING RETURN MB HTG FLOW TO DHW STORAGE CYLINDER RI HTG RETURN FROM DHW STORAGE CYLINDER

26116LP

RI

MI

MB

RB

26167LP

Output 100 kW

hydraulic accessories - manifolds cascade installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

19

HYDRAULIC MANIFOLD KITS FOR CASCADE INSTALLATION For the installation of 2 or more boilers in cascade up to a maximum of 4 boilers.

Available kits:

− cod. 26164LP

Hydraulic manifold kit for 2 boilers in cascade installation

− cod. 26163LP Hydraulic manifold kit for 1 additional boiler in cascade installation

Hydraulic manifold kits are complete with:

− isolating valves: to guarantee ease of maintenance/service or a temporary exclusion of only 1 boiler without interrupting the cascade installation operation;

− non-return valve: for each individual boiler to avoid any circulation while the boiler is OFF;

− strainer: to protect the boiler from eventual obstruction created by impurities of the hydraulic circuit;

Every hydraulic manifold Kit includes: Strainer Isolating valves Heating flow vertical connector Ø1”1/2 Heating return vertical connector Ø1”1/2 Heating flow manifold DN 65 PN6 Heating return manifold DN 65 PN6 Non-return valve Ø1”1/2

HYDRAULIC COMPENSATOR KIT – DN150 cod. 26116LP The use of a compensator is recommended when, in the same hydraulic system, there is a primary circuit (with its own pump) and a secondary circuit with one or more circulating pumps. The compensator will negate situations whereby the different pumps of the circuit will interact one with another creating abnormal flow variations. The compensator will create a low pressure loss zone so that the primary circuit (of the boiler) will become independent from the secondary circuit to guarantee flexibility of installation and on systems with several pumps, high flow rates and high pump heads. In this case the individual circuit head is controlled and determined by the performance/head of individual pumps.

The Kit includes: 1. Hydraulic compensator (DN150) with DN 65 PN 6

connections; 2. Washer for flange PN 6; 3. Automatic air vent; 4. heating flow temperature sensor socket 5. filling loop connection (gb) – 5- heating system filling point (int); 6. drain tap;

cod. 26164LP

DN65

DN65

DN65

DN65

12

3

2

2

2

4

5

cod. 26116LP

cod. 26163LP

hydraulic accessories - manifold cascade + storage cylinder installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

20

HYDRAULIC MANIFOLD KIT FOR CASCADE INSTALLATION + 3-WAY VALVE FOR DHW STORAGE CYLINDER CONNECTION For the installation of 2 or more boilers in cascade up to a maximum of 4 boilers. It is possible to connect 1 boiler to a remote storage cylinder for the domestic hot water production.

− cod. 26167LP Hydraulic manifold kit for 2 boilers in cascade installation + 3-way valve kit fitted for D.H.W. storage cylinder connection.

Hydraulic manifold kits are complete with:

− isolating valves: to guarantee ease of maintenance/service or a temporary exclusion of only 1 boiler without interrupting the cascade installation operation;

− non-return valve: for each individual boiler to avoid any circulation while the boiler is OFF;

− strainer: to protect the boiler from eventual obstruction created by impurities of the hydraulic circuit;

− 3-way valve: for the dhw storage cylinder connection;

The kit includes: Strainer Isolating valves Heating flow vertical connector Ø1”1/2 Heating return vertical connector Ø1”1/2 Heating flow manifold DN 65 PN6 Heating return manifold DN 65 PN6 Non-return valve Ø1”1/2 3-way valve (to feed the dhw production circuit)

cod. 26167LP

flue manifold – accessories flue kit options for individual boiler installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

21

The RK 50 boiler is approved for both an indoor installation (boiler room or other) with or without modular box units or outdoor installation in modular box units.

The manufacturer recommends the use of Radiant original parts and accessories.

Individual boiler installation: a wide choice of flue kit option for the exhaust of combustion products into a flue duct or directly outside according to local regulations.

Flue kits and parts are in polypropylene material (for coaxial type flue kits, the inner pipe is in polypropylene, the outer pipe is in aluminium) to guarantee the highest mechanical resistance to the chemical action of the condensate and an easy installation.

kit AK50 Flue Kit – Horizontal-coaxial Ø125/80

code: 82109LP

Maximum Flue length: 5 metres

kit FK50 Flue Kit – vertical single pipe Ø80

code: 82106LP

Maximum Flue length: 3 metres

kit CK50 Flue Kit – vertical-coaxial Ø125/80

code: 82112LP

Maximum Flue length: 5 metres

kit EK50 Flue Kit – single pipe Ø80

code: 82107LP

Maximum Flue length: 5 metres

flue manifold – accessories flue kit options for individual boiler installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

22

Installation dimensions

Accessories

AK

50

CK

50

EK 5

0

FK 5

0

code: 27088LA 45° FLUE BEND Ø125/80 MF EXTENSION KIT

(PP INSIDE)

code: 27089LA 90° FLUE BEND Ø125/80 MF EXTENSION KIT

(PP INSIDE)

code: 82118LA 1 MT. EXTENSION Ø125/80 MF (PP INSIDE)

code: 27055LA 90° FLUE BEND Ø80 MF EXTENSION KIT IN PP

code: 27056LA 45° FLUE BEND Ø80 MF EXTENSION KIT IN PP

code: 82090LP 1 MT. EXTENSION Ø80 MF IN PP

code: 27071LP ‘T’ CONNECTION KIT Ø80 IN PP W/TEST POINT

code: 82108LP CONDENSATE TRAP KIT Ø80 IN PP

AK 50

CK 50 EK 50

EK 50

flue manifolds - accessories flue kit options for cascade installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

23

FLUE MANIFOLDS

With cascade installation systems it is possible to discharge combustion emissions in only one flue duct using MK 50 flue manifold kit.

Available kits: :

kit MK50 – Flue manifold kit Ø125 in PP for 2 boilers in cascade installation – cod. 82103LP; kit SK50 – Flue manifold kit Ø125 in PP for 1 additional boiler in cascade installation – cod. 82104LP;

Flue manifold are in polypropylene material to guarantee the highest mechanical resistance to the chemical action of the condensate and an easy installation.

Each individual boiler can be connected to the main manifold through the appropriate connector equipped with a mechanical non-return damper to avoid a flow back of combustion products when one or more boilers are not in operation.

Flue manifold kit MK50 Ø125 in PP for 2 boilers in cascade installation Complete with water trap siphon, non-return damper and air intake terminal.

Flue manifold kit SK50 Ø125 in PP for 1 additional boiler in cascade installation Complete with non-return damper and air intake terminal

Extension kit for flue manifold Ø125 in PP (L = length)

code: 82103LP code: 82104LP code: 82113LP – L = 500 code: 82105LP – L = 1000 code: 82115LP – L = 2000

87° flue bend Ø125 MF extension kit in PP 45° flue bend Ø125 MF extension kit in PP

code: 82119LA code: 82120LA

cod. 82103LP

cod. 82104LP

flue accessories - manifolds ducting system for individual boiler installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

24

SYSTEM FOR A RIGID DUCTING Ø80 in PP material A rigid ducting system is suggested for the exhaust of combustion products through an existing chimney – flue duct – vertical openings/spaces that reach the top of the building (roof) of an adequate perimeter and designed for the passage of building technological systems.

code pos. Description 82133LA 1 FLUE TERMINAL 82134LA 2 CENTRING CLAMP – DIAL TYPE 82135LA 3 FIXING CLAMP 82136LA 4 EXTENSION M-F -(L=250) 82137LA 4 EXTENSION M-F -(L=500) 82138LA 4 EXTENSION M-F -(L=1000) 27071LA 5 ‘T’ CONNECTION M-M-F 82140LA 6 CLOSING PLATE 82108LA 7 CONDENSATE WATER TRAP 82142LA 8 SUPPORT BRACKET 82143LA 9 FROST PROTECTION PIPE 82144LA 10 COAXIAL PIPE WITH ROOF SLATE 82145LA 11 90° FLUE BEND M-F W/CLAMP 82146LA 12 CLOSING PLATE

flue accessories - manifolds ducting system for cascade installation RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

25

SYSTEM FOR RIGID DUCTING Ø125 in PP material A rigid ducting system is suggested for the exhaust of combustion products through an existing chimney – flue duct – vertical openings/spaces that reach the top of the building (roof) of an adequate perimeter and designed for the passage of building technological systems. The system is completely realised in polypropylene material (PP) and thanks to the simple male/female installation system it guarantees easy and secure installation. Centring elements supplied with the system guarantee the perfect centring and vertical run of the rigid pipe. In the presence of flue ducts/chimneys with a not perfect straight-line run it is recommended the use of a flexible pipe system.

code pos. Description 82105LP 1 EXTENSION Ø125 IN PP L=1000 82113LP 1 EXTENSION Ø125 IN PP L=500 82115LP 1 EXTENSION Ø125 IN PP L=2000 82116LA 2 INSPECTION PIPE Ø125 IN PP 82122LA 3 FLUE KIT SUPPORT CONNECTION Ø125 82123LA 4 CENTRING CLAMP Ø125 IN PP 82125LA 5 DUCT/CHIMNEY COVER Ø125 STAINLESS STEEL

1

4

4

3

2

1

5

system controls RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

26

CASCADE REGULATION SYSTEM The purpose of the installation of a modular condensing boiler is to have a system that supplies the precise heat

demand from the plant under any variability condition, while at the same able to satisfy and manage any type of

user. For this reason, the management of the RK 50 boiler, either standalone or in cascade formation is possible

through the use of a series of accessories aimed at optimising the climatic control of the heat generating plant while

making full use of the boiler output. SYSTEM CHARACTERISTICS:

Sequence control for up to a maximum of eight boilers. Used to manage, control and programme the operating sequence of the boilers connected to the cascade

installation. The sequence control can be preset and programmed by means of parameters that allow ideal

temperature conditions to be guaranteed at all times during the day and night, seven days a week, for both the

domestic hot water and central heating systems. In addition to being panel-mounted, the regulator can also be wall-mounted separately in its own housing.

management, regulation and control of the secondary central heating and domestic hot water circuits. The regulator manages:

- central heating: a direct circuit and a mixed circuit with control of the mixer valve and dedicated pumps. The

use of additional regulators allows the system to manage up to 15 mixed secondary circuits. - domestic hot water: a circuit feeding the domestic hot water production system with the option to add one or

more dedicated exclusive service boilers in the sequence. When there is a demand for domestic hot water, the

regulator will only activate the enabled boilers. operation programming and dedicated working curve regulation for each individual secondary circuit.

The installation of an outside sensor makes it possible to automatically reduce or increase the maximum flow

temperature of the system in line with the increase or decrease in the outside temperature in order to balance

the power supplied to the system. room temperature control through the installation of a zone regulator. The zone regulator only functions when coupled to the cascade regulator and allows easy programming and

display of the domestic hot water circuit parameters (timer programme, actual nominal temperature of the hot

water) and central heating circuit parameters (timer programme and required room temperature) for the central

heating plant in the user’s living area. It is thus possible to have continuous control over the central heating

system and as such optimise it. “CAN Bus” line for connecting the zone regulator and the additional modules to the cascade regulator enabling

management of up to 8 heater modules and 15 mixed circuits

remote system management with the option to programme and display all the specific parameters of the plant

remotely.

system controls RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

27

installation examples Individual boiler installation + D.H.W. storage cylinder

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

28

STO

RA

GE

CY

LIN

DE

R- D

.H.W

. TE

MPE

RAT

UR

E S

ENSO

Rco

de 3

1219

LA

RE

MO

TE L

CD

code

525

35LP

NO

TETH

ER

E IS

A S

TRA

INE

R O

N T

HE

HE

ATI

NG

CIR

CU

IT..

THE

INS

TALL

ATI

ON

OF

AN

AD

DIT

ION

AL

STR

AIN

ER

ON

TH

E

SE

CO

ND

AR

Y C

IRC

UIT

IS R

EC

OM

ME

ND

ED

.

OU

TDO

OR

TEM

PER

ATU

RE

SEN

SOR

- co

de 7

3506

LA

GAS

CO

ND

EN

SAT

E D

RA

IN

HE

ATI

NG

FL

OW

HEA

TIN

G

RET

UR

N

installation examples Individual boiler installation + D.H.W. storage cylinder

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

29

2

11

33

6

7

Zone

1Zo

ne 2

1

4

89

10 98

4

GA

S

Zone

2Zo

ne 1

7

6

33

5

211

12

5

CO

ND

EN

SA

TE

DR

AIN

CO

ND

EN

SA

TE

DR

AIN

GA

S

OU

TDO

OR

TE

MP

ER

ATU

RE

SE

NS

OR

OU

TDO

OR

TE

MP

ER

ATU

RE

SE

NS

OR

KEY

1R

K 5

0

2C

AS

CA

DE

REG

ULA

TOR

(E8.

4401

) co

d. 7

6691

LA+

HO

US

ING

FO

R W

ALL

INS

TALL

ATI

ON

(W

AG

2)co

d. 3

1281

LA3

ZON

E R

EG

ULA

TOR

(BM

)co

d. 7

6685

LA

43-

WAY

MIX

ING

VA

LVE

5

BO

ILE

R/M

AN

IFO

LD T

EM

PE

RA

TUR

E S

EN

SOR

KIT

(KF)

cod.

313

04LA

6

HE

ATI

NG

FLO

W T

EM

PE

RA

TUR

E S

ENSO

R (V

F)co

d. 3

1301

LA

7S

TOR

AG

E C

YLI

ND

ER

DH

W T

EM

PE

RAT

UR

E SE

NS

OR

KIT

(SP

F)co

d. 3

1303

LA

8P

UM

P F

OR

1S

T C

IRC

UIT

9P

UM

P F

OR

2S

T C

IRC

UIT

10P

UM

P F

OR

DH

W S

TOR

AG

E C

YLI

ND

ER

11O

UTS

IDE

TE

MP

ER

ATU

RE

SE

NSO

R (A

F)co

d. 3

1302

LA12

3-W

AY V

ALV

E

NO

TETH

ER

E IS

A S

TRA

INER

ON

TH

E H

EATI

NG

C

IRC

UIT

. TH

E IN

STA

LLAT

ION

OF

AN A

DD

ITIO

NAL

S

TRA

INER

ON

TH

E S

EC

ON

DAR

Y C

IRC

UIT

IS

REC

OM

ME

ND

ED.

installation examples cascade installation

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

30

FILL

ING

LO

OP

OU

TDO

OR

TE

MP

ER

ATU

RE

SEN

SO

R

KEY

1R

K 5

0

2C

ASC

ADE

RE

GU

LATO

R (E

8.44

01)

cod.

766

91LA

+ H

OU

SIN

G F

OR

WA

LL IN

STA

LLAT

ION

(W

AG2)

cod.

312

81LA

3ZO

NE

REG

ULA

TOR

(BM

)co

d. 7

6685

LA

43-

WA

Y M

IXIN

G V

ALVE

5

BOIL

ER

/MAN

IFO

LD T

EMP

ER

ATU

RE

SEN

SOR

KIT

(KF)

cod.

313

04LA

6

HEA

TIN

G F

LOW

TE

MP

ERAT

UR

E SE

NS

OR

(VF)

cod.

313

01LA

7

STO

RA

GE

CYL

IND

ER

DH

W T

EM

PER

ATU

RE

SEN

SOR

KIT

(SPF

)co

d. 3

1303

LA

8PU

MP

FO

R 1

ST C

IRC

UIT

9PU

MP

FO

R 2

ST C

IRC

UIT

10PU

MP

FOR

DH

W S

TOR

AGE

CYL

IND

ER11

OU

TSID

E T

EMPE

RA

TUR

E S

ENSO

R (A

F)co

d. 3

1302

LA

7

10

CO

ND

EN

SA

TE D

RA

IN

89

NO

TETH

ER

E IS

A S

TRA

INE

R O

N T

HE

HE

ATI

NG

CIR

CU

IT.

THE

INS

TALL

ATI

ON

OF

AN

AD

DIT

ION

AL

STR

AIN

ER

ON

TH

E

SE

CO

ND

AR

Y C

IRC

UIT

IS R

EC

OM

ME

ND

ED

.

GA

S

5

33

2

6

Zone

1Zo

ne 2

11

4

installation examples cascade installation + D.H.W. storage cylinder

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

31

7

89

5

33

2

6

11

4

KEY

1R

K 5

0

2C

AS

CA

DE

REG

ULA

TOR

(E8.

4401

) co

d. 7

6691

LA+

HO

US

ING

FO

R W

ALL

INST

ALL

ATI

ON

(W

AG

2)co

d. 3

1281

LA3

ZON

E R

EG

ULA

TOR

(BM

)co

d. 7

6685

LA

43-

WAY

MIX

ING

VA

LVE

5

BO

ILE

R/M

AN

IFO

LD T

EM

PER

ATU

RE

SEN

SO

R K

IT (K

F)co

d. 3

1304

LA

6H

EA

TIN

G F

LOW

TE

MP

ER

ATU

RE

SE

NS

OR

(VF)

cod.

313

01LA

7

STO

RA

GE

CY

LIN

DE

R D

HW

TE

MP

ER

ATU

RE

SE

NS

OR

KIT

(SPF

)co

d. 3

1303

LA

8P

UM

P F

OR

1S

T C

IRC

UIT

9P

UM

P F

OR

2S

T C

IRC

UIT

103-

WA

Y V

ALV

E11

OU

TSID

E T

EM

PE

RA

TUR

E S

EN

SO

R (A

F)co

d. 3

1302

LA

NO

TETH

ER

E IS

A S

TRA

INE

R O

N T

HE

HE

ATI

NG

C

IRC

UIT

. TH

E IN

STA

LLA

TIO

N O

F A

N A

DD

ITIO

NAL

S

TRA

INE

R O

N T

HE

SEC

ON

DA

RY

CIR

CU

IT IS

R

ECO

MM

END

ED.

OU

TDO

OR

TE

MPE

RA

TUR

E S

ENSO

R

Zone

1Zo

ne 2

GA

S

CO

ND

EN

SA

TE D

RA

IN

FILL

ING

LO

OP

installation examples cascade installation + mixing circuits

RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

32

4

Zone

n..1

5Zo

ne n

..15

33

7

108

9

NO

TETH

ER

E IS

A S

TRA

INER

ON

TH

E H

EAT

ING

CIR

CU

IT.

THE

INS

TALL

ATIO

N O

F A

N A

DD

ITIO

NAL

STR

AIN

ER

ON

TH

E S

ECO

ND

AR

Y C

IRC

UIT

IS

REC

OM

ME

ND

ED.

5

33

2

6

Zone

1Zo

ne 2

11

4

OU

TDO

OR

TE

MP

ER

ATU

RE

SEN

SOR

KEY

1R

K 5

0

2C

AS

CA

DE

RE

GU

LATO

R (E

8.44

01)

code

766

91LA

+ H

OU

SIN

G F

OR

WA

LL IN

STA

LLAT

ION

(W

AG2)

code

. 312

81LA

3ZO

NE

RE

GU

LATO

R (B

M)

code

766

85LA

4

3-W

AY

MIX

ING

VA

LVE

5

BO

ILE

R/M

AN

IFO

LD T

EM

PE

RA

TUR

E S

ENS

OR

KIT

(KF)

code

313

04LA

6

HE

ATI

NG

FLO

W T

EM

PE

RA

TUR

E S

ENS

OR

(VF)

code

313

01LA

7

STO

RA

GE

CY

LIN

DE

R D

HW

TE

MP

ERA

TUR

E S

EN

SOR

KIT

(SP

F)co

de 3

1303

LA

8P

UM

P F

OR

1S

T C

IRC

UIT

9P

UM

P F

OR

2S

T C

IRC

UIT

10P

UM

P FO

R D

HW

STO

RA

GE

CY

LIN

DE

R11

OU

TSID

E T

EMPE

RA

TUR

E S

EN

SOR

(AF)

code

313

02LA

12R

EG

OLA

TOR

E D

I MIS

CEL

AZI

ON

Eco

de 3

1302

LA

GA

S

CO

ND

EN

SA

TE D

RA

IN

FILL

ING

LO

OP

AD

DIT

ION

AL

CIR

CU

ITS

(UP

TO 1

5 M

IXIN

G C

IRC

UIT

S)

CE Approval RK 50 High Efficiency Condensing Wall Hung Boiler - Heating Only

33

RADIANT BRUCIATORI s.p.a. Via Pantanelli, 164/166 - 61025 Loc. Montelabbate (PU) Tel. +39 0721 9079.1 • fax. +39 0721 9079279

TA05E011.G0606

ALL DESCRIPTIONS AND ILLUSTRATIONS CONTAINED IN THIS LEAFLET HAVE BEEN CAREFULLY PREPARED BUT WE RESERVE THE RIGHT TO MAKE CHANGES AND IMPROVEMENTS IN OUR PRODUCTS WHITCH MAY AFFECT THE ACCURANCY OF THE INFORMATION CONTAINED IN THIS LEAFLET. E + OE ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED, SAVED IN STORAGE SYSTEMS OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, WHETHER ELECTRONIC, MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERS, WITHOUT THE MANUFACTURER'S PRIOR AUTHORISATION IN WRITING.