Open Module Sustainability

Energy, climate change and BSU

05 November 2013

Dr Julian Greaves

Sustainability –

What’s it all about and what are we doing about it?

05 November 2013

Sustainability – the root of economics

http://en.wikipedia.org/wiki/File:Sanzio_01_Plato_Aristotle.jpg

05 November 2013

Oiconomiamy friend

You wot?

Management of the resources of the household for the benefit of all

its members over the long term

05 November 2013

A business for the future

Mission Zero so far

• Cut Greenhouse Gas Emissions by 94%

• Cut fossil fuel use by 60%

• Cut waste by 80%

• Cut water use by 80%

05 November 2013

Mission Zero – Take nothing from the Earth that cannot be replaced by the Earth – Zero impact by 2020

Mission Zero so far

• Increased sales by 66%

• Doubled company earnings

• Increased profit margins

Business lessons from a radical industrialist – Ray C. AndersonISBN 978-0-312-54455-3

Why Energy Matters

• Fossil fuels, electricity and climate change

05 November 2013

Why energy matters - Electricity production from fossil fuels

05 November 2013

Electricity production

- 38% efficient

Grid electricity 0.54 kg CO2 kWh-1

(Natural gas – 0.19 kg CO2 kWh-1)

BSU NP 2012/13 – 2,316 MWh elec = 1,250 t CO2

So, What’s the problem with fossil fuels? – The greenhouse effect

05 November 2013

05 November 2013

05 November 2013

05 November 2013

05 November 2013

05 November 2013

Global warming impacts (some)

Sea level rise

Oceanic acidification

Changing rainfall patterns

Permafrost melting

Glacial retreat

Desertification

Forest fires

05 November 2013

Sea Level Rise

1 metre sea level rise

05 November 2013

Energy management:

A strategic approach

At BSU

05 November 2013

Management support

Behavioural change

Reduced emissions

Technological solutions

05 November 2013

Management support –Policy

Review –

Report progressPropose next

phase

Check –Monitor

performance

Do –

Implement technologies

and behaviour changes

Plan –Collect data

BaselineSurvey buildings

Set a targetMake a plan

Plan

Baseline (2005-2008) – 4,000 tonnes CO2 / y

05 November 2013

Survey the Estate

05 November 2013

Apply the Energy Hierarchy

Loft and wall insulationPipe lagging

Draught proofingBMS control settings

Efficient boilersSmart lighting

Super low loss transformers

Biomass heatingSolar PVWind?

Set a target

05 November 2013

• Target – 2,000 tonnes CO2 / y

• By 2020

• 50% reduction

05 November 2013

Make a plan

0

1000

2000

3000

4000

5000

Baseline prj Yr 1 prj Yr 2 prj Yr 3 prj Yr 4 prj Yr 5 prj Yr 6 prj Yr 7 prj Yr 8 prj Yr 9 prj Yr 10 prj Yr 11 Target

Ton

ne

s C

O2

Where we started

How do we get there?

Where we want to be

Do

• Lagged boiler room flanges

• Insulated walls and roofs

• Draught-proofed buildings

• Upgraded the BMS

• Efficient boilers

• Small power control

• District heating

• Woodchip boilers

• Solar PV

05 November 2013

05 November 2013

0

1000

2000

3000

4000

5000

Baseline prj Yr 1 prj Yr 2 prj Yr 3 prj Yr 4 prj Yr 5 prj Yr 6 prj Yr 7 prj Yr 8 prj Yr 9 prj Yr 10 prj Yr 11 Target

Ton

nes

CO

2

Check

05 November 2013

Review

0

1000

2000

3000

4000

5000

Baseline prj Yr 1 prj Yr 2 prj Yr 3 prj Yr 4 prj Yr 5 prj Yr 6 prj Yr 7 prj Yr 8 prj Yr 9 prj Yr 10 prj Yr 11 Target

Ton

nes

CO

2

Business as Usual

05 November 2013

Electricity

05 November 2013

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

4,500,000

2008/09 2009/10 2010/11 2011/12 2012/13

Newton Park

Bath Spa Uni

BSU 16%

NP 19%

£65k annual cost

reduction

Gas

05 November 2013

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

9,000,000

2008/09 2009/10 2010/11 2011/12 2012/13

Newton Park

Bath Spa Uni

BSU 37.6%

NP 28.4%

£100k annual cost reduction

Carbon

05 November 2013

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

2008/09 2009/10 2010/11 2011/12 2012/13

Newton Park

Bath Spa Uni

BSU 21.5%

NP 19.6%

Thank you