STEERING COMMITTEE MEETING # 5

SEPTEMBER 18, 2018

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

Introduction1.

2.

3.

4.

Market Conditions

Preliminary Development Concepts

Open Discussion

STEERING COMMITTEE MEETING #5 AGENDA

5. Next Steps

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

Open Discussion

Next Steps

Visualize

Stadium DistrictMaster Plan

Strategize Realize

Public Meetings

Steering Committee Meetings

Month MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY

Steering Committee Meeting #5September 18th

PLANNING PROCESS

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

PLANNING PROCESS

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

STUDY AREA

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

• Seamless Connections

Neighborhood Connections

Economic Connections

Mobility Connections

PUBLIC & STEERING COMMITTEE INPUT

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

• Seamless Connections

Neighborhood Connections

Economic Connections

Mobility Connections

• Better Ways to Move to &Move Through

Pedestrian Priority/Walkability

North/South Connections

East/West Connections

Access to and from Light Rail

Healthy Ways to Move

PUBLIC & STEERING COMMITTEE INPUT

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

FUNCTIONAL FRAMEWORK PLAN

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

MOBILITY FRAMEWORK PLAN

N 0

N.T.S.

200’ 600’400’

Goals• Better connect to surrounding

neighborhoods

• Increase multimodal transportation options

• Create a walkable neighborhood

• Provide access to natural resources and public space

Potential Open Space

Existing Streets

Potential Streets

Water Boundary

Legend

Existing Downtown Street Connections

Existing Light Rail

Parks

STUDY AREA

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

POTENTIAL ROAD NETWORK

Water Boundary

Legend

Existing Streets

Potential StreetsN 0

N.T.S.

200’ 600’400’

Existing Light Rail

Parks

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Objectives• Utilize existing road network to contin-

ue connections through the plan area

• Provide additional north/south and east/west connections

• New connections should include a variety of street types that prioritize pedestrians and bicyclists

Stadium

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

POTENTIAL PEDESTRIAN NETWORK

Potential Pedestrian Connections

Water Boundary

Legend

Existing Light Rail

Parks

Existing Pedestrian ConnectionsN 0

N.T.S.

200’ 600’400’

Objectives• Enhance connections to and

from light rail stops

• Provide additional connection under W. Colfax Ave.

• Provide additional connections to the South Platte River

• Improve important intersectionsW. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

2.

3.

4.

Market Conditions

Preliminary Development Concepts

Open Discussion

5. Next Steps

1. Introduction

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

Open Discussion

Next Steps

COMMUNITY INPUT / SUPPORT

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

METROPOLITAN FOOTBALL STADIUM DISTRICT SITE ATTRIBUTES

• Transit Oriented Development •Access to two (2) light rail stations via two (2) separate rail lines• Access – The most accessible site in the Metro area• Natural Path of Development – Extension of Downtown• Visibility/ Identity

• Access to Amenities: •Retail •Hotels •Entertainment •Outdoors! Four (4) Parks and the River •CBD •Game Day Event Center •Broncos Stadium at Mile High

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

DENVER MARKET: RELEVANT FACTS

• 3Q18 marks the 35th straight quarter of positive absorption in the office market

• Big coworking wave; currently over 2 MSF of coworking space in Denver, WeWork alone wants to be at 2 MSF in Denver

• Tech loves DT Denver (talent pool, quality of life) – relocations, startups & expansions

• Continued “flight to quality” despite cost – majority of absorption is in the Class A sector (2015-present)

• High demand for TOD/proximity to transit, in urban and suburban locations (most of DT is transit-accessible)

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

• Currently, three (3) large blocks of space over 100,000 SF in Downtown – All will be gone by the end of 2018

• Over the last seven (7) years, 16 buildings have been constructed and have an overall occupancy of 96%

• 9,942 Multi-Family Units completed since 2014. 13,700 Units under construction / proposed.

• Those units cannot accommodate the migration into Colorado

• 77,000 Net Migration to Colorado - 2017• Current vacancy of multi-family unit Downtown is less than

10%• Denver Hotel Occupancy is at 73.7%, almost eight (8)

points above the national average, while demand is 5.1% (compared to the national average of 2.1%)

DENVER MARKET: RELEVANT FACTS

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

Questions?

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

3.

4.

Preliminary Development Concepts

Open Discussion

5. Next Steps

1. Introduction

2. Market Conditions

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Activity Nodes

Connections

Intensity

Option 1 Option 2 Option 3PRELIMINARY DEVELOPMENT CONCEPTS

Existing Parks / Open Space

Legend

Proposed Event Space

South Platte River

Gameday Plaza

Pedestrian Plazas

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 1

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Activity Nodes

Connections

Existing Parks / Open Space

Legend

Proposed Event Space

South Platte River

Gameday Plaza

• Dispersed nodes of activity

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 1

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Activity Nodes

Connections

Intensity

Existing Parks / Open Space

Legend

Proposed Event Space

South Platte River

Gameday Plaza

Pedestrian Plazas

• Areas of intensity are organized around the activity nodes

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 1

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 1

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 2

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Activity Nodes

Connections

Existing Parks / Open Space

Legend

Proposed Event Space

South Platte River

Gameday Plaza

• Strong east west spine with signature plazas that connect to the river

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 2

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Activity Nodes

Connections

Intensity

Existing Parks / Open Space

Legend

Proposed Event Space

South Platte River

Gameday Plaza

Pedestrian Plazas

• The intensity is compatible with site topography and slope from high to low

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 2

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 2

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 3

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Activity Nodes

Connections

Existing Parks / Open Space

Legend

Proposed Event Space

South Platte River

Gameday Plaza

• Activity centers aligned in a strong north south configuration

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 3

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Activity Nodes

Connections

Intensity

Existing Parks / Open Space

Legend

Proposed Event Space

South Platte River

Gameday Plaza

Pedestrian Plazas

• Intensity organized along a strong north south spine

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 3

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

OPTION 3

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

2.

3.

4.

Market Conditions

Preliminary Development Concepts

Open Discussion

5. Next Steps

1. Introduction

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

Option 1 Option 2 Option 3GROUP DISCUSSION

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

W. COLFAX AVE.

FED

ERA

L B

LVD

.

I-25

I-25

Stadium

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

2.

3.

Market Conditions

Preliminary Development Concepts

5. Next Steps

1. Introduction

4. Open Discussion

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

Visualize

Stadium DistrictMaster Plan

Strategize Realize

Public Meetings

Steering Committee Meetings

Month MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY

Community Meeting #2October 30th, 2018

Denver Stadium West Conference Hall

PLANNING PROCESS

STADIUM DISTRICT MASTER PLANSTEERING COMMITTEE #5

Community Meeting #2October 30th, 2018

Denver Stadium West Conference Hall

Thank You for your Participation