Storm Sewer Pipe
Rehabilitation
Completed Storm Drainage
Maintenance Projects
South George Mason Drive
Pedestrian Bridge Repair
Mason District
Project #: WBS SD-000008-001
I/O 2G25-057-000
DESCRIPTION:
The Maintenance and Stormwater Management Division completed repairs to the South George Mason
Drive Pedestrian Bridge during the second half of FY 2013. The bridge hand rails were sanded, primed
and painted for long term finish. A concrete epoxy was also used to make repairs to the concrete deck
and piers to extend the life of the bridge as well as a deck finish was applied. The bridge maintenance
was completed with support of the Mason District Supervisors Office and the Virginia Department of
Transportation.
PROJECT OVERVIEW:
Fund No: 300-C30010 General Construction and Improvements
300-C30060 Walkway Improvements
Project No: WBS SD-000008-001
I/O 2G25-057-000
Project Name: South George Mason Drive Pedestrian Bridge Repair
Completion: 2nd Half FY 2013
District: Mason
Tax Maps: 062-3
Watersheds: Four Mile Run
DPWES PROJECT TEAM:
William Schell
Matthew Adams
Project Details
Project is located west of Leesburg
Pike on South George Mason Drive in
tax map grid 62-3 in the Mason District.
South George Mason
Project Location
South George Mason Pedestrian
Bridge Repair
Example Before and After Photos
Handrail Rusting (before) Handrail Rehabilitation (after)
Example Before and After Photos
Damage to Concrete Bridge Deck (left)
Concrete Repairs to Bridge Deck (right)
Example Before and After Photos
Before Painting: (below)
After Painting (below)
Example Before and After Photos
Bridge Pier Before Rehabilitation (below)
Bridge Pier After Concrete Patch and
Screen Replacement (below)
South George Mason Pedestrian
Bridge
For additional information, please call
Irene Haske, Public Information Officer
703-324-5821, TTY 711