WALDENWOOD LIFT STATION REPLACEMENT
SILVER LAKE WATER & SEWER
DISTRICT
SNOHOMISH COUNTY
WASHINGTON
G&O JOB #18510.01
MAY 2019
DISTRICT OFFICIALS
Curt Brees
General Manager
Rick Gilmore, P.E.
Bill Anderson Rod Keppler
District Engineer
Anne Backstrom
Commissioners
112T
H S
T S
E
51S
T A
VE
S
E
5
0
T
H
A
V
E
S
E
1
1
1
T
H
P
L
S
E
5
2
N
D
A
V
E
S
E
1
1
0
T
H
S
T
S
E
5
0
T
H
D
R
S
E
111TH ST
SE
WALDENWOOD
LIFT STATION
VIC
IN
IT
Y M
AP
, L
OC
AT
IO
N M
AP
,
GE
NE
RA
L N
OT
ES
A
ND
S
HE
ET
IN
DE
X
G-1
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SILVER LAKE AREA
VICINITY MAP
GENERAL NOTES:
LOCATION MAP
PROJECT
LOCATION
OWNER/APPLICANT:
ENGINEER:
OWNER'S CERTIFIED EROSION CONTROL SPECIALIST:
SITE ADDRESS:
GEOTECHNICAL ENGINEER:
SHEET INDEX
SHEET NO. DESCRIPTION
SHEET INDEX
SHEET NO. DESCRIPTION
PUMP STATION DESIGN CRITERIA
SHEET INDEX
SHEET NO. DESCRIPTION
AB
BR
EV
IA
TIO
NS
, G
EN
ER
AL
S
YM
BO
LS
, S
YM
BO
L
LE
GE
ND
, N
UM
BE
RIN
G S
YS
TE
M A
ND
G
EN
ER
AL
N
OT
ES
G-2
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
NEWEXISTING
GENERAL SYMBOLS
ABBREVIATIONS
SYMBOL LEGEND
DRAWING TITLE
EXAMPLE OF SECTION NUMBERING SYSTEM AND
PLAN/DRAWING TITLES
SECTION
SU
RV
EY
D
AT
A
G-3
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SURVEY CONTROL POINTS
SURVEY CONTROL POINTS
Horizontal Datum: NAD83/2011 (MODIFIED GROUND COORDINATES)
W.S.P.C.S. NORTH ZONE, AVG CFG = 0.99994033554
Vertical Datum: NAVD88
POINT NORTHING EASTING ELEV. DESCRIPTION
RIGHT-OF-WAY DISCLAIMER
5/13
/19
G-4
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
TESC CONSTRUCTION SEQUENCE
1. ATTEND PRE-CONSTRUCTION MEETING.
2. INSTALL CATCH BASIN PROTECTION.
3. INSTALL PERIMETER PROTECTION (SILT FENCE, NPGA AREAS, BRUSH BARRIER, ETC.)
4. CONDUCT SITE CLEARING AND GRADING.
5. INSTALL DRAINAGE FACILITIES AND OTHER UTILITIES.
6. COMPLETE PROJECT PER THE PROJECT PLAN
7. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH LOCAL JURISDICTION
REQUIREMENTS AND MANUFACTURER'S RECOMMENDATIONS.
8. RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES, OR INSTALL
NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT
CONTROL IS ALWAYS IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
9. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN TWO DAYS BETWEEN
OCTOBER 1ST AND APRIL 30TH OR SEVEN DAYS BETWEEN MAY 1ST AND SEPTEMBER 30TH.
10. STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE.
11. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
12. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE
TEMPORARY BMPS.
DEWATERING PLAN
DEWATERING DISCHARGE
CONTRACTOR SHALL DESIGN, PROVIDE, INSTALL, OPERATE AND MANAGE DEWATERING DISCHARGE
FACILITIES TO ACCOMMODATE THE ENCOUNTERED FLOWS IN A MANNER THAT WILL PREVENT EROSION.
THE CONTRACTOR SHALL NOT ALLOW THE WATER DISCHARGED FROM ANY DEWATERING SYSTEM
WELLS OR SUPPLEMENTAL WATER CONTROL SYSTEMS (I.E. SUMPS) TO DEGRADE THE WATER QUALITY
OF ANY RECEIVING WATERS.
THE DEWATERING DISCHARGE SYSTEM SHALL OPERATE SUCH THAT WATER PUMPED DURING
DEWATERING OPERATIONS IS DISCHARGED TO ADJACENT LANDS FOR INFILTRATION AND/OR
CONTROLLED OVERLAND FLOW. THE SYSTEM SHALL DISPOSE OF WATER SO AS NOT TO CAUSE
DAMAGE TO PUBLIC OR PRIVATE PROPERTY, TO CAUSE EXCEEDANCES OF WATER QUALITY STANDARDS
OR TO CAUSE A NUISANCE OR MENACE TO THE PUBLIC.
ALL DEWATERING DISCHARGE POINTS SHALL BE A MINIMUM OF 100 FEET FROM ANY CREEK OR DITCH.
CONTRACTOR SHALL OBTAIN ACCESS PERMISSION FROM PRIVATE PROPERTY OWNERS FOR ANY
DISCHARGE.
THE DEWATERING DISCHARGE SYSTEM SHALL MAINTAIN WATER QUALITY STANDARDS FOR SURFACE
WATERS BY PERFORMING IN COMPLIANCE WITH CHAPTER 173-201A WAC, WATER QUALITY STANDARDS
FOR SURFACE WATERS OF THE STATE OF WASHINGTON, AND ALL REQUIRED PERMITS, INCLUDING BUT
NOT LIMITED TO THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT FOR
CONSTRUCTION ACTIVITY.
THE CONTRACTOR SHALL INSTALL, OPERATE, AND MAINTAIN A WATER TREATMENT SYSTEM TO PROVIDE
FOR SETTLING, FILTRATION (IF NEEDED) AND REMOVAL OF SUSPENDED SOLIDS IN THE DISCHARGE
FROM THE DEWATERING SYSTEM.
THE DISCHARGE SYSTEM MAY CONSIST OF ANY COMBINATION OF CONVEYANCE PIPING, VISQUEEN
PADS, FILTER BAGS, DRIP IRRIGATION, SLOTTED OR PERFORATED DISCHARGE PIPING, SPRAY
IRRIGATION, OR OTHER MEANS TO APPLY THE WATER OVER A LARGE AREA AT LOW VELOCITY, IN SUCH
A MANNER AS TO CAUSE NO EROSION, REMOVAL OF TOPSOIL, OR VIOLATION OF WATER QUALITY
STANDARDS IN THE RECEIVING WATERS.
CONTRACTOR SHALL ADD OR MOVE DISCHARGE COMPONENTS AS NEEDED TO ENSURE NO OVERLAND
FLOW CAUSES SOIL EROSION, LEAVES THE PROJECT SITE, ENTERS THE ADJACENT PROPERTIES OR
ROADWAYS, ENTERS THE ACTIVE CONSTRUCTION AREA, OR CAUSES A VIOLATION OF WATER QUALITY
STANDARDS IN THE RECEIVING WATERS.
CONTRACTOR SHALL PROVIDE SUFFICIENT DISCHARGE TUBING, FILTER BAGS, OR OTHER DISCHARGE
SYSTEMS TO POTENTIALLY APPLY WATER OVER AS MUCH AREA AVAILABLE FOR DISCHARGE AS
NEEDED, IF REQUIRED, TO ALLOW SUFFICIENT INFILTRATION TO MITIGATE EROSION ISSUES.
FILTER BAGS SHALL BE OF SUFFICIENT NUMBER, SIZE, AND CAPACITY TO HANDLE ANTICIPATED FLOW
RATES, AND MUST BE INSPECTED, MAINTAINED, AND REPLACED WHEN FULL OR DAMAGED. SLOTTED OR
PERFORATED DRAIN PIPE, IF USED, MUST BE DESIGNED TO DISCHARGE ALONG THE ENTIRE LENGTH AT
EQUAL PRESSURES.
DISCHARGE TREATMENT
THE CONTRACTOR SHALL PROVIDE TREATMENT OF THE DISCHARGE INCLUDING SUFFICIENT SEDIMENT
SETTLING CAPACITY (PONDS, STORAGE TANKS, ETC.) TO ENSURE DISCHARGE DOES NOT EXCEED
TURBIDITY STANDARDS AT THE RECEIVING WATERS; AND 10 PPM SUSPENDED SOLIDS (SILT, SILICA,
SEDIMENT ETC.) AS MEASURED USING A ROSSUM SAND TESTER IMMEDIATELY PRIOR TO DISCHARGE TO
THE DESIGNATED DISCHARGE AREA.
THE DEWATERING DISCHARGE TREATMENT SYSTEM SHALL INCLUDE ANY STORAGE TANKS, PLUMBING,
PUMPS, FILTRATION SYSTEMS, OTHER EQUIPMENT, APPURTENANCES, AND RELATED WORK TO
PERFORM THE FUNCTION OF WATER TREATMENT.
DISCHARGE MONITORING
THE CONTRACTOR'S EROSION CONTROL SPECIALIST SHALL ANALYZE DISCHARGE FOR TURBIDITY
HOURLY DURING THE FIRST FOUR HOURS OF TESTING, DAILY DURING FIRST WEEK, WEEKLY
THEREAFTER, AND AFTER ANY RAINFALL EVENT EXCEEDING 0.25 INCHES PER DAY, WITH A FIELD
TURBIDITY METER USING STANDARD METHOD 2130 (STANDARD METHODS FOR THE EXAMINATION OF
WATER AND WASTEWATER). THE CONTRACTOR SHALL MEASURE TURBIDITY AT ALL DISCHARGE POINTS
TO RECEIVING WATERS OR WETLANDS, AND BACKGROUND. TURBIDITY SHALL BE CALCULATED AS THE
AVERAGE (MEAN) FOR ANY NUMBER OF SAMPLES. THE NUMBER AND TIMING OF SAMPLES SHALL BE
THE SAME FOR EACH SAMPLING STATION (I.E., BACKGROUND AND DISCHARGE POINTS). THE
CONTRACTOR SHALL PROVIDE ADDITIONAL TREATMENT PRIOR TO DISCHARGE, AS NECESSARY, TO
MEET THE DISCHARGE LIMITS.
THE CONTRACTOR SHALL VISUALLY INSPECT THE DISCHARGE SYSTEM DAILY FOR SYSTEM OPERATION,
OVERLAND FLOW, EROSION, AND TURBIDITY THROUGHOUT THE TESTING.
THE CONTRACTOR SHALL SUBMIT WEEKLY MONITORING REPORTS TO THE OWNER'S DESIGNATED
REPRESENTATIVE DOCUMENTING THE REQUIREMENTS HEREIN.
EROSION RISK ASSESSMENT
FACTORS ANTICIPATED TO CREATE RISK OF EROSION THROUGHOUT THE PROJECT INCLUDE EXPOSURE OF EXCAVATED SOILS
TO RAINFALL AND DISTURBANCE OF THE PROJECT SITE BY HEAVY EQUIPMENT. HEAVY RAINFALL CAN ERODE SOILS AND LEAD TO
TRANSPORT OF SEDIMENTS OVERLAND, THROUGH OPEN SEWER OR STORM PIPES AS THEY ARE CONSTRUCTED, OR IN
DRAINAGE DITCHES. DEWATERING OF THE TRENCHES AND LIFT STATION EXCAVATION WILL ALSO CREATE A RISK OF SEDIMENT
TRANSPORT, RELATIVE TO THE AMOUNT OF WATER THAT MUST BE REMOVED. THE SOURCES OF WATER FOR DEWATERING
INCLUDE RAINFALL, STORMWATER FLOW, AND GROUNDWATER FLOW.
SWPPP TEMPORARY EROSION CONTROL NOTES
1. NON-COMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER QUALITY REQUIREMENTS AND CLEARING LIMITS
VIOLATIONS MAY RESULT IN A TEMPORARY STOP-WORK ORDER UNTIL SAID EROSION CONTROL MEASURES ARE FUNCTIONAL.
2. CLEARING LIMITS SHALL BE ESTABLISHED FIRST THEN EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPS) SHALL BE
INSTALLED PRIOR TO ANY SITE DISTURBANCE. THE EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE CONSTRUCTED
PRIOR TO ANY GRADING OR EXTENSIVE LAND CLEARING IN ACCORDANCE WITH THE APPROVED CONSTRUCTION STORM
WATER POLLUTION PREVENTION PLAN (SWPPP). THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL
CONSTRUCTION AND LANDSCAPING IS COMPLETED, THE PERMANENT VEGETATIVE COVER IS ESTABLISHED AND THE
POTENTIAL FOR ON-SITE EROSION HAS PASSED.
3. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS DURING CONSTRUCTION EXCAVATION AND FILL OPERATIONS.
MATERIAL SHALL BE REMOVED FROM THE STREETS BY SWEEPING. PAVED SURFACES MUST BE CLEANED AT THE END OF
EACH DAY.
4. SEDIMENT CONTROL FACILITIES SHOWN ON THESE PLANS SHALL BE INSTALLED AS PART OF THE PLAN TO REMOVE SEDIMENT
FROM THE WATER BEFORE CLEARING AND GRADING IS ALLOWED. THIS MAY INCLUDE SEDIMENT PONDS, SILT FENCES,
SWALES, CHANNELS, BERMS, BARRIERS AND OTHER MEASURES. SEE THE CONSTRUCTION SEQUENCE FOR ORDER OF
INSTALLATION.
5. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES, UNLESS INCONSISTENT WITH SAFETY OR SITE
CONSTRAINTS.
6. THE CONSTRUCTION PLANS INDICATE INSTALLATION OF BEST MANAGEMENT PRACTICES (BMPS) TO RETAIN ALL SEDIMENT ON
SITE. ADDITIONAL MEASURES ARE NORMALLY NEEDED TO REMOVE TURBIDITY AND MEET WATER QUALITY STANDARDS.
DURING CONSTRUCTION, THE CONTRACTOR SHALL INSTALL SUCH ADDITIONAL COUNTY APPROVED BMPS AS MAY BE
REQUIRED, E.G. BAKER TANKS OR OTHER SEDIMENTATION FACILITIES, TO PREVENT SEDIMENT OR TURBID WATER FROM
LEAVING THE SITE. THE CONTRACTOR MAY CONTACT THE DESIGN ENGINEER (OR THE OWNER'S DESIGNATED EROSION
CONTROL PERSON) FOR GUIDANCE ON ADDITIONAL MEASURES.
7. STABILIZE ALL EXPOSED AND NON-WORKED SOIL.
8. FROM MAY 1 TO SEPTEMBER 30 NO UN-WORKED SOIL MAY REMAIN EXPOSED FOR MORE THAN 7 DAYS.
9. COVER DENUDED AREAS AS SPECIFIED ON THE PLANS BY APPROPRIATE COVER BMPS (SUCH AS MULCH, SOD, AND STRAW).
WHERE STRAW MULCH IS REQUIRED, IT SHALL BE APPLIED A MINIMUM OF 2".
10. COVER MATERIAL SHALL BE STOCKPILED ON SITE.
11. SOIL STOCKPILES SHALL BE STABILIZED AND PROTECTED WITH SEDIMENT RETENTION BMPS WITHIN 24 HOURS.
12. GRADING AND CONSTRUCTION SHALL BE TIMED AND CONSTRUCTED IN STAGES TO MINIMIZE SOIL EXPOSURE.
CONSTRUCTION SHALL BE TIMED TO RECOGNIZE CONDITIONS CREATED BY THE WEATHER.
13. FROM OCTOBER 1 TO APRIL 30 NO UN-WORKED SOIL MAY REMAIN EXPOSED FOR MORE THAN 2 DAYS.
14. AN ESTABLISHED GROUND COVER THAT FULFILLS THE REQUIREMENT OF THE APPROVED CONSTRUCTION PLANS IS
REQUIRED FOR ACCEPTANCE BY THE COUNTY WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL.
a. ALL AREAS TO BE SEEDED SHALL BE CULTIVATED BY DISKING, RAKING, HARROWING OR OTHER ACCEPTABLE MEANS.
b. PERFORM ALL CULTIVATING ACROSS OR AT RIGHT ANGLES TO THE SLOPE.
c. COVER THE SITE WITH MULCH, TOPSOIL OR OTHER SOIL AMENDMENTS.
d. IF NECESSARY, SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKE/SWALES,
LEVEL SPREADERS, AND SEDIMENT BASINS SHALL BE INSTALLED PRIOR TO SEEDING.
e. IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETATION (CONSISTING OF RAPID, PERSISTENT AND
LEGUME) WILL BE APPLIED (MINIMUM 80# PER ACRE), UNLESS OTHERWISE NOTED AS A WETLAND RESTORATION AREA
OR OTHERWISE APPROVED FOR ALTERNATIVE LANDSCAPING TREATMENT. THIS IS TO INCLUDE THE FOLLOWING: 60%
3-WAY PERENNIAL RYE GRASS BLEND, 25% CHEWING FESCUE, 15% CREEPING FESCUE. NO CLOVER OR NOXIOUS
WEEDS WILL BE PERMITTED.
f. FERTILIZER SHALL BE APPLIED AT 400# PER ACRE OF 10-20-20 (10 POUNDS PER 1100 SQUARE FEET) OR EQUIVALENT.
DEVELOPMENTS ADJACENT TO WATER BODIES SHALL USE NON-PHOSPHORUS FERTILIZER.
15. UNLESS IN A WETLAND RESTORATION AREA OR AN AREA APPROVED FOR ALTERNATIVE LANDSCAPING TREATMENT, ALL
DISTURBED AREAS SHALL BE SEEDED WITH A PERENNIAL GROUND COVER USING AN APPROVED HYDROSEEDER OR AS
OTHERWISE APPROVED BY THE OWNER.
16. PROTECT CUT AND FILL SLOPES FROM EROSIVE FLOWS AND CONCENTRATED FLOWS UNTIL PERMANENT COVER AND
DRAINAGE CONVEYANCE SYSTEMS ARE IN PLACE.
17. INSTALL INLET PROTECTION ON ALL STORM DRAIN INLETS DURING CONSTRUCTION SO THAT SEDIMENT AND SILT LADEN
WATER IS FILTERED OR TREATED TO MINIMIZE SEDIMENT THAT ENTERS THE INLET.
18. CHANNELS, DITCHES, SWALES AND OTHER CONVEYANCE SYSTEMS SHALL BE STABILIZED TO PREVENT EROSION DURING AND
AFTER CONSTRUCTION. INSTALL OUTLET PROTECTION FOR ALL CULVERTS.
19. FOLLOW THE SPECIFIC REQUIREMENTS ON THE PLAN TO CONTROL POLLUTANTS DURING CONSTRUCTION. THE CONTRACTOR
AND OWNER SHALL DEVELOP ON GOING PLANS TO CONTROL POLLUTANTS GENERATED DURING CONSTRUCTION, INCLUDING
WASTE MATERIALS AND DEMOLITION DEBRIS. THIS INCLUDES MAINTENANCE OF CONSTRUCTION EQUIPMENT, FERTILIZERS,APPLICATION OF CHEMICALS, AND WATER TREATMENT SYSTEMS. THE PLANS SHALL BE UPDATED TO RESPOND TO SITE
EXPOSURE AND WEATHER CONDITIONS.
20. THE WATER FROM DE-WATERING SYSTEMS FOR TRENCHES, VAULTS AND FOUNDATIONS SHALL BE DISCHARGED INTO A
CONTROLLED SYSTEM OR SEDIMENT RETENTION BMP (I.E. BAKER TANK). ADDITIONAL MEASURES ARE NEEDED TO REMOVE
TURBIDITY AND MEET WATER QUALITY STANDARDS. UNFILTERED WATER MUST NOT BE RELEASED INTO SENSITIVE AREAS
SUCH AS WETLANDS OR DESIGNATED NGPA AREAS.
21. THE OWNER AND CONTRACTOR ARE RESPONSIBLE FOR WATER QUALITY AS FURTHER DEFINED IN THE PROJECT
SPECIFICATIONS. THE CONTRACTOR'S CERTIFIED EROSION CONTROL SPECIALIST SHALL BE RESPONSIBLE FOR INSPECTION
AND THE WATER QUALITY MONITORING PROGRAM AND SHALL REPORT TO THE OWNER AS REQUIRED.
22. THE CONSTRUCTION EROSION CONTROL BMPS SHALL BE INSPECTED AFTER EACH SIGNIFICANT RAIN EVENT. MAINTENANCE
SHALL BE PERFORMED AS NEEDED TO MAINTAIN THE PERFORMANCE AND FUNCTION.
a. SILT BARRIERS AND SEDIMENT PONDS (IF USED) SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT
LEAST DAILY DURING PROLONGED RAINFALL.
b. NECESSARY REPAIRS TO BARRIERS, CHANNELS, AND PONDS (IF USED) OR REPLACEMENT SHALL BE ACCOMPLISHED
PROMPTLY.
c. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL FROM SILT BARRIERS AND CHECK DAMS.
d. WHEN THE SEDIMENT REACHES THE CLEAN OUT LEVEL IN A SEDIMENT POND, IT SHALL BE REMOVED AND PROPERLY
DISPOSED. DEPOSITS MUST BE REMOVED WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY ONE-THIRD
THE HEIGHT OF THE BARRIER, CHECK DAM OR OTHER CATCHMENT.
e. IF USED, THE EMBANKMENT OF SEDIMENT BASINS SHALL BE CHECKED REGULARLY TO INSURE THAT IT IS
STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT.
f. THE EMERGENCY SPILLWAY OF A SEDIMENT POND SHALL BE CHECKED REGULARLY TO INSURE THAT ITS LINING IS
WELL ESTABLISHED AND EROSION-RESISTANT.
g. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO
CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED.
SWPPP EROSION CONTROL PLAN
(THIS PLAN MAY BE REVISED BY THE EROSION CONTROL SPECIALIST TO MEET FIELD CONDITIONS, IF NECESSARY.)
1. EROSION PROBLEM AREAS
a. THERE ARE CURRENTLY NO KNOWN EROSION PROBLEM AREAS ON SITE. HOWEVER, EROSION IS A POSSIBILITY DURING CONSTRUCTION. THE RISK OF
EROSION IN THIS AREA MAY BE MITIGATED THROUGH THE USE OF PROPER BEST MANAGEMENT PRACTICES AS DESCRIBED BELOW. SINCE RAINFALL ON THE
SITE IS LIKELY TO BE A PRINCIPAL CAUSE OF EROSION, THE RISK OF EROSION WILL BE REDUCED BY SCHEDULING EARTHWORK FOR THE DRY SUMMER
SEASON.
b. IF THIS PROJECT CONTINUES INTO THE WINTER SEASON, THE FOLLOWING WET WEATHER PRECAUTIONS WILL BE PRACTICED.
i. PREVENTION OF TRACKING MUD ONTO ROADS THROUGH THE USE OF EQUIPMENT SWEEPING ONSITE.
ii. EXPOSED PORTIONS OF THE SITE SHALL BE ADEQUATELY COVERED BY STRAW OR OTHER MATERIAL BASED UPON THE WEATHER. STRAW OR
APPROVED EQUIVALENT MATERIAL SHALL ALWAYS BE AVAILABLE ON SITE AND READY TO USE. EXPOSED AREAS SHALL BE ADEQUATELY COVERED
WHEN RAINING AND AT THE END OF THE DAY IF THE NEXT DAY IS A "NON-WORKING" DAY. WEATHER FORECASTS SHALL BE USED TO GOVERN
WHETHER WORK WILL COMMENCE OR STOP FOR THE DAY.
iii. ALL SITE WORK GENERATING EXPOSED SOIL (WITH THE EXCEPTION OF INSTALLATION AND MAINTENANCE OF EROSION CONTROL BMPS) SHALL CEASE
DURING WEATHER CONDITIONS WHEN RAIN GENERATES RUNOFF AND CAUSES EROSION.
iv. IF NECESSARY, EARTHWORK SHALL BE PHASED TO MINIMIZE AREAS OF EXPOSED SOIL.
v. THE CONTRACTOR SHALL DEVISE A MAINTENANCE AND INSPECTION SCHEDULE WITH AN IDENTIFIED EROSION CONTROL SPECIALIST RESPONSIBLE
FOR THESE ITEMS.
vi. AN EROSION CONTROL SPECIALIST SHALL BE PRESENT OR ON-CALL THROUGHOUT THE PROJECT DURATION TO INSURE THE BMPS ARE WORKING
APPROPRIATELY AND ARE WELL MAINTAINED. THE SPECIALIST SHALL MONITOR THE DISCHARGE FROM THIS SITE AFTER EACH STORM EVENT THAT
GENERATES RUNOFF. THEY SHALL ALSO CONDUCT SITE INSPECTION REPORTS ON THE INSTALLED BMPS. THESE REPORTS SHALL BE AVAILABLE ON
SITE AND PROVIDED TO THE OWNER ON A MONTHLY BASIS AND WHEN REQUESTED. THE MONITORING SHALL BE DONE IN A PROFESSIONAL MANNER
CONSISTENT WITH CURRENT SAMPLING PROTOCOLS AND REPORTING REQUIREMENTS.
vii. VEGETATED BUFFERS AND CRITICAL AREAS SHALL BE PROTECTED, ESPECIALLY THROUGH THE USE OF SILT FENCES AND MINIMIZATION OF SOIL
EXPOSURE.
viii. IF NECESSARY, WATER FROM THE PROJECT SITE SHALL BE FILTERED THROUGH AN APPROVED DEVICE SUCH AS A BAKER TANK, PRIOR TO RELEASING
IT TO THE VEGETATED WETLAND AREA. THE CONTRACTOR SHALL CREATE/MODIFY THE DEWATERING PLAN BASED UPON SITE CONDITIONS AND SHALL
ATTACH IT TO THIS STORMWATER POLLUTION PREVENTION PLAN (SWPPP).
2. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ELEMENTS
a. MARK CLEARING LIMITS (BMP C103 - HIGH VISIBILITY PLASTIC)
CLEARING LIMITS ARE SHOWN ONTHE PLANS.
b. ESTABLISH CONSTRUCTION ACCESS (BMP C105 - STABILIZED CONSTRUCTION ENTRANCE)
CONSTRUCTION ACCESS WILL BE THE PAVED DRIVEWAY FROM MUKILTEO SPEEDWAY. AS A PROTECTIVE MEASURE, STREET SWEEPING WILL BE
PERFORMED WHEN REQUIRED.
c. CONTROL FLOW RATES (BMP C200 - INTERCEPTOR SWALE; BMP C206 - LEVEL SPREADER)
MINOR ADDITIONAL FLOW IS EXPECTED FROM THIS PROJECT FLOW WILL BE CONTROLLED WITH APPROPRIATE BMPS AS NEEDED SUCH AS WITH CHECK
DAMS (BMP C207) OR STRAW WATTLES (BMP C235) IF REQUIRED.
d. INSTALL SEDIMENT CONTROLS (BMP C233 - SILT FENCE)
SEDIMENT CONTROLS INCLUDE A SILT FENCE ALONG THE PERIMETER OF THE SITE, COVERING OF SOIL STOCKPILES, AND INSTALLATION OF STRAW WHEN
NECESSARY. EROSION CONTROL BMPS SHALL BE INSTALLED PRIOR TO LAND DISTURBING ACTIVITIES AS NOTED ON THE PLANS. THE SITE SHALL ALSO BE
MONITORED AND TESTED SO THAT TURBIDITY IN THE WATER LEAVING THE AREA WILL NOT EXCEED 5 NTU ABOVE BACKGROUND.
e. STABILIZE SOILS (BMP C122 - NETS AND BLANKETS; BMP C123 - PLASTIC COVERING)
TO PROTECT THE SOIL STOCKPILES FROM EROSIVE FORCES SUCH AS RAIN, PLASTIC SHEETING, JUTE MATS OR SIMILAR BMPS WILL BE PLACED UPON
EXPOSED AND NON-WORKED SOIL THROUGHOUT CONSTRUCTION. PER WET WEATHER REQUIREMENTS, THESE BMPS WILL BE PLACED WITHIN 2 DAYS OF
STOCKPILING THE SOIL FROM OCTOBER 1ST THROUGH APRIL 30TH OR IF RAINING. DUST CONTROL PER BMP C140 SHALL BE IMPLEMENTED AS WELL.
f. PROTECT SLOPES (BMP C122 - NETS AND BLANKETS)
ANY SLOPES ALONG THE PROJECT SITE SHALL NOT BE DAMAGED FROM CONCENTRATED FLOWS. STOCKPILE SLOPES SHALL BE PROTECTED AS
MENTIONED IN THE "STABILIZE SOILS" SECTION.
g. PROTECT DRAIN INLETS (BMP C220 - STORM DRAIN INLET PROTECTION)
TO PREVENT SEDIMENT FROM MOVING INTO ANY NEARBY STORM SYSTEM, CATCH BASIN INLET PROTECTION SHALL BE USED FOR CATCH BASINS
ENCOUNTERED ALONG THE PROJECT. INLETS WILL BE INSPECTED WEEKLY AT A MINIMUM AND DAILY DURING STORM EVENTS AS NOTED ON THE PLANS.
SEDIMENT SHALL NOT ACCUMULATE GREATER THAN SIX INCHES IN DEPTH WITHIN THE INLET PROTECTION DEVICE.
h. STABILIZE CHANNELS AND OUTLETS (BMP C209 - OUTLET PROTECTION)
SHOULD IT BE NECESSARY, CHECK DAMS PER BMP C207 MAY BE USED TOHELP STABILIZE CHANNELS THROUGHOUT THE DURATION OF THE PROJECT.
i. CONTROL POLLUTANTS (BMP C233 - SILT FENCE)
GOOD HOUSEKEEPING PRACTICES AND APPROPRIATE BMPS AS SHOWN ON THE PLANS AND APPROVED BY THE GOVERNING JURISDICTION WILL BE
UTILIZED TO CONTROL POLLUTANTS ON THE SITE. TO ENSURE THIS, A NOTE IS STATED ON THE PLANS REQUIRING ALL POLLUTANTS ON SITE TO BE
HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF SURFACE WATER. ANY WATER THAT IS USED TO CLEAN
EQUIPMENT OR IS PUMPED FROM THE EXISTING DRAINAGE FACILITIES SHALL BE FILTERED THROUGH AN APPROVED FILTERING DEVICE AND TESTED
PRIOR TO DISCHARGING TO AN UNDEVELOPED PORTION OF THE SITE SAWCUTTING ACTIVITIES SHALL FOLLOW BMP C152.
j. CONTROL DEWATERING (BMP C251 - CONSTRUCTION STORMWATER FILTRATION)
ANY WATER FROM DEWATERING OPERATIONS THAT MAY OCCUR THROUGHOUT THIS PROJECT WILL BE CONVEYED TO AN APPROVED FILTER SUCH AS A
BAKER TANK AND THEN RELEASED TO AND UNDISTURBED AREA ON SITE. ALL MEASURES SHALL COMPLY WITH REGULATION STANDARDS. THE
CONTRACTOR SHALL CREATE A DEWATERING PLAN BASED UPON SITE CONDITIONS AND SHALL ATTACH IT TO THIS STORMWATER POLLUTION PREVENTION
PLAN (SWPPP).
k. MAINTAIN BMPS
THE BMPS SHOWN ON THE PLANS SHALL BE MAINTAINED AND REPAIRED AS NEEDED. SPECIFIC MAINTENANCE REQUIREMENTS ARE LISTED IN THE NOTES
AND/OR DETAILS ON THE PLANS. MONITORING SHALL BE CONDUCTED BY THE DESIGNATED EROSION CONTROL SPECIALIST TO INSURE BMPS ARE
WORKING EFFECTIVELY AND ARE NOT DAMAGING FACILITIES OR WATERWAYS DOWNSTREAM OF THE SITE. A NOTE HAS BEEN ADDED TO THE PLANS
STATING THAT TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON THE SITE UPON COMPLETION OF THE WORK AS APPROPRIATE MATERIALS
SHALL BE ON HAND PER BMP C150 IN ORDER TO PROVIDE MAINTENANCE OR EMERGENCY MEASURES RELATED TO EROSION CONTROL.
l. MANAGE THE PROJECT
EROSION CONTROL SPECIALIST: THE CONTRACTOR SHALL PROVIDE THE NAME OF A CERTIFIED EROSION CONTROL SPECIALIST (PER BMP C160) THAT
WILL VERIFY THE ACTIONS NOTED IN THIS STORMWATER POLLUTION PREVENTION PLAN AND ON THE DRAWINGS WILL BE IMPLEMENTED.
PHASING OF CONSTRUCTION): PHASING OF THE WORK SHALL COMPLY WITH BMP C162 (SCHEDULING). THE FIRST ORDER OF WORK WILL INCLUDE
INSTALLING APPROPRIATE BMPS FOR EROSION CONTROL. PROJECT DEVELOPMENT WILL THEN COMMENCE. THE SITE SHALL BE PROTECTED AS
DESCRIBED IN THIS PLAN AND ON THE DRAWINGS. THROUGHOUT THE WORK, THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS. UPON
COMPLETION OF THE WORK, TEMPORARY BMPS SHALL BE REMOVED AS NECESSARY.
SEASONAL WORK LIMITATIONS: WORK IS SCHEDULED FOR THE DRY SEASON HOWEVER, IT MAY BE CONDUCTED DURING THE WET WEATHER SEASON OF
OCTOBER 1 THROUGH MARCH 31ST. ALL STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING, STRAW (OR EQUAL) TO MINIMIZE ANY LOSS OF SOIL
DURING THE WET WEATHER. THE CONTRACTOR WILL BE RESPONSIBLE FOR CONSISTENTLY MONITORING THE OUTFALLS TO ENSURE ALL APPLICABLE
REQUIREMENTS ARE MET AND THAT WATER QUALITY DOWNSTREAM IS NOT BEING COMPROMISED THROUGHOUT THIS PROCESS. IN ADDITION, THE
CONTRACTOR'S CERTIFIED EROSION CONTROL SPECIALIST WILL BE RESPONSIBLE FOR ENSURING PROPER BMP MAINTENANCE IS CONDUCTED
THROUGHOUT THE SEASON AS WELL AS ENSURING THE LOCAL JURISDICTION'S REQUIREMENTS ARE MET THROUGH TESTING AND OTHER APPROPRIATE
METHODS.
COORDINATION WITH UTILITIES AND OTHER CONTRACTORS: AS STATED ON THE PLANS AND IN THE SPECIFICATIONS, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR COORDINATING ANY UTILITY WORK WITH THE APPROPRIATE AGENCIES.
INSPECTION AND MONITORING: THE CONTRACTOR'S EROSION CONTROL SPECIALIST SHALL BE PRESENT OR ON-CALL THROUGHOUT THE PROJECT
DURATION TO INSURE THE BMPS ARE WORKING APPROPRIATELY AND ARE WELL MAINTAINED. THE SPECIALIST SHALL CHOOSE APPROPRIATE MONITORING
SITES AND NOTE THEM ON BOTH THE GROUND AND ON THE FIELD COPY OF THE PLANS. THE SPECIALIST SHALL MONITOR THE DISCHARGE FROM THIS
SITE AFTER EACH STORM EVENT THAT GENERATES RUNOFF. THE SPECIALIST SHALL ALSO CONDUCT SITE INSPECTION REPORTS ON THE INSTALLED
BMPS. THE MONITORING SHALL BE DONE IN A PROFESSIONAL MANNER CONSISTENT WITH CURRENT SAMPLING PROTOCOLS AND REPORTING
REQUIREMENTS.
REPORTING: A NOTE HAS BEEN ADDED TO THE PLANS STATING THAT THE CONTRACTOR IS RESPONSIBLE FOR REPORTING ALL SPILLS OR DISCHARGE OF
POLLUTANTS WITHIN 24-HOURS TO THE OWNER. THE SITE INSPECTION REPORTS MENTIONED ABOVE WILL BE AVAILABLE ON SITE AND PROVIDED TO THE
OWNER ON A MONTHLY BASIS OR WHEN REQUESTED.
MAINTENANCE : NO MAINTENANCE ON HEAVY EQUIPMENT IS EXPECTED TO OCCUR ON SITE THROUGHOUT THE PROJECT.
MAINTENANCE OF THE CONSTRUCTION SWPPP: THIS PLAN WILL BE LOCATED ON SITE AT ALL TIMES. THE PLAN WILL BE REVISED ACCORDINGLY IF
SIGNIFICANT CHANGES HAVE BEEN MADE TO THE DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE OF ANY BMPS.
l. PROTECT LOW IMPACT DEVELOPMENT FACILITIES
NO LOW IMPACT DEVELOPMENT FACILITIES ARE INTENDED FOR THIS SITE.
SW
PP
P N
OT
ES
SILTATION FENCE
FILTER FABRIC CATCH BASIN
INSERT FOR SEDIMENT ONLY
TE
MP
OR
AR
Y E
RO
SIO
N A
ND
S
ED
IM
EN
TA
TIO
N
CO
NT
RO
L D
ET
AIL
S A
ND
N
OT
ES
G-5
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
PIPE TRENCH SECTION VALVE EXTENSION STEM
PLAN VIEW
PROFILE VIEW
VALVE BOX IN ASPHALT AREA
NON-PAVED
PAVED
CLEANOUT DETAIL ASPHALT PATCH AND OVERLAY DETAIL
ROOF DRAIN DETAIL
GE
NE
RA
L D
ET
AIL
S
G-6
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
PLAN ELEVATION
MINIMUM BEARING AREA TABLE
VERTICAL ANCHOR BLOCK THRUST BLOCKS
ELEVATION
PLAN
BYPASS PUMP CONNECTION
SIDE SEWER DETAIL
(CONNECTION TO EXISTING MAIN)
GE
NE
RA
L D
ET
AIL
S
G-7
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SECTION SECTION
PROFILE
MAN GATE DETAIL
CHAIN LINK SECURITY FENCE
SHIPS LADDER MOUNTING DETAIL FENCE GATE LATCH/LOCK DETAIL
GE
NE
RA
L D
ET
AIL
S
G-8
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
8
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
EX
IS
TIN
G S
IT
E P
LA
N, D
EM
OL
IT
IO
N A
ND
T
EM
PO
RA
RY
ER
OS
IO
N A
ND
S
ED
IM
EN
TA
TIO
N C
ON
TR
OL
P
LA
N
C-1
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
TE
MP
OR
AR
Y S
HO
RIN
G P
LA
N
C-2
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
MO
DIF
IE
D S
IT
E P
LA
N
C-3
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
STRUCTURE AND FEATURE COORDINATES
NORTHING EASTING COMMENT
STRUCTURE AND FEATURE COORDINATES
NORTHING EASTING COMMENT
SIT
E P
IP
IN
G P
LA
N
C-4
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
YARD PIPING COORDINATES
X NORTHING EASTING SIZE-PROCESS COMMENT ℄ ELEVATION
PIPING SYMBOLS PROCESS PIPING / EQUIPMENT IDENTIFICATIONS
PROCESS PIPING EQUIPMENT
AB
BR
EV
IA
TIO
NS
, G
EN
ER
AL
S
YM
BO
LS
,
SY
MB
OL
L
EG
EN
D, N
UM
BE
RIN
G S
YS
TE
M
AN
D G
EN
ER
AL
N
OT
ES
M-1
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
GREATER THAN 3" DIA.
PVC OR FRP PIPE
FLOORS
WALLS
STEEL PIPE CAST OR DUCTILE
IRON PIPE
PIPE PENETRATIONS THROUGH NEW CONCRETE WALLS AND FLOORS DETAILS
EXISTING CONCRETE WALL PIPE PENETRATION
SLUICE GATE DETAIL
PLANSECTION
FLUSH MOUNT SLEEVE DETAIL
TRENCH DRAIN DETAIL
PIP
E P
EN
ET
RA
TIO
NS
A
ND
F
LE
XIB
LE
C
OU
PL
IN
G
RE
ST
RA
IN
T D
ET
AIL
S
M-2
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
HIGH LEVEL FLOAT DETAIL
WET WELL LEVEL CABLE SUPPORT DETAIL
STILLING WELL
STILLING WELL PLAN DETAIL
PRESSURE GAUGE (SEWAGE SERVICE) DETAIL
MIS
CE
LL
AN
EO
US
P
IP
IN
G D
ET
AIL
S
M-3
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
PUMP STATION DEMOLITION PLAN
ILLUSTRATIVE SECTION
DE
MO
LIT
IO
N P
LA
N A
ND
S
EC
TIO
N
M-4
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
LIFT STATION LOWER PLAN
LIF
T S
TA
TIO
N P
LA
N
M-5
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
MA
TC
HL
IN
E, S
EE
S
HE
ET
M
-6
FLOW METER VAULT
LOWER PLAN
FL
OW
M
ET
ER
V
AU
LT
L
OW
ER
P
LA
N
M-6
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
MA
TC
HL
IN
E, S
EE
S
HE
ET
M
-5
SECTION
LIF
T S
TA
TIO
N S
EC
TIO
N
M-7
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SECTION SECTION
LIF
T S
TA
TIO
N S
EC
TIO
NS
M-8
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SECTION SECTION
SUMP PUMP DETAIL
DETAIL
LIF
T S
TA
TIO
N S
EC
TIO
NS
M-9
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
GENERATOR FUEL TANK PLAN
SECTION
FUEL SYSTEM COMPONENT SCHEDULE
COMPONENT
FUEL SYSTEM COMPONENT SCHEDULE
COMPONENT
FUEL PIPE TRENCH TRANSITION SLEEVE ASSEMBLY TRANSITION SUMP TANK
FU
EL
T
AN
K P
LA
N A
ND
S
EC
TIO
N
M-10
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
GENERATOR ROOM PLAN
GENERATOR SECTION GENERATOR SECTION
INSULATED ROOF THIMBLE
FU
EL
T
AN
K D
ET
AIL
S A
ND
C
OM
PO
NE
NT
S
CH
ED
UL
ES
M-11
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
ROOM MATERIAL AND FINISH SCHEDULE
WALLS
CEILING
ROOM NAME
FLOOR NORTH SOUTH EAST WEST
DOOR SCHEDULE
NO. MATERIAL & TYPE
DOOR SIZE: WIDTH x
HEIGHT x THICKNESS
DOOR
TYPE
FRAME
TYPE
MAXIMUM
U-FACTOR
FINISH
HARDWARE
GROUP
WINDOW SCHEDULE
NO. TYPE
WINDOW SIZE:
WIDTH x HEIGHT =
AREA
QUANTITY TOTAL VGA
MAXIMUM
U-FACTOR NFRC
CERTIFIED
MAXIMUM
SHGC
BUILDING DATA CODE SUMMARY
≥
TYP DOOR DETAIL DOOR TYPE
DOOR FRAME TYPE
RESTROOM FRAMING
SECTION
RESTROOM FRAMING
HEAD SECTION
BU
IL
DIN
G D
AT
A C
OD
E S
UM
MA
RY
A
ND
AR
CH
IT
EC
TU
RA
L S
CH
ED
UL
ES
A-1
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
5
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
UPPER FLOOR PLAN
UP
PE
R F
LO
OR
P
LA
N
A-2
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
5
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
LOWER FLOOR PLAN BATHROOM CEILING PLAN
LO
WE
R F
LO
OR
P
LA
N
A-3
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
5
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SOUTHWEST ELEVATIONSOUTHEAST ELEVATION
NORTHWEST ELEVATION NORTHEAST ELEVATION
BU
IL
DIN
G E
XT
ER
IO
R E
LE
VA
TIO
NS
A-4
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
5
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
EAVE SECTION RAKE SECTION
GLASS BLOCK WINDOW
HEAD AND JAMB DETAIL
GLASS BLOCK WINDOW
SILL DETAIL
NORTHEAST WALL
BATHROOM ELEVATION
NORTHWEST WALL
BATHROOM ELEVATION
RIDGE DETAIL GUTTER DETAIL
TYPICAL
BUILDING SECTION
AR
CH
IT
EC
TU
RA
L D
ET
AIL
S
A-5
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
5
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
HVAC DESIGN CRITERIA HVAC SYMBOLS
HVAC ABBREVIATIONS
HVAC GENERAL NOTES
HVAC EQUIPMENT & AIR
DEVICE IDENTIFICATIONS
HV
AC
N
OT
ES
H-1
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
LOUVER SCHEDULE
BUILDING ROOM NAME
LOUVER
NO.
TYPE
MANUFACTURER
& MODEL NO.
ROUGH
OPENING
SIZE (WxH)
MOUNTING
HEIGHT
REMARKS
FAN SCHEDULE
BUILDING ROOM NAME
UNIT
NO.
TYPE
MANUFACTURER
& MODEL NO.
HP,
VOLTAGE,
AND
PHASE
CONTROLS
CFM AND
STATIC
PRESSURE
REMARKS
HEATER SCHEDULE
BUILDING ROOM NAME
UNIT
NO.
TYPE
MANUFACTURER
& MODEL NO.
KW
OUTPUT
CONTROLS
VOLTAGE
AND
PHASE
MOUTING
TYPE
REMARKS
GRILLE/DIFFUSER SCHEDULE
BUILDING ROOM NAME
DIFFUSER/
GRILLE
NO.
TYPE
MANUFACTURER
& MODEL NO.
SIZE
(WxL)
REMARKS
CONTROL SCHEDULE
BUILDING ROOM NAME
UNIT
NO.
TYPE
CONTROLLED
EQUIPMENT
MANUFACTURER
& MODEL NO.
HEAT
SET
POINT
COOL
SET
POINT
VOLTAGE
AND
PHASE
REMARKS
HEAT PUMP SCHEDULE
BUILDING
ROOM
NAME
UNIT NO. TYPE
MANUFACTURER
& MODEL NO.
VOLTAGE,
PHASE
AND MCA
CONTROLS
STANDARD
AIRFLOW
HEATING
CAPACITY
COOLING
CAPACITY
AHRI
LISTED
EFFICIENCY
REMARKS
CONTROL DAMPER SCHEDULE
BUILDING
ROOM
NAME
DAMPER
NO.
FRAME
TYPE
MANUFACTURER
& MODEL NO.
VOLTAGE,
AND
PHASE
NOMINAL
SIZE
(WxH)
ACTUATOR
MFR.
ACTUATOR
MOUNTING
NO. OF
ACTUATORS
FAIL
POSITION
REMARKS
AIR BARRIER AREA CALCULATIONS
PLAN - FLOOR/CEILING AREA A1/A2
SECTION - WALL AREA A3/A4 SECTION - WALL AREA A5/A6
HV
AC
S
CH
ED
UL
ES
H-2
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
HVAC UPPER FLOOR PLAN
UPPER FLOOR
HVAC SECTION
ROOFTOP
FAN DETAILLOUVER DETAIL HEATER MOUNTING
HV
AC
U
PP
ER
F
LO
OR
P
LA
N
H-3
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
HVAC DRY WELL PLAN
LOWER FLOOR
HVAC SECTION
TYPICAL
DIFFUSER DETAIL
HV
AC
D
RY
W
EL
L P
LA
N
H-4
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
4
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
DRAINAGE PIPING LEGEND
WATER PIPING NOTES
DRAINAGE PIPING NOTES
PLUMBING SYMBOLS & ABBREVIATIONS
FLOOR DRAIN AND
CLEANOUT DETAIL
HOSE RACK DETAIL
ELEVATION SECTION
FREE STANDING
BACKPLATE DETAIL
EXTERIOR HOSE BIB DETAIL
PL
UM
BIN
G N
OT
ES
A
ND
D
ET
AIL
S
P-1
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
2
PLUMBING PLAN
PLUMBING ELEVATION
DOMESTIC WATER HEATER SCHEDULE
BUILDING LOCATION ID. NO. TYPE
MFR &
MODEL
NO.
ELECTRICAL
MOUNTING CAPACITY REMARKS
KW VOLTS PHASE
PL
UM
BIN
G, D
RA
IN
AG
E, A
ND
V
EN
TIN
G P
LA
N
P-2
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
2
GENERAL STRUCTURAL NOTES
I
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
GE
NE
RA
L S
TR
UC
TU
RA
L N
OT
ES
S-1
SUPPLEMENTAL STRUCTURAL ABBREVIATIONS: STRUCTURAL LEGEND
SP
EC
IA
L IN
SP
EC
TIO
N S
CH
ED
UL
E, S
UP
PL
EM
EN
TA
L
AB
BR
EV
IA
TIO
NS
A
ND
L
EG
EN
D
S-2
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
TYPE IITYPE I
DOUBLE CURTAIN
INTERSECTIONINTERSECTION
SINGLE CURTAIN
CORNER CORNER
(OPTIONAL)
CORNER
TYP. LAP SCHEDULE TYP. CHAMFER DETAIL TYP PENETRATION REINFORCING DETAIL
TYP REINFORCING @ WALL INTERSECTION DETAIL
HOUSEKEEPING PAD EQUIPMENT PIER
TYP HOUSEKEEPING PAD
& EQUIPMENT PIER DETAILS
SECTION A-A
TYP STAIR, GUARD AND HANDRAIL DETAILS
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
TY
PIC
AL
S
TR
UC
TU
RA
L D
ET
AIL
S
S-3
WATER STOP @ WALL WATER STOP @ SLAB
TYP WATER STOP PLACEMENT
TYP WATERSTOP INSTALLATION DETAIL
TYPICAL CMU WALL REINFORCEMENT PLACEMENT
RECESSED LEDGER CONDITION
LEDGER CONDITION
PLATE FASTENER
(ALTERNATE OPTION)
CLIP FASTENER
GRATING CONNECTION DETAIL
TYP GENERATOR PAD DETAIL TYP EXTERIOR EQUIPMENT PAD DETAIL GUARD MOUNTING DETAIL
TYPICAL 10" INSULATED
CMU WALL DETAIL
TY
PIC
AL
S
TR
UC
TU
RA
L D
ET
AIL
S
S-4
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
LOWER FOUNDATION PLAN
UPPER FOUNDATION AND
BRIDGE CRANE FRAMING PLAN
UP
PE
R &
L
OW
ER
F
OU
ND
AT
IO
N P
LA
NS
, A
ND
BR
ID
GE
C
RA
NE
F
RA
MIN
G P
LA
N
S-5
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
MAIN FLOOR PLAN
CMU WALL PLAN
LINTEL SCHEDULE
TYPICAL CMU LINTEL
SCHEDULE AND DETAIL
MA
IN
F
LO
OR
&
C
MU
W
AL
L P
LA
NS
A
ND
LIN
TE
L S
CH
ED
UL
E
S-6
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
ROOF FRAMING PLAN
RO
OF
P
LA
N
S-7
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
TYP ROOF METAL DECK
ATTACHMENT SCHEDULE
SECTIONSECTION
SECTIONSECTION SECTION
SECTION
SECTION SECTION
DE
TA
IL
S
S-8
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
LEVEL 1 LEVEL 2
SECTION
ST
AIR
P
LA
NS
S-9
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SECTION SECTION
STAIRWAY PLANS
SECTION
UPPER LANDING
LOWER LANDING
DETAILSECTION SECTION
PLAN VIEW
SECTION SECTION
PLAN DETAILSECTION
SECTION
SECTION
ST
AIR
S
EC
TIO
NS
S-10
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SECTION
SECTION
SECTIONSECTION
SECTION SECTION SECTION
SECTION
SECTION
SECTION
DE
TA
IL
S
S-11
●
WA
LD
EN
WO
OD
L
IF
T S
TA
TIO
N
RE
PL
AC
EM
EN
T
11
CO
NS
ULT
IN
G E
NG
IN
EE
RS
SIL
VE
R L
AK
E W
AT
ER
AN
D S
EW
ER
D
IS
TR
IC
T
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E0.0
SYM
BO
L SC
HED
ULE
DEV
ICE
TAG
LIS
TS
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E0.1
E1.0
ELEC
TRIC
AL
SITE
PLA
N
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E1.1
LIFT
STA
TIO
N E
LEC
TRIC
AL
LOW
ER P
LAN
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E1.2
LIFT
STA
TIO
N E
LEC
TRIC
AL
UPP
ER F
LOO
R P
LAN
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E1.3
LIFT
STA
TIO
N L
IGH
TIN
G L
OW
ER L
EVEL
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E1.4
LIFT
STA
TIO
N L
IGH
TIN
G U
PPER
FLO
OR
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E1.5
LIFT
STA
TIO
N H
VAC
PO
WER
LO
WER
PLA
N
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E1.6
HVA
C P
OW
ER U
PPER
FLO
OR
PLA
N
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E1.7
SITE
GR
OU
ND
ING
PLA
N
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E2.0
EXTE
RIO
R E
LEC
TRIC
AL
WA
LL E
LEVA
TIO
N
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E2.1
UPP
ER F
LOO
R E
LEC
TRIC
AL
WA
LL E
LEVA
TIO
NS
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E3.0
LIFT
STA
TIO
N E
LEC
TRIC
AL
LOW
ER S
ECTI
ON
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E5.0
DET
AIL
S
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E5.1
DET
AIL
S
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.0
ELEC
TRIC
AL
ON
ELIN
E D
IAG
RA
M
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.1
ETH
ERN
ET N
ETW
OR
K D
IAG
RA
M A
ND
INTE
RM
EDIA
TE P
AR
TIA
L EL
ECTR
ICA
LO
NEL
INE
DIA
GR
AM
E6.2
PAN
EL S
CH
EDU
LES
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E6.3
CO
ND
UC
TOR
S A
ND
CO
ND
UIT
SC
HED
ULE
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E6.4
LIG
HTI
NG
CO
NTR
OL
WIR
ING
DIA
GR
AM
S A
ND
LIG
HTI
NG
SC
HED
ULE
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E6.5
GEN
ERA
TOR
CO
NTR
OL
WIR
ING
DIA
GR
AM
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E6.6
MO
TOR
STA
RTE
R (V
FD 0
1) E
LEM
ENTA
RY
WIR
ING
DIA
GR
AM
AN
D E
XTER
IOR
ELE
VATI
ON
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E6.7
MO
TOR
STA
RTE
R (V
FD 0
2) E
LEM
ENTA
RY
WIR
ING
DIA
GR
AM
AN
D E
XTER
IOR
ELE
VATI
ON
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
E6.8
MO
TOR
STA
RTE
R (V
FD 0
3) E
LEM
ENTA
RY
WIR
ING
DIA
GR
AM
AN
D E
XTER
IOR
ELE
VATI
ON
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.9
PLC
CO
NTR
OL
PAN
EL (C
P 01
) IN
TER
IOR
ELE
VATI
ON
S
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.10
PLC
CO
NTR
OL
PAN
EL (C
P 01
) EXT
ERIO
R E
LEVA
TIO
N
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.11
PLC
CO
NTR
OL
PAN
EL (C
P 01
)EL
EMEN
TAR
Y W
IRIN
G D
IAG
RA
M
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.12
PLC
CO
NTR
OL
PAN
EL (C
P 01
)EL
EMEN
TAR
Y W
IRIN
G D
IAG
RA
M
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.13
PLC
CO
NTR
OL
PAN
EL (C
P 01
)EL
EMEN
TAR
Y W
IRIN
G D
IAG
RA
M
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.14
PLC
CO
NTR
OL
PAN
EL (C
P 01
)EL
EMEN
TAR
Y W
IRIN
G D
IAG
RA
M
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33E6.15
PLC
CO
NTR
OL
PAN
EL (C
P 01
)EL
EMEN
TAR
Y W
IRIN
G D
IAG
RA
M
ED6.0
DEM
OLI
TIO
N O
NEL
INE
DIA
GR
AM
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
ED6.1
EXIS
TIN
G/D
EMO
LITI
ON
GEN
ERA
TOR
CO
NTR
OL
WIR
ING
DIA
GR
AM
SILV
ER L
AK
E W
ATE
R &
SEW
ERD
ISTR
ICT
WA
LDEN
WO
OD
LIF
T ST
ATI
ON
REP
LAC
EMEN
TC
ON
SU
LT
ING
EN
GIN
EE
RS
5/10
/201
9
33
Sheets and ViewsCOVERG-1 INDEXG-2 LEGENDG-3 SURVEY DATAG-4 SWPPP NOTESG-5 TESC DETAILSG-6 GEN_DET2 - GD-1G-7 GEN_DET2 - GD-2G-8 GEN_DET2 - GD-3
GEN_DET2-G-7.pdfSheets and ViewsG-7
INDEX-Layout1.pdfSheets and ViewsLayout1
Civil.pdfSheets and ViewsC-1 EX-SITEC-2 TEMP SHORING PLANC-3 P-SITEC-4 PIPING
SHORING-SHORING.pdfSheets and ViewsSHORING
Mechanical.pdfSheets and ViewsM-1 M_DETM-2 M_DETM-3 M_DETM-4 DEMOM-5 PL-SECM-6 PL-SECM-7 PL-SECM-8 PL-SECM-9 PL-SECM-10 FUEL PLANM-11 FUEL DETAIL
PL-SEC-PL.pdfSheets and ViewsPL
PL-SEC-PL (2).pdfSheets and ViewsPL (2)
M_GNTR 5-13.pdfSheets and ViewsM-10 FUEL PLANM-11 FUEL DETAIL
18510.01 A-Sheets.pdfSheets and ViewsA-1 A NOTESA-2 BLDG UPPER PLANA-3 BLDG LOWER PLANA-4 A BLDG ELEVATIONSA-5 A DETAILS
18510.01 H-Sheets.pdfSheets and ViewsH-1 H NOTESH-2 H SCHEDULESH-3 H PLANH-4 H DRY WELL PLAN
18510.01 P-Sheets.pdfSheets and ViewsP-1 P- NOTESP-2 P PLAN
Structural.pdfSheets and ViewsS-1 GEN NOTESS-2 STRUC ABBREVS-3 DET 1S-4 DET 2S-5 FND PLNS-6 FLR PLNS-7 ROOF PLNS-8 DTLSS-9 STAIR PLNSS-10 STAIR SECTIONSS-11 DTLS
Waldenwood Elec 2019 05 10 rev2.pdfE0.0-SYMBOL SCHEDULEE0.1-DEVICE TAG LISTSE1.0-ELECTRICAL SITE PLANE1.1-LIFT STATION ELECTRICAL LOWER FLOOR PLANE1.2-LIFT STATION ELECTRICAL UPPER FLOOR PLANE1.3-ELECTRICAL PLANE1.4-LIGHTING UPPER FLOORE1.5-ELECTRICAL PLANE1.6-HVAC POWER UPPER FLOORE1.7-GROUNDING SITE PLANE2.0-EXTERIOR WALL ELEVATIONE2.1-INTERIOR WALL ELEVATIONSE3.0-LIFT STATION ELECTRICAL LOWER SECTIONE5.0-DETAILSE5.1-DETAILSE6.0-ONE LINE DAIGRAME6.1-ONE LINE DAIGRAME6.2-PANEL SCHEDULESE6.3-CONDUCTOR AND CONDUIT SCHEDULESE6.4-LIGHTING CONTROL PANEL (19 LCP 01)E6.5-GENERATOR CONTROL WIRING DIAGRAME6.6-VFD 01 EWDE6.7-VFD 02 EWDE6.8-VFD 03 EWDE6.9-PLC ELEVATIONSE6.10-PLC ELEVATIONSE6.11E6.12E6.13E6.14E6.15ED6.0-Existing OnelineED6.1-DEMOLITION GENERATOR WIRING DIAGRAM
General.pdfSheets and ViewsCOVERG-1 INDEXG-2 LEGENDG-3 SURVEY DATAG-4 SWPPP NOTESG-5 TESC DETAILSG-6 GEN_DET2 - GD-1G-7 GEN_DET2 - GD-2G-8 GEN_DET2 - GD-3
GEN_DET2-G-7.pdfSheets and ViewsG-7
INDEX-Layout1.pdfSheets and ViewsLayout1
INDEX-Layout1.pdfSheets and ViewsLayout1
206-284-08602019-05-13T11:29:51-07001130 Rainier Ave. S., Seattle, WAAaron M PeaseWAC 196-23-020