Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle,...

Post on 17-Jan-2016

213 views 0 download

Transcript of Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle,...

Communicating a cross-border infrastructure project

The Fehmarnbelt Fixed Link

Ajs Dam, Femern A/S

Director Corporate Communications

06 May 2015Ajs Dam

1

New link from Scandinavia to the rest of Europe

06 May 2015Ajs Dam 2

Constructing the Fehmarnbelt Tunnel

18 km long with four tunnel tubes Two double-lane motorway tubes with emergency lane Two rail tubes with electrified rail tracks Runs between Rødby on Lolland and Puttgarden on Fehmarn

Construction budget: 7 billion EUR (2015 prices) Owner: The Danish state Client: Femern A/S

06 May 2015Ajs Dam 3

Communication of infrastructure projects

Ajs Dam 206 May 2015

Trust and dialogue need time…

5Ajs Dam06 May 2015

Trust and dialogue need time…

6Ajs Dam06 May 2015

See more at:

Internet: www.femern.com Facebook: www.facebook.com/femern

06 May 20157Ajs Dam