Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle,...
-
Upload
grace-greer -
Category
Documents
-
view
213 -
download
0
Transcript of Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle,...
Communicating a cross-border infrastructure project
The Fehmarnbelt Fixed Link
Ajs Dam, Femern A/S
Director Corporate Communications
06 May 2015Ajs Dam
1
New link from Scandinavia to the rest of Europe
06 May 2015Ajs Dam 2
Constructing the Fehmarnbelt Tunnel
18 km long with four tunnel tubes Two double-lane motorway tubes with emergency lane Two rail tubes with electrified rail tracks Runs between Rødby on Lolland and Puttgarden on Fehmarn
Construction budget: 7 billion EUR (2015 prices) Owner: The Danish state Client: Femern A/S
06 May 2015Ajs Dam 3
Communication of infrastructure projects
Ajs Dam 206 May 2015
Trust and dialogue need time…
5Ajs Dam06 May 2015
Trust and dialogue need time…
6Ajs Dam06 May 2015
See more at:
Internet: www.femern.com Facebook: www.facebook.com/femern
06 May 20157Ajs Dam