Achieving continuous

improvements – the Green

Cargo way

Marcin Tubylewicz

Head of Strategic Production Development, Green Cargo

Green Cargo overall strategy

Control

Profitability

Growth

Str

ate

gic

focus

2002 2003 2004 2005 2006 2007 2008

Net result development

-1200

-1000

-800

-600

-400

-200

0

200

400

1985 1990 1995 2000 2005 2010 2015

MSEK

-1200

-1000

-800

-600

-400

-200

0

200

400

1985 1990 1995 2000 2005 2010 2015

MSEK

Net result development

5

Important findings from Green Cargo´s work with

SIQ

The following principles form the base for dedicated quality centric leadership:

‒ Customer focus ‒ Fact based decision making ‒ Process based work flows ‒ Continuous improvement focus

(involving entire organization)

Inspiration…

Important insight

What characterizes best-

practice organizations is not

their ground-breaking concepts,

but their uncompromised

implementation of what is

already known.

8

Drivers for continuous improvement

1. Well established process for developing and implementing

improvement ideas

2. An unambiguous system to measure how diligently improvement

activities are being carried out

3. A set of quantitative key measurement variables to track performance

against best-practice benchmarks

9

Speed of improvement depends on ambition

level when setting targets

0 1 2 3 5 6 7 Years

Level of

improvement

Current top level targets

Dimension

Measurement Status

120901

GBT

150630

Safety

Håkan Sjöström

Safety index 95,1 97,5

Quality

Anders Lester

On time performance, loaded and

empty wagons

92,6 % 96,5 %

Loco productivity

Patrik Saxvall

Loco kilometers / loco 137 000

km/lok (120930)

250 000

Wagon efficiency

Martin Modéer

Wagon cost / loaded wagon

kilometers

1,82 sek 1,65 sek

Personnel efficiency

Patrik Johansson

Personnel cost / net ton kilometer 10,84 sek 9,99 sek

Personnel health

Mikael Olrog

Absenteeism due to illness / FTE 3,8 % 3,0 %

Classified…

11

On time performance, loaded and empty wagons

Planning group Start

value

Operations group Start

value

Rolling stock group Start

value

Train departure punctuality

Train arrival punctuality

81,7 %

82,8%

Departure check sign off on

time

87,8% Loco availability

81,9 %

1. Loco driver on time

2. Departure and arrival

punctuality – wagonload

79,6%

78,3%

76,7 %

Sign off on time:

Övre Norrland

Nedre Norrland

Öst

Mitt

Väst

Syd

78,5 %

83,4 %

87,4 %

90,6 %

87,1 %

92,1 %

Breakdown of top level targets – example: Quality

Creative

problem solving

Action plan 2

months ahead

BC-meeting

No 1

Target setting

BC 2

BC 3

BC 4

BC 5

BC 6

C

C

C

C

C

Identification

of key levers

Business Control

Important elements of Green Cargo Business Control

Challenging targets

Commitment from entire

organization

Identification of key levers

Clear action plans

Diligent follow-up (improvement

activities and impact)

Meeting evaluations

Result focused high level coaching

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

BC x BC x+1 BC x+2 BC x+3

Performanceagainst targets

No of activities ontime

Business Control follow up

On time performance – R 12

84%

86%

88%

90%

92%

94%

96%

År månad

Laster

Tomma

Tillsammans

Year - month

Loaded

Empty

Combined

Departure check sign off Per week w 43 (2011) – w 43 (2012)

85 85

84

87

85 85

86

84

85

86

84

83 83 82

83

85

82

85

84

85

87 87

86 86

85

87 87

85

87

88

89 89

88

90

89

88 88

86

88 88 88

87 87

91

89 89 89

91 90

91

92

93

94

76

78

80

82

84

86

88

90

92

94

96

43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43