Intervenant : Alois BACHMANN, Managing Partner, Human Resources & Building, swiss IT-Factory 2ème Atelier Microtechniques & Innovation de Minnovarc les 27-28 octobre 2011 à La Neuveville, Suisse.

Transcript of Safety in special environments - solutions developed by swiss IT-Factory

Minnovarc, 28.10.2011

Safety in special environments

Agenda

• swiss IT-Factory• Project “Trenino” • Tunnel Transco Sedrun• Project “Rocon”• Project “Equipment Monitoring”

2

A combined evolution…

• 2009 MBO swiss IT-Factory

• 2007 / 2008 Implementation in Russia• 2006 Result of merger of two largest Swiss construction companies

goes live with solution within 9 months• 2005 Time Reporting + Calculation module• 2004 Equipment planning and disposal module• 2003 Tender functionality, GC + installation Tunnel Neat• 2002 Start of development

• > 10 years experience in services and industry 3

With a solution created by practicing experts for expert practice

… A proven ALL-IN-ONE solution

ResearchInvestment

Project concept/ Design

General planner / Engineering

Production OperationFacility Mgmt. Deconstruction

GCDevelopment Acquisition Development Financing / Investment Sales

GCGeneral Contractor Acquisition Project calculation Project realisation Project completion

C&EAcquisition /Production

Acquisition Tenderpreparation

Jobplanning Production Completion

C&ESupport Maintenance Centre Procurement

Building Management Preparation /Maintenance

CommercialBuilding

Management

Technical Building Management Services (IBM + IFM)

Finance and Controlling, Corporate Services & Support, Human Resources, Mobile

General contractorTotal contractor

Total solution provider (design & build)

… swiss IT-Factory‘s CIT market solution portfolio raises thetransparency and efficiency bar to a unique new level. ...

4

Our advantageous approach

target-performance analysis

rough concept detail concept

customizing customer-specific

enhancements customer-specific

additional development

documentation

Our innovation cycle supports you in facing your challenge

pilot migration roll out training go live

2nd level support additional training maintenance customer-specific

further development

quality assurance

5

Project “Trenino”

Customer Objectives

6

Improve Security Providing real time location

of the workers inside the tunnel

Provide a global overview the driver of the current situation: beyond human eyes sight

Centralize control

Increase Efficiency Reduce unnecessary

slowdown when the connecting galleries are free

Optimize the use of the resources

Project “Trenino”

Implemented Solutions

7

Improve Security Providing real time location

of the workers inside the tunnel

Provide a global overview the driver of the current situation: beyond human eyes sight

Centralize control

Increase Efficiency Reduce unnecessary

slowdown when the connecting galleries are free

Optimize the use of the resources

Installed in tunnel Transco Sedrun …

Highspeedlines crossing the Alps

8

… on a special environment …

Flat rail link through the Alps

9

… in the middle of the Alps.

SEDRUN – Heart piece of the NEW TRANSALPINE LINE

10

1. PERSON (Mine workers) identification and localisation (section)

2. TRAIN identification and localisation

3. EQUIPMENT identification and localisation (Drilling, Dredge, Dumper, etc.)

4. TRACK SWITCHER status and remote control

Mandatory informations on Trenino-Dashboard & Control Center

Objectives

11

Objectives - Scheme

12

3020

10

Km/h

Km13,000

Km12,675

Km12,350

Km12,025

Speed instruction (Person or equipment ahead)

Actual speed

Actual position

30

Km 11,985Section x1

No speed limit

Section x2 Section x3Section x1 Section x4 Section xn

Speed reduction Speed limit / Look out No speed limitNo speed limit

Section xn

Scenario No.1Tracking based on sectors

Actual speed Speed instruction (Person or equipment ahead)

Objectives - Scheme

13

3020

10

Km/h

Km13,000

Km12,675

Km12,350

Km12,025

Actual position

30

Km 11,985Section x1

No speed limit

Section x2 Section x3Section x1 Section x4 Section xn

Speed reduction Speed limit / Look out No speed limitNo speed limit

Section xn

Scenario No.1Tracking based on sectors

Sedrun – 2’500 meters under ground

Drill and blast

14

Sedrun - Tunnelwork

Concrete train and pump

15

Overview of the components

swiss IT-Factory 16

The Solution – RFID ...

Antenna

Active TAG 2.45 GHz / 13 MHz

RFID installed

swiss IT-Factory 17

... implemented

Antenna

Active TAG 2.45 GHz / 13 MHz

Project “Rocon”

Increasing efficiency and avoid additional investment

18

• To transport concret for final construction the questions was:Buy new wagons or optimize concret transportation with existing ones

• New investment for wagons (around 1’400’000 CHF ) was not necesary because…

• …existing security system can be used for traking positions of «Rocon» train and optimize the process

Analyzing transportation time …

Overview of one day and one Rocon train

19

… allows to optimize transport and …

Detailled analysis

20

… production

Rocon Shuttle and Concret processing

21

Project “Equipment Monitoring”

Equipment monitoring system

22

• Where are the main equipments in use?

• Trigger event while equipment passes observed sectors

• Preventive stealing

Project “Equipment Monitoring”

Equipment monitoring system

23

Equipment

Registering Tags

24

Equipment

Monitoring notifications, registered tags + video

25

SMSVideoEmail

Conclusion

One Business case 3 realised Projects

26

• Project “Trenino”

• Project “Rocon”

• Project “Equipment Monitoring”

Next steps…

Energy and more

27

28

Questions ?

Contact

We are looking forward to providingyou with additional information.