Safety in special environments - solutions developed by swiss IT-Factory
-
Upload
minnovarc -
Category
Technology
-
view
868 -
download
0
description
Transcript of Safety in special environments - solutions developed by swiss IT-Factory
![Page 1: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/1.jpg)
Minnovarc, 28.10.2011
Safety in special environments
![Page 2: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/2.jpg)
Agenda
• swiss IT-Factory• Project “Trenino” • Tunnel Transco Sedrun• Project “Rocon”• Project “Equipment Monitoring”
2
![Page 3: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/3.jpg)
A combined evolution…
• 2009 MBO swiss IT-Factory
• 2007 / 2008 Implementation in Russia• 2006 Result of merger of two largest Swiss construction companies
goes live with solution within 9 months• 2005 Time Reporting + Calculation module• 2004 Equipment planning and disposal module• 2003 Tender functionality, GC + installation Tunnel Neat• 2002 Start of development
• > 10 years experience in services and industry 3
With a solution created by practicing experts for expert practice
![Page 4: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/4.jpg)
… A proven ALL-IN-ONE solution
ResearchInvestment
Project concept/ Design
General planner / Engineering
Production OperationFacility Mgmt. Deconstruction
GCDevelopment Acquisition Development Financing / Investment Sales
GCGeneral Contractor Acquisition Project calculation Project realisation Project completion
C&EAcquisition /Production
Acquisition Tenderpreparation
Jobplanning Production Completion
C&ESupport Maintenance Centre Procurement
Building Management Preparation /Maintenance
CommercialBuilding
Management
Technical Building Management Services (IBM + IFM)
Finance and Controlling, Corporate Services & Support, Human Resources, Mobile
General contractorTotal contractor
Total solution provider (design & build)
… swiss IT-Factory‘s CIT market solution portfolio raises thetransparency and efficiency bar to a unique new level. ...
4
![Page 5: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/5.jpg)
Our advantageous approach
target-performance analysis
rough concept detail concept
customizing customer-specific
enhancements customer-specific
additional development
documentation
Our innovation cycle supports you in facing your challenge
pilot migration roll out training go live
2nd level support additional training maintenance customer-specific
further development
quality assurance
5
![Page 6: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/6.jpg)
Project “Trenino”
Customer Objectives
6
Improve Security Providing real time location
of the workers inside the tunnel
Provide a global overview the driver of the current situation: beyond human eyes sight
Centralize control
Increase Efficiency Reduce unnecessary
slowdown when the connecting galleries are free
Optimize the use of the resources
![Page 7: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/7.jpg)
Project “Trenino”
Implemented Solutions
7
Improve Security Providing real time location
of the workers inside the tunnel
Provide a global overview the driver of the current situation: beyond human eyes sight
Centralize control
Increase Efficiency Reduce unnecessary
slowdown when the connecting galleries are free
Optimize the use of the resources
![Page 8: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/8.jpg)
Installed in tunnel Transco Sedrun …
Highspeedlines crossing the Alps
8
![Page 9: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/9.jpg)
… on a special environment …
Flat rail link through the Alps
9
![Page 10: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/10.jpg)
… in the middle of the Alps.
SEDRUN – Heart piece of the NEW TRANSALPINE LINE
10
![Page 11: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/11.jpg)
1. PERSON (Mine workers) identification and localisation (section)
2. TRAIN identification and localisation
3. EQUIPMENT identification and localisation (Drilling, Dredge, Dumper, etc.)
4. TRACK SWITCHER status and remote control
Mandatory informations on Trenino-Dashboard & Control Center
Objectives
11
![Page 12: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/12.jpg)
Objectives - Scheme
12
3020
10
Km/h
Km13,000
Km12,675
Km12,350
Km12,025
Speed instruction (Person or equipment ahead)
Actual speed
Actual position
30
Km 11,985Section x1
No speed limit
Section x2 Section x3Section x1 Section x4 Section xn
Speed reduction Speed limit / Look out No speed limitNo speed limit
Section xn
Scenario No.1Tracking based on sectors
![Page 13: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/13.jpg)
Actual speed Speed instruction (Person or equipment ahead)
Objectives - Scheme
13
3020
10
Km/h
Km13,000
Km12,675
Km12,350
Km12,025
Actual position
30
Km 11,985Section x1
No speed limit
Section x2 Section x3Section x1 Section x4 Section xn
Speed reduction Speed limit / Look out No speed limitNo speed limit
Section xn
Scenario No.1Tracking based on sectors
![Page 14: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/14.jpg)
Sedrun – 2’500 meters under ground
Drill and blast
14
![Page 15: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/15.jpg)
Sedrun - Tunnelwork
Concrete train and pump
15
![Page 16: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/16.jpg)
Overview of the components
swiss IT-Factory 16
The Solution – RFID ...
Antenna
Active TAG 2.45 GHz / 13 MHz
![Page 17: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/17.jpg)
RFID installed
swiss IT-Factory 17
... implemented
Antenna
Active TAG 2.45 GHz / 13 MHz
![Page 18: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/18.jpg)
Project “Rocon”
Increasing efficiency and avoid additional investment
18
• To transport concret for final construction the questions was:Buy new wagons or optimize concret transportation with existing ones
• New investment for wagons (around 1’400’000 CHF ) was not necesary because…
• …existing security system can be used for traking positions of «Rocon» train and optimize the process
![Page 19: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/19.jpg)
Analyzing transportation time …
Overview of one day and one Rocon train
19
![Page 20: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/20.jpg)
… allows to optimize transport and …
Detailled analysis
20
![Page 21: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/21.jpg)
… production
Rocon Shuttle and Concret processing
21
![Page 22: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/22.jpg)
Project “Equipment Monitoring”
Equipment monitoring system
22
• Where are the main equipments in use?
• Trigger event while equipment passes observed sectors
• Preventive stealing
![Page 23: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/23.jpg)
Project “Equipment Monitoring”
Equipment monitoring system
23
![Page 24: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/24.jpg)
Equipment
Registering Tags
24
![Page 25: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/25.jpg)
Equipment
Monitoring notifications, registered tags + video
25
SMSVideoEmail
![Page 26: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/26.jpg)
Conclusion
One Business case 3 realised Projects
26
• Project “Trenino”
• Project “Rocon”
• Project “Equipment Monitoring”
![Page 27: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/27.jpg)
Next steps…
Energy and more
27
![Page 28: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/28.jpg)
28
Questions ?
![Page 29: Safety in special environments - solutions developed by swiss IT-Factory](https://reader038.fdocuments.net/reader038/viewer/2022110308/557fbc10d8b42a36118b4c99/html5/thumbnails/29.jpg)
Contact
We are looking forward to providingyou with additional information.
swiss IT-Factory LtdBinzmühlestrasse 11CH-8050 Zurich
Phone: +41 44 307 91 [email protected]
swiss IT-Factory 29