Rfid traçability in the manufacturing process based on the new epc standard. Bertrand Hanot, BHC

Post on 10-Dec-2014

2.324 views 4 download

description

 

Transcript of Rfid traçability in the manufacturing process based on the new epc standard. Bertrand Hanot, BHC

RFID Tracability integrated in OpenERP

Table of contents • RFID ? • Positionning

• R&D project

• Project Scope

• BHC Scope

• Project state

RFID ? • Radio Frequency Identification

• Save dataS into a tag

• Identification of one product not a type

• Barcode evolution

• 1 Scan more than one product scanned • Contactless

Positionning • RFID software already exists

• Only RFID software • Licensed software

• Global demand for a better Tracability

• Big Market

• OERP = SMB accesibility

R&D project • IT-Tirex

• 2012 to 2013

• Wallonia

• F.E.D.E.R.

• Multi compagny

Project Scope

• Read/Write RFID tag

• Not only for OERP • Multi system • Easier with OERP

• Centralized Information

• Respect standard

• EPC Global • We work with ALE

BHC Scope • Manage EPC code inside OERP

• EPC code = Tag RFID data

• Read/Write RFID tag from Reader through ALE

• Read RFID tag from Tirex

Architecture

Manage EPC code into OERP • Project first step

• Generate EPC code from OERP

• Template by product • Base on different value

• Product code or EAN • Company code • Product type code

• Create automatically the unique part

Manage EPC code into OERP • Manage partner EPC code

• Receive product with an existing code

Manage EPC code into OERP • Manage Template

Manage EPC code into OERP • Manage unique part

Manage EPC code into OERP • Manage unique part (Form view)

OERP Flow • Step 1: Receive product

OERP Flow • Step 2: Manufacturing – Products to Consume

OERP Flow • Step 3: Manufacturing – Finished Product

OERP Flow • Step 4: Delivery

OERP Flow • Show the EPC code flow

Read/Write RFID tag from Reader through ALE • RFID Hardware implement ALE standard

• Soap call to ALE

• Automatic dispatching for EPC code

Read RFID tag from Tirex • Similar to direct call to ALE

• Base on the same standard

• Interest ? • Save data in a db • Follow your product into other company

Project State • Work with OERP V6.0

• Migration V7: To Do

• POC OK

Question ? www.bhc.be

Join us on

www.bhc.be Follow us on