RFID Tracability integrated in OpenERP
Table of contents • RFID ? • Positionning
• R&D project
• Project Scope
• BHC Scope
• Project state
RFID ? • Radio Frequency Identification
• Save dataS into a tag
• Identification of one product not a type
• Barcode evolution
• 1 Scan more than one product scanned • Contactless
Positionning • RFID software already exists
• Only RFID software • Licensed software
• Global demand for a better Tracability
• Big Market
• OERP = SMB accesibility
R&D project • IT-Tirex
• 2012 to 2013
• Wallonia
• F.E.D.E.R.
• Multi compagny
Project Scope
• Read/Write RFID tag
• Not only for OERP • Multi system • Easier with OERP
• Centralized Information
• Respect standard
• EPC Global • We work with ALE
BHC Scope • Manage EPC code inside OERP
• EPC code = Tag RFID data
• Read/Write RFID tag from Reader through ALE
• Read RFID tag from Tirex
Architecture
Manage EPC code into OERP • Project first step
• Generate EPC code from OERP
• Template by product • Base on different value
• Product code or EAN • Company code • Product type code
• Create automatically the unique part
Manage EPC code into OERP • Manage partner EPC code
• Receive product with an existing code
Manage EPC code into OERP • Manage Template
Manage EPC code into OERP • Manage unique part
Manage EPC code into OERP • Manage unique part (Form view)
OERP Flow • Step 1: Receive product
OERP Flow • Step 2: Manufacturing – Products to Consume
OERP Flow • Step 3: Manufacturing – Finished Product
OERP Flow • Step 4: Delivery
OERP Flow • Show the EPC code flow
Read/Write RFID tag from Reader through ALE • RFID Hardware implement ALE standard
• Soap call to ALE
• Automatic dispatching for EPC code
Read RFID tag from Tirex • Similar to direct call to ALE
• Base on the same standard
• Interest ? • Save data in a db • Follow your product into other company
Project State • Work with OERP V6.0
• Migration V7: To Do
• POC OK
Question ? www.bhc.be