Renovation has begun!

Post on 25-May-2015

756 views 2 download

Tags:

Transcript of Renovation has begun!

CHURCH FLOOR PLAN

5/5/2013

NARTHEX / CHURCH ENTRY

5/5/2013

5/5/2013

BAPTISMAL FONT 5/5/2013

REAR NAVE FROM SIDE

5/5/2013

SANCTUARY 1 5/5/2013

SANCTUARY 2 5/5/2013

SANCTUARY from behind MUSIC 5/5/2013

REAR NAVE 5/5/2013

Worship Space Enhancement

Removal / Repair of exterior walls

New Reredos, ERC, and Tabernacle

wall with new Cross and Corpus

New porcelain tile Sanctuary floor

Clerestory window shades

Music Area improvements and

enlargement

New A/V equipment

Flooring replacement throughout

5/5/2013

Worship Space Enhancement-cont. Hearing -impaired loop system and

Sound improvements

South wall video screens for Priest,

Choir and Cantor

Kneelers on respaced Pews

Cleaning and refinishing of Pews

New HVAC system

New energy-efficient Lighting with

“theatrical” controls

New Liturgical Furnishings

Electronic Organ 5/5/2013

Project Scope - WORSHIP SPACE ENHANCEMENTS

•Design Modification to

Nave Doors

•New Baptismal Font

•Relocation of A/V control

console

•Replace floor tile at Narthex

and Lobby Vestibule

•Creation of Family Area

•Backlight relocated Mary-

Child Window

•New rear acoustic wall with

seasonal art work

•New acoustic ceiling

treatment

5/5/2013

Existing

Playfield

Electronic Carillon

Landscape Improvements

New Exterior Signage

Existing

Playground

Church School

Gym

111

111 Existing

Playfield

896 ft.

111 New

Bathrooms 111

414.5

ft.

111 New Sign

New Sign

Exterior

Enhancement

McDonald St.

Pau

lin

e S

t.

Gle

nd

ale

St.

5/5/2013

Project Scope Other Renovations

Lower Level Bathroom

Addition

Security System

Improvements

Main (School) entrance

Reception/Hospitality Office and Security Area

5/5/2013