Project Update Colorado Esplanade Project. Agenda Colorado Esplanade Project Current Work Overview.

Post on 02-Jan-2016

218 views 3 download

Tags:

Transcript of Project Update Colorado Esplanade Project. Agenda Colorado Esplanade Project Current Work Overview.

Project Update

Colorado Esplanade Project

Agenda

Colorado Esplanade Project

Current Work

Overview

Overview

Overview

WYNDHAM

TONGVA PARK

96 New Trees

-71 Mexican Sycamores

-13 Kentia Palms

-12 Rainbow Eucalyptus

17 Trees Relocated

23 Trees Protected in Place

5.3 New Trees per 1Tree Removed

Color Rendering of Proposed ProjectColorado Esplanade

Colorado Avenue Esplanade project will be complete before Expo begins carrying passengers

Color Rendering of Proposed ProjectColorado Esplanade

Festival lighting will be placed approximately every 25 feet. Outdoor furniture will be added.

Schedule

Awarded

Start Date

January 27, 2015

March 16, 2015

Duration: 12 months

Current Work

Current Work

Placing structural soil along north sidewalk.

Structural soil supports the sidewalk above it while encouraging root growth.

Current Work

Elements of the finished project: charcoal concrete

The driveway at 1st Court (alley) and Colorado

Avenue will feature the same concrete.

Current Work

Elements of the finished project: pavers

Current Work

Elements of the finished project: trees

The 96 new trees will be watered with recycled via drip water systems.

Current Work

Elements of the finished project: trees

Public Outreach

Explanation and Way Finding

Public OutreachPrint material

Phase A

WYNDAM

TONGVA PARK

Phase A

WYNDAM

TONGVA PARK

Phase B

Phase B will also have a pedestrian walkway and business access

Public Outreach

Visit businesses within 500-foot radius of project boundaries

-Interview for business profiles-Leave project FAQs

Distribute contact information

-Email: ned@Celtis.com -Hotline: 310.374.7570

Q&A

Colorado Esplanade