Project ADRIAIR – Pula Airport Forlì, 03 DEC 201 2

Post on 14-Feb-2016

37 views 0 download

Tags:

description

Project ADRIAIR – Pula Airport Forlì, 03 DEC 201 2. PULA AIRPORT. PULA AIRPORT. REGION OF ISTRA. REGION OF ISTRA. Ownership. Facts. Category 4 E RWY 09 - 27 RWY 2946 x 45 m ILS CAT I Apron – 10 self - maneuvering parking stands RFFS up to ICAO category 9 - PowerPoint PPT Presentation

Transcript of Project ADRIAIR – Pula Airport Forlì, 03 DEC 201 2

 

Project ADRIAIR – Pula Airport

Forlì, 03 DEC 2012

PULA AIRPORT

PULA AIRPORT

REGION OF ISTRA

REGION OF ISTRA

OwnershipREPUBLIC OF CROATIA 55 %

REGION OF ISTRIA 15 %

CITY OF POREČ 15 %

CITY OF PULA 8 %

CITY OF LABIN 3 %

CITY OF ROVINJ 2 %

CITY OF PAZIN 1 %

CITY OF BUJE 1 %

Facts

• Category 4 E

• RWY 09 - 27

• RWY 2946 x 45 m

• ILS CAT I

• Apron – 10 self-maneuvering parking stands

• RFFS up to ICAO category 9

• Intermodality, vicinity of Railway, Highway and seaport

The airport is able to deal within expected arrival / departure of 10 aircraft and 5000 passengers concurrently and is able to cope with an expected passengers throughput of 1.000.000

Pula Airport provides landing and handling

services for a variety of aircraft - from small jets

to Boeing 747-400 .

Seasonality

Vision

To provide competitive services at highest quality to passangers, airlines and other end users of our infrastructure and to ensure further development in order to cope with the future needs of civil aviation within the EU standards

Mission

*Ambitious plans to accommodate 450,000 passengers by 2013, growing to more than a million by 2022.

*To build partnerships on common projects

ADRIAIR Budget

WP0 €

WP1   €

WP2 €

WP3 €

WP4   €

WP5 €

WP6  €

WP7 €

TOTAL  €

0,00 25.600 8.000 3.000 76.500 500 1.060 700 115.360

WP 4 - AIR TRANSPORTATION SECURITY

Schengen – Non Schengen departure

WP 4 - AIR TRANSPORTATION SECURITY

Schengen – Non Schengen departure

WP 4 - AIR TRANSPORTATION SECURITY

Schengen – Non Schengen departure

WP 4 - AIR TRANSPORTATION SECURITY

Schengen – Non Schengen departure

Future

Expansion of passenger terminal building and the following objects New GA apron Installation CAT II precision approach lighting system New RFFS headquarters Construction of GA terminal

2012. – 2020.

Thank you for your kind attention