PREVENTATIVE MAINTENANCE
Protect the value of your fitness equipment
The ATTIVO Preventative Maintenance program is a great way to make sure your equipment is
performing in peak condition for your exercisers.
When your Fitness equipment is covered under a Preventative Maintenance Plan, our certified
technician will deliver regular, thorough cleaning, testing, and calibration which amounts to more
uptime for your equipment.
We offer a variety of service schedules to fit your needs. From monthly to annual arrangements, we
are there when you need us to keep your equipment up and running smoothly.
PREVENTATIVE MAINTENANCE
Regularly scheduled Preventative Maintenance visits. Choose: Monthly • Quarterly • Semi-Annual • Annual
Increases uptime of your equipment
Ability to schedule Preventative Maintenance visits at convenient time
Extends the life of the equipment
Reduces risk
Provides members with an optimum experience
Reduces club staffing requirements and/or 3rd party servicer expense
Factory-trained service technician performs comprehensive maintenance
Provides detailed diagnostic report following each Preventative Maintenance visit
ATTIVO INTERNATIONAL Co. Ltd 3rd Floor, HQ Building 193C3, Ba Trieu street,
Hai Ba Trung, Hanoi Tel: 84 435 265 999 www.attivointl.com
Email: cstech@attivointl.com
Email: cstech@attivointl.com
PREVENTATIVE MAINTENANCE CHECK LIST
Preventative maintenance is essential to extending the life of your equipment, increasing uptime, and
maintaining warranty coverage. Precor authorized servicers perform the procedures listed below by
equipment type. For more details on Maintenance Procedures refer to your Service Manual.
I. Maintenance Schedule for: TREADMILLS
DESCRIPTION SCHEDULE
Operation verification.
Verify unit sits level on floor.
Turn off power switch/circuit breaker and unplug the power cord from the wall outlet.
Inspect the power cord, make sure it is not damaged or coiled under the treadmill.
Vacuum underneath equipment.
Clean all surfaces.
Use a dry towel to clean the running belt and deck.
Verify the safety lanyard is in place and functional.
Clean the electronic console with a damp lint free cloth and dry completely.
Clean touch screen console (P80) with a diluted solution of one part 91% Isopropyl Alcohol to one part water on a damp lint free cloth and dry completely.
WEEKLY
Verify the stop clip is in place and functional.
Visually inspect the running deck and belt, make sure that the bed or belt is in good condition. Replace if necessary.
Inspect the power cord, make sure it is not damaged or underneath the treadmill. Verify the cord clamp is securely installed.
Perform functional test to verify all features are performing properly.
Clean the treadmill’s frame using a cloth dampened with an approved cleaning solution. Use a soft nylon scrub brush or a towel to clean the running belt.
Clean the floor underneath the Treadmill.
Wipe the surface of the electronic console.
Inspect visible welds, frame and wire connections.
Clean drive belt and pulley with a small wire brush.
MONTHLY
Email: cstech@attivointl.com
Inspect running belt and deck.
Check the tension, tracking and alignment of the running belt. Re-tension or adjust if necessary.
Check the tension of the drive belt, adjust if necessary.
Remove hood and vacuum the compartment and motor controller fan.
Perform the software diagnostics, check LED function and record the odometer reading.
Functionally test both the wireless and hand held heart rate.
QUARTERLY
*
Check the drive motor brushes, if applicable.
Lubricate lift motor screw.
SEMI-
ANNUAL**
II. Maintenance Schedule for: ELLIPTICALS CROSS TRAINER
IMPORTANT! USE EXTREME CAUTION when the rear cover is removed.
Serious injury could result if fingers are pinched between the flywheel spokes, crank arms, stair arms,
and drive weldment.
DESCRIPTION SCHEDULE
Operation verification.
Verify unit sits level on floor.
Vacuum underneath equipment.
Clean all surfaces.
Use soft nylon scrub brush to clean grooves on foot pedals.
Clean the electronic console with a damp lint free cloth and dry completely.
Clean touch screen console (P80) with a diluted solution of one part 91% Isopropyl Alcohol to one part water on a damp lint free cloth and dry completely.
WEEKLY
Inspect visible welds, frame and wire connections.
Inspect and lube lift motor screw if necessary.
Remove rear covers and vacuum with a low static vacuum around the electronic board.
Clean drive belts and pulleys.
MONTHLY
Email: cstech@attivointl.com
Verify the wheels run smoothly on the ramp.
Clean the ramps and wheels with an approved solution.
Inspect the power cord. Ensure that the cord is not pinched under the unit.
Vacuum carpet or “damp mop” the floor underneath the EFX.
Verify the HHHR is operational.
Record the usage hours.
Verify torque setting on crank arm and pillow blocks.
Inspect belts for tension and excessive wear.
Lubricate lift motor screw with a synthetic grease.
QUARTERLY*
Verify the battery voltage. SEMI-ANNUAL**
III. Maintenance Schedule for: ADAPTIVE MOTION TRAINER
IMPORTANT! USE EXTREME CAUTION when the rear cover is removed. Serious injury could result if fingers are pinched between the flywheel spokes, crank arms, stair arms, and drive weldment.
DESCRIPTION SCHEDULE
Operation verification.
Verify unit sits level on floor.
Vacuum underneath equipment.
Clean all surfaces.
Clean pedals, stairarms, upper arms and grips.
Clean the electronic console with a damp lint free cloth and dry completely.
Clean touch screen console (P80) with a diluted solution of one part 91% Isopropyl Alcohol to one part water on a damp lint free cloth and dry completely.
WEEKLY
Inspect visible welds, frame, and wire connections.
Lube lift motor screw.
Remove covers and vacuum with a low static vacuum around the electronic board.
Inspect tension and excessive wear on all belts and pulleys.
MONTHLY
Email: cstech@attivointl.com
Clean grooved drive belts and pulleys with a small wire brush.
Verify the pedals move smoothly in the vertical and horizontal axis.
Verify the HHHR is operational.
Record the usage hours.
Check the stability of machine if necessary adjust the leveling feet.
Check the tension of the drives and h-brake belts, adjust if necessary.
Inspect the gas spring shock.
Clean and lube the rear link bearings (AMT 100i only).
Verify the resistance changes through the entire range.
QUARTERLY*
Verify the battery voltage.
Visually inspect the belts for cracks, fraying or excessive wear.
SEMI-ANNUAL**
IV. Maintenance Schedule for: STATIONARY BIKES
DESCRIPTION SCHEDULE
Operation verification.
Verify unit sits level on floor.
Vacuum underneath equipment.
Clean all surfaces.
Clean the electronic console with a damp lint free cloth and dry completely.
Clean touch screen console (P80) with a diluted solution of one part 91% Isopropyl
Alcohol to one part water on a damp lint free cloth and dry completely.
WEEKLY
Inspect visible welds, frames and wire connections.
Remove covers and vacuum with a low static vacuum around the electronic board.
Clean drive belts and pulleys with a small wire brush.
Check that pedals turn freely and smoothly at resistance level 1.
Inspect the power adapter (if so equipped). Ensure that the cord is not pinched under the unit.
Verify the seat moves smoothly through the entire adjustment range and the position latch works correctly.
MONTHLY
Email: cstech@attivointl.com
Check the tension of the drives belts, adjust if necessary.
Verify the seat is secure.
Verify the battery charge voltage.
QUARTERLY*
Verify the battery voltage. SEMI-ANNUAL**
V. Maintenance Schedule for: CLIMBER
DESCRIPTION SCHEDULE
Operation verification.
Verify unit sits level on floor.
Vacuum underneath equipment.
Clean all surfaces.
Clean the electronic console with a damp lint free cloth and dry completely.
WEEKLY
Inspect visible welds, frame and wire connections.
Remove covers and vacuum with a low static vacuum around the electronic board.
Wipe down unit.
Check that pedals move freely and smoothly.
Inspect the power adapter (if so equipped). Ensure that the cord is not pinched under the unit.
Verify the HHHR works correctly.
MONTHLY
Inspect stairarms and bumpers for excessive wear.
Verify drive belts has proper tension and adjust if necessary.
Inspect springs.
Check the pedal stops are in good condition.
QUARTERLY*
Visually inspect the belts for cracks, fraying or excessive wear.
Verify the battery voltage.
Check the pedal belt clamps are torqued properly.
SEMI-ANNUAL**
Email: cstech@attivointl.com
VI. Maintenance Schedule for: STRENGTH
In addition to following the routine maintenance schedule outlined below you will want to do the
following daily:
Inspect cables and cable ends replacing upon any sign of wear.
Check for kinks, frayed wires or deterioration of the cable coating. Look for signs of wear
particularly at crimped ends of the cable and near pulleys.
IMPORTANT! Cables must be replaced immediately if they are damaged to avoid possible injury to
users.
DESCRIPTION SCHEDULE
Operation verification.
Verify unit sits level on floor.
Vacuum underneath equipment.
Clean all surfaces.
Lube guide rods, bushings, rod ends, linear bearings, shafts and pop pins.
Inspect cables and cable ends replacing upon any sign of wear.
WEEKLY
Inspect visible welds, frame, and cable connections.
Inspect cables and cable ends replacing upon any sign of wear.
Verify proper tension on all cables.
Inspect upholstery and pads for excessive wear.
Wipe down unit.
Verify the weight stack pin tether is attached.
Verify the instruction placard is attached and intact.
MONTHLY
Check the machine motion to ensure smooth through full range of travel.
Verify the adjustments of seats fully functional and lube.
QUARTERLY*
Verify cable tension.
Inspect all weight pins to ensure they are secure.
SEMI-ANNUAL**
.
Email: cstech@attivointl.com
VII. Maintenance Schedule for: PERSIONAL VIEWING SCREEN ( PVS)
DESCRIPTION SCHEDULE
Wipe the screen with an approved solution. (Do not use acidic cleaners).
Verify the channel up down and volume up down function.
Verify the numeric key pad can be used to change channels.
Verify the headphone jack works.
MONTHLY
Verify the home page is correctly programmed.
Verify the video image is clear on all channels.
Verify the audio matches the video.
QUARTERLY*
Verify the channel lineup matches the facility requirements.
Verify the decorative cable cover is fully intact and properly aligned.
SEMI-ANNUAL**
*Complete all inspections listed under Monthly above plus the following.
**Complete all inspections listed under Monthly and Quarterly above plus the following.
VIII. Maintenance Schedule for: WATER ROWER / CONCEPT II
DESCRIPTION SCHEDULE
Remove dust, dirt, sweat, and other substances of cage and blades
Wipe down the entire machine except for the chain
Test the rower and the display console
MONTHLY
Clean and lubricate the chain with a light chain oil QUARTERLY*
Check the battery if the display doesn’t work SEMI-ANNUAL**
*Complete all inspections listed under Monthly above plus the following.
**Complete all inspections listed under Monthly and Quarterly above plus the following.