Prabodhankar thackeray auditorium (Borivali)

Post on 22-Jan-2018

805 views 11 download

Transcript of Prabodhankar thackeray auditorium (Borivali)

PRABODHANKAR KESHAV SITARAM

THACKERAY NATYA MANDIR

LOCATION

850 m

INTRODUCTION

INFORMATION OF ACTIVITIES CARRIED OUT AT PRABODHANKAR K. S. THACKAREY NATAYAMDNIR

• 1. MAIN AUDITORIUM • 2. MINI AUDITORIUM • 3. ART GALLERY • 4. CONFERENCE HALL • 5. COMMUNITY HALL • 6. REHEARSAL ROOM • 7. RESIDENTIAL ROOM • 8. PAY & PARK .

• STARTING OF CONSTRUCTION – 1994• YEAR OF COMPLETION – 2000• INAUGURATION – 11TH MARCH 2001• CLOSED FOR RENEWATION – FEBRUARY 2009• REOPENING – NOVEMBER 2009

PLAN

SECTION

MAIN AUDITORIUM

• THIS AUDITORIUM IS AIR CONDITIONED.

• SEATING CAPACITY OF 1026, 726 FOR STALL AND 300 FOR BALCONY.

• MAIN STAGE DIMENSION – 40*58 FT

• BACK STAGE DIMENSION – 10*12 FT• CLEAR HEIGHT ABOVE STAGE – 25

FT• CLEAR HEIGHT OF AUDITORIUM

HALL – 30 FT• STAGE IS EQUIPPED WITH

ADVANCED ELECTRIC SYSTEM.

1 m

FLOORING

MINI AUDITORIUM• THIS AUDITORIUM IS AIR

CONDITIONED• SEATING CAPACITY OF 211. • MAIN STAGE DIMENSION – 25*40

FT• BACK STAGE DIMENSION – 8*10 FT• CLEAR HEIGHT ABOVE STAGE – 15

FT• CLEAR HEIGHT OF AUDITORIUM

HALL – 20 FT• STAGE IS EQUIPPED WITH

ADVANCED ELECTRIC SYSTEM.• THIS AUDITORIUM IS PROVIDED

FOR DRAMAS, SCHOOL ANNUAL FUNCTIONS, CHILDREN’S DRAMA, GET-TOGETHER, SEMINARS, ORCHESTRAS, ANNUAL MEETINGS ETC.

• ACOUSTICS SPECIALLY DESIGNED KEEPING AN AIM TO AVOID ECHO AND REFLECTION OF SOUND.

• IRREGULAR SURFACE FINISHES CREATED TO ABSORB THE SOUND AND NOT TO REFLECT.

• POROUS PLASTER BOARDS USED IN FALSE CEILING.

• THE MATERIAL USED ON THE SIDE WALLS IS AN INSPIRATION FROM JUTE.

• WOODEN FLOORING WITH SCREEDING TO BLOCK UNNECESSARY SOUND OF FEET.

• COCONUT POPSICLES (KATHYA) IS USED FOR ACOUSTIOCS ON THE WALL TO AVOID SOUND REFLECTION.

BACKSTAGE

• 2 CHANGING ROOMS AND 2 MAKE-UP ROOMS.

• SPACE FOR LOADING-UNLOADING OF THEATRE EQUIPMENTS.

• BACK SATGE ENTRY FOR ARTIST.

• STAIRCASE FOR REHEARSAL ROOM (FIRST FLOOR).

GREEN ROOMS

• 4 GREEN ROOMS.• EACH MEASURING 10*12

FT.• SEPARATE TOILET FOR

EACH GREEN ROOM.• DRESSERS WITH SPOT

LIGHTS.• IRONING TABLE.• CENTRAL SPACE FOR

REHEARSAL.

REHEARSAL ROOMS

• WOODEN FLOORING WITH SAND BELOW• MIRRORS ON ONE WALL• ROOM DIMENSION – 15*30 FT

CONTROL ROOM

• ELECTRICITY COMES FROM POWER SUPPLIER TO SITE SUBSTATION.

• THEN IT COMES TO CONTROL ROOM IN THREE PHASE OR ONE PHASE SYSTEM.

• FURTHER DIRECT SUPPLY TO THEATRE EQUIPMENTS.

• MAIN SWITCH OF DIESEL GENERATOR.

SITE SUBSTATION

AIR CONDITIONING• CENTRALISED AIR

CONDITIONING SYSTEM

CHILLER PUMP

CONDENSOR PUMP

AHU

FIRE FIGHTING

PAY & PARK

BASEMENT

CONFERENCE HALL

• IT IS DIVIDED IN THREE PARTS WITH SLIDING PARTITIONS AND CAN BE PROVIDED SEPARATELY FOR SMALL ACTIVITIES LIKE MEETINGS, SEMINARS, REHEARSALS ETC.

COMMUNITY HALL• THIS HALL IS SITUATED AT 3RD FLOOR

OF ‘A’ WING HAVING CAPACITY TO ACCOMMODATE ABOUT 300 PERSONS WHICH IS FOR PUBLIC FUNCTIONS

RESIDENTIAL ROOM

ART GALLERY