PEMBROKE STUDIOS
PROGRESS REPORT
AUGUST 2016
Internal stripping and removal of asbestos
Removal of all timber stud and plasterboard ,
including all ceilings
All debris to be removed from the premises in preparation for ground works.
Trial excavations to prove solid bedrock , suitable to
cast concrete bases accommodating steel uprights
All excavations have been inspected by Emile Sanan, the Structural Engineer appointed by YPG Developments Ltd