![Page 1: Pembroke Studios Progress Report August 2016](https://reader034.fdocuments.net/reader034/viewer/2022042619/58ce8fc21a28ab8c3b8b527b/html5/thumbnails/1.jpg)
PEMBROKE STUDIOS
PROGRESS REPORT
AUGUST 2016
![Page 2: Pembroke Studios Progress Report August 2016](https://reader034.fdocuments.net/reader034/viewer/2022042619/58ce8fc21a28ab8c3b8b527b/html5/thumbnails/2.jpg)
Internal stripping and removal of asbestos
![Page 3: Pembroke Studios Progress Report August 2016](https://reader034.fdocuments.net/reader034/viewer/2022042619/58ce8fc21a28ab8c3b8b527b/html5/thumbnails/3.jpg)
![Page 4: Pembroke Studios Progress Report August 2016](https://reader034.fdocuments.net/reader034/viewer/2022042619/58ce8fc21a28ab8c3b8b527b/html5/thumbnails/4.jpg)
Removal of all timber stud and plasterboard ,
including all ceilings
All debris to be removed from the premises in preparation for ground works.
![Page 5: Pembroke Studios Progress Report August 2016](https://reader034.fdocuments.net/reader034/viewer/2022042619/58ce8fc21a28ab8c3b8b527b/html5/thumbnails/5.jpg)
Trial excavations to prove solid bedrock , suitable to
cast concrete bases accommodating steel uprights
All excavations have been inspected by Emile Sanan, the Structural Engineer appointed by YPG Developments Ltd
![Page 6: Pembroke Studios Progress Report August 2016](https://reader034.fdocuments.net/reader034/viewer/2022042619/58ce8fc21a28ab8c3b8b527b/html5/thumbnails/6.jpg)