Oracle primavera eppm presentation

Post on 22-Apr-2015

2.201 views 8 download

description

 

Transcript of Oracle primavera eppm presentation

<Insert Picture Here>

Oracle Primavera Enterprise Project Portfolio

Management

Nakul Dhingra

Crown Systems (S) Pte Ltd

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Agenda

2

• Company Profile

• Oracle Primavera Overview

• Solution Demo

• Summary

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

COMPANY PROFILE

3

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

About Crown Systems

• Headquarter in Singapore since 1997 with offices in Brunei, Indonesia, Malaysia, Philippines and Vietnam

• Oracle Certified Advantage Partner

• Top Primavera ASEAN Partner for FY’12

• Oracle Project & Portfolio Management, Contract & Change Management, Project Risk Management, BIM Solution and Balanced Scorecard

• Expertise in Project Management, BIM, Consulting and Solution Implementation

• Expertise in over 1000 customer implementation & consulting in Singapore & more than 1500 customer engagement regionally.

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

6

FINANCIAL HEALTH

VALUED SERVICES

PRODUCT LEADERSHIP

Marine Engineering Engineering & Construction

Shell Chemicals

Power, Energy & Process

High Technology Others Research & Development

Our Client List (Project Management)

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

HARDWARE

TRAINING

SOFTWARE SOLUTION

CONSULTING

AUDIT

IMPLEMENTATION

Our Services

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

PRIMAVERA OVERVIEW

8

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Primavera Solution

• Complete project portfolio management solution

• Web based with real time access

• Role based functionalities

• Data resides in central repository

• Highly configurable user interface

• Enhance best practices and collaboration

9

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

© 2010 Oracle Corporation

Contract Management

Change Management

Contract Management

Claim Management

Issue Management

P6

Project Management

Risk Management

Project Scheduling

Resource Management

Oracle Universal Content Management (WebCenter)

(or other content management system)

P6 Analytics / P6 ERD / BI Reporting

Business Process Management

Integration with other core Applications (ERP, UPK, AutoVue, etc)

Portfolio Management

Primavera Integrated Program Management

Oracle PGBU Confidential

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

P6 EPPM OVERVIEW

12

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

EPS Overview (Enterprise Project

Structure)

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

EPS View in EPPM

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Overview of Dashboards

• Real-time view into performances

• User friendly, powerful and flexible

• Optimize management of all resources for maximum ROI

• Monitor and visualize project performance vs. plan

• Confidently make and keep project commitments

15

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Dashboards At-a-Glance

16

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Dashboards At-a-glance

17

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Overview of Portfolio

• Prioritize projects based on strategic objectives

• Make the best use of limited resources

• Improve coordination by collaborating across the

enterprise and beyond

• Manage large programs with multiple suppliers and

subcontractors

• Easily adjust the project mix when things change

• Ensure informed decisions and governance

• Anticipate change, risk and opportunity

18

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Portfolio Management Optimization

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Portfolio Management Optimization

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Overview of Planning & Scheduling

21

• Powerful scheduling capabilities

• Manage all types of projects

• Unlimited WBS and activities

• Baseline Analysis

• Resource Allocation

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Enterprise Project Structure

22

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Project Workspace

23

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Planning and Scheduling

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Activity Network Diagram

25

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Critical Path Methodology

26

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Resource loading

27

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

SUMMARY

28

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

Primavera Advantage

• Single User/Single Project Vs. Multiple User/Multiple

Project (Primavera)

• Web-based Project & Portfolio Management

• Application Security & Scalability

• Reporting & Analytics

• Workflow & Project Request Initiation

29

CROWN SYSTEMS PTE LTD –COPYRIGHT RESERVED

30

Question and Answer