optimized ISD PORTFOLIO-MARCH 2016

Post on 23-Jan-2018

175 views 6 download

Transcript of optimized ISD PORTFOLIO-MARCH 2016

RETAIL

SCHEMATIC DESIGN

DESIGN DEVELOPMENT

CONCEPT

ENTERTAINMENT

DESIGN PORTFOLIO - WORK SAMPLE

MIXED USED

ISD ARCHITECTS INC.ISD

01R

ET

AI

L

HAZELTON LANESMARKHAM, ONARCHITECT: PETROFF PARTNERSHIP ARCHITECTSDESIGNER: ISSAM A. SHUKOR, OAA

Upgrade of a front long facade of a well-known shopping mall in uptown Toronto. The main intention of the design intervention was to create cohesion and fluidity to the relatively long and outdated facade, punctuated by slick modern feature that will enhance its appearance, mainly, to zipping car traffic. A metal wavy tube of stainless steel was suggested to run a cross the elevation with its own lighting, sheen, and visually weightless glass canopies.

02R

ET

AI

L

DUFFERIN MALLTORONTO, ONTARIOARCHITECT: PETROFF PARTNERSHIP ARCHITECTSDESIGNER: ISSAM A. SHUKOR, OAA

Schematic design proposal for Duffer-in Mall front facade and main entrance retrofit which was implemented with some modification by EllisDon. The major flaw with old entrance was com-plete lack of identity, significance, and architectonic cohesion.

ENTRANCE SCHEMATIC DESIGN

ENTRANCE SCHEMATIC DESIGN SOUTH ELEVATION

SOUTH-WEST ELEVATION

NORTH-EAST ELEVATION

03MARKVILLE MALLMARKHAM, ON

ARCHITECT: PETROFF PARTNERSHIP ARCHITECTSDESIGNER: ISSAM A. SHUKORRE

TA

IL

Major regional shopping mall in Markville, Ontario. The aim of the facade retrofit was to integrate the vastly wide elevation looking over Highway 7. The entrances suffered a degrading due to outdated style and building envelope problems. The design theme focused on minimizing the scale of the "big box" and create a rhythm. This was created using EIF System with pilaster at intervals. The cornice at the top of the building created better rain shedding mechanism and architectural integrated the different masses and encapsulated Wall Mart store next door.

MARKVILLE MALLENTRANCE SCHEMATIC DESIGN

MARKVILLE MALLMARKHAM, ON

ARCHITECT: PETROFF PARTNERSHIP ARCHITECTSDESIGNER: ISSAM A. SHUKOR, OAA

SHOPPING CENTERMISSISSAUGA, ONHWY 401 & WINSTON CHURCHILLARCHITECTS: PETROFF PARTNERSHIP ARCHITECTSDESIGNER: ISSAM A SHUKOR

04RE

TAIL

Major regional shopping center in Mississauga, Ontario, with a feature-tower as a beacon to be noticed from high-way 401. The project was focused on creating a memorable (central) image that adds character, integrity, and locale, to grand strip-plaza projects, usually suffer from identity loss and feel of urban and architectural anchorage.

WESTMOUNT SHOPPING CENTERLONDON, ON.OXFORD SHOPPING CENTERSARCHITECTS: PETROFF PARTNERSHIP ARCHITECTSDESIGNER: ISSAM A SHUKOR

05RE

TAIL

Schematic proposal for new additions, includes, site planning, massing articulation, and urban space development for main shopping centre in London, Ontario.

06 THE COLOSSUS MOVIE THEATREVAUGHAN, ONARCHITECT: PAGE & STEELE ARCHITECTSDESIGNER: ISSAM A. SHUKOR, OAA

ENTE

RTA

INM

EN

T

THE COLOSSUS MOVIE THEATREThe Concept is based on Aliens’ spaceship landing on Earth. Materials used were metal, metallic laminates and glass. Floor finish was a carpet with continuous patterns of repeated computer motherboard layout printed on it. The middle pad was designed to contain a bar with pastel colors. All built-in furniture was either designed or chosen to serve the core design concept of space ship atmosphere.

THE COLOSSUS MOVIE THEATREVAUGHAN, ON

CINEPLEX ODEON CINEPLEX ODEON MOVIETHEATRE, TORONTO, ONARCHITECTS:PAGE & STEELE ARCHITECTSDESIGNER: ISSAM A SHUKOR

07EN

TERT

AIN

MEN

T

???? MOVIE THEATRE VAUGHAN, ON

ARCHITECT: PAGE & STEELE ARCHITECTSDESIGNER: ISSAM A. SHUKOR, OAA

CINEPLEX ODEON INTERIOR SCHEMATIC PROPOSAL

CINEPLEX ODEON

08 CALLOWAY REIT (BOLTON) INC.THE BEER STOREBOLTON, ONTARIO

RE

TA

IL

09 CALLOWAY REIT (ETOBICOKE- INDEX) INC.R

ET

AI

L

BUILDING D MULTI- RETAIL 150 NORTH QUEEN STREET

HOTEL FALCON GROUP 10M

IXE

D U

SE

MULTI-USE DEVELOPMENT11 M

IXE

D U

SE

OFFICE TOWER - EMPIRE HOLDINGS

SCHEMATIC STUDIES OFFICE TWOER AND PLAZA

Multi-Use large development in the suburbs (near the airport) of the developing city of Erbil in the north of Iraq. This development includes 20-storey office tower, a 5-star hotel, and a large shopping centre with its own portals and gates, plazas, cafes, and venues.

MULTI-USE DEVELOPMENTOFFICE TOWER - EMPIRE HOLDINGS

SCHEMATIC STUDIES OFFICE TWOER AND PLAZA

MULTI-USE DEVELOPMENTOFFICE TOWER - EMPIRE HOLDINGS

SCHEMATIC STUDIES OFFICE TWOER AND PLAZA

MULTI-USE DEVELOPMENTOFFICE TOWER - EMPIRE HOLDINGS

SCHEMATIC STUDIES OFFICE TWOER AND PLAZA

An industrial building proposal in Vaughn, Ontario. The schematic proposal aimed at creating an interesting office administration mass in front of, otherwise, huge industrial box. A curved stick curtain wall system or Captured Glazing system was suggested. The layout included a dou-ble-volume completely glazed open reception area with a metal staircase and concrete finished floor, in an attempt to utilize industrial brute aesthetics.

12 O

FF

ICE

BU

ILD

ING

GOTTARDO OFFICES CONCORD, ONTARIO

ARCHITECTS: PETROFF PARTNERSHIP ARCHITECTSIN CHARGE OF SCHEMATIC DESIGN: ISSAM A. SHUKOR