NDPA Overview Slides
September 4, 2020
Justin J KringstadGeological Engineer
Director
North Dakota Pipeline Authority
2
Bakken & Three Forks Formations
JJ Kringstad - North Dakota Pipeline Authority 2
Bakken Formation Three Forks Formation
3
Monthly Oil & Gas Production Change
JJ Kringstad - North Dakota Pipeline Authority 3
4
Holding Aug. 2020 Oil Constant at 1.23MMBPD (est.)Answering the question, “How many well completions to hold oil production flat?”
JJ Kringstad - North Dakota Pipeline Authority 4
Below Curve: Oil Production Dropping
Above Curve: Oil Production Increasing
5
Base Decline Challenges
JJ Kringstad - North Dakota Pipeline Authority 5
6
March to June 75+% M-O-M Oil Drop
JJ Kringstad - North Dakota Pipeline Authority 6(Non-Confidential Wells Only)
7JJ Kringstad - North Dakota Pipeline Authority 7(Non-Confidential Wells Only)
May & June ComparisonJune 2020May 2020
8
Vintage Year of Shut-In Wells – June 2020
JJ Kringstad - North Dakota Pipeline Authority 8(Non-Confidential Wells Only)
9
Wells Most Likely to Return Quickly? (May)
JJ Kringstad - North Dakota Pipeline Authority 9
1,881 Wells (28%)
WOR: 2 or Lower
BOPD: 50+
Total: 356,816 BOPD (70+%)
Shut-In
10
GOR Decrease From Returning Curtailed Wells
JJ Kringstad - North Dakota Pipeline Authority 10(Non-Confidential Wells Only)
Well Selection Criteria
Production Days in May: 0-1 Days
March Oil Production: >1 BOPD
June Oil Production: >1 BOPD
Pool: Bakken/Three Forks/Sanish
11
EIA Price Deck (Near Term)
JJ Kringstad - North Dakota Pipeline Authority 11
12
Shut-In Assumptions: EIA Price Deck
JJ Kringstad - North Dakota Pipeline Authority 12
13
ND Oil Production: EIA Price Deck (Near Term)
JJ Kringstad - North Dakota Pipeline Authority 13
14
ND Completions: EIA Price Deck (Near Term)
JJ Kringstad - North Dakota Pipeline Authority 14
Base & High Cases
Low Case
15
ND Oil Production: EIA Price Deck
JJ Kringstad - North Dakota Pipeline Authority 15
16
Monthly Completion Scenarios: Crude Oil
JJ Kringstad - North Dakota Pipeline Authority 16
17
Monthly Completion Scenarios: Wellhead Gas
JJ Kringstad - North Dakota Pipeline Authority 17
19 19
Williston Basin Oil Production & Export Capacity, BOPD
2121JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 21
Showing DAPL Outage
Unlikely Near Term
Scenario with Recent
Court Decisions
22
NDPA Production Forecast and Rail Transportation
JJ Kringstad - North Dakota Pipeline Authority 22
NDPA Base Case Oil Production Forecast (Green)
Pipeline Capacity Shortfall (Grey):
“Need” to Rail
Rail History (Red):
Exceeds “Need” - Delta Considered “Elective/Market Driven”
Assu
mes D
AP
L R
etu
rns t
o S
erv
ice S
ep
2021
Estimated Williston Basin Oil Transportation
23
23JJ Kringstad - North Dakota Pipeline Authority 23
24
Estimated ND Rail Export Volumes
JJ Kringstad - North Dakota Pipeline Authority 24
Rail Destinations Market Share (May 2020)
25
Data for Rail Destination Market Share Provided by the US Energy Information Administration
JJ Kringstad - North Dakota Pipeline Authority 25
26 26
27
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 27
28
ND Gas Production: EIA Price Deck
JJ Kringstad - North Dakota Pipeline Authority 28
29
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 29
30JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring Challenge
JJ Kringstad - North Dakota Pipeline Authority 30
31
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 31
32JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 32
33JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 33
34JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Future OutlookAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 34
Historical
Historical
Expected
Expected
35JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 35
Historical Expected
36JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 36
Historical Expected
9%
24%
37JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 37
Historical Expected
9%
38
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 38
Major Gas Pipeline and
Processing Infrastructure
WBI Transmission
Whiting
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 39
Bakken Natural Gas Infrastructure
4040JJ Kringstad - North Dakota Pipeline Authority 40
JJ Kringstad - North Dakota Pipeline Authority 41
Northern Border Pipeline
*Data Source: Northern Border
Northern Border BTU at Glen Ullin, ND
JJ Kringstad - North Dakota Pipeline Authority 42*Data Source: Northern Border
JJ Kringstad - North Dakota Pipeline Authority 43
NB Pipeline Interconnects With Known BTU Limits
NGPL: 1,065Midwestern:
1,100
Vector: 1,100Guardian: 1,100
JJ Kringstad - North Dakota Pipeline Authority 44
NB Pipeline Interconnects With BTU Limits > 1,100
NNG:
No Limit
ANR: 1,200
JJ Kringstad - North Dakota Pipeline Authority 45
NB Pipeline Interconnects With Ability to Add Limits
Horizon:
Ability to
Post Upper
Limit
JJ Kringstad - North Dakota Pipeline Authority 46
Northern Border – BTU Calculations*
*Includes Updated Tariff Timeline to 1,100
JJ Kringstad - North Dakota Pipeline Authority 47
Northern Border – BTU Calculations*
*Assumes Equivalent Net Replacement of 1,035 Canadian Gas
Does Not Include Market Based
Pairing Expenses
Est. Annual
JJ Kringstad - North Dakota Pipeline Authority 48
BTU Calculations to Meet Proposed 1,100 BTU Spec.Approximate Q1-20 BTU Breakdown Demo Pairing Exercise to Meet 1,100 or Less*
*Exact plant specifications are not publicly available and many assumptions
needed to be made for demo pairing. Table may contain errors.
Regional NGL Infrastructure
Kinder
JJ Kringstad - North Dakota Pipeline Authority 49
Ma
rath
on
Pe
tro
leu
m
NGL Pipeline Takeaway Options
50
5050JJ Kringstad - North Dakota Pipeline Authority 50
Justin J. Kringstad, DirectorNorth Dakota Pipeline Authority
600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840
Phone: (701)220-6227Fax: (701)328-2820
E-mail: jjkringstad@ndpipelines.com
Websites: www.pipeline.nd.gov
www.northdakotapipelines.com
Contact Information
JJ Kringstad - North Dakota Pipeline Authority 51