![Page 1: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/1.jpg)
NDPA Overview Slides
September 4, 2020
Justin J KringstadGeological Engineer
Director
North Dakota Pipeline Authority
![Page 2: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/2.jpg)
2
Bakken & Three Forks Formations
JJ Kringstad - North Dakota Pipeline Authority 2
Bakken Formation Three Forks Formation
![Page 3: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/3.jpg)
3
Monthly Oil & Gas Production Change
JJ Kringstad - North Dakota Pipeline Authority 3
![Page 4: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/4.jpg)
4
Holding Aug. 2020 Oil Constant at 1.23MMBPD (est.)Answering the question, “How many well completions to hold oil production flat?”
JJ Kringstad - North Dakota Pipeline Authority 4
Below Curve: Oil Production Dropping
Above Curve: Oil Production Increasing
![Page 5: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/5.jpg)
5
Base Decline Challenges
JJ Kringstad - North Dakota Pipeline Authority 5
![Page 6: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/6.jpg)
6
March to June 75+% M-O-M Oil Drop
JJ Kringstad - North Dakota Pipeline Authority 6(Non-Confidential Wells Only)
![Page 7: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/7.jpg)
7JJ Kringstad - North Dakota Pipeline Authority 7(Non-Confidential Wells Only)
May & June ComparisonJune 2020May 2020
![Page 8: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/8.jpg)
8
Vintage Year of Shut-In Wells – June 2020
JJ Kringstad - North Dakota Pipeline Authority 8(Non-Confidential Wells Only)
![Page 9: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/9.jpg)
9
Wells Most Likely to Return Quickly? (May)
JJ Kringstad - North Dakota Pipeline Authority 9
1,881 Wells (28%)
WOR: 2 or Lower
BOPD: 50+
Total: 356,816 BOPD (70+%)
Shut-In
![Page 10: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/10.jpg)
10
GOR Decrease From Returning Curtailed Wells
JJ Kringstad - North Dakota Pipeline Authority 10(Non-Confidential Wells Only)
Well Selection Criteria
Production Days in May: 0-1 Days
March Oil Production: >1 BOPD
June Oil Production: >1 BOPD
Pool: Bakken/Three Forks/Sanish
![Page 11: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/11.jpg)
11
EIA Price Deck (Near Term)
JJ Kringstad - North Dakota Pipeline Authority 11
![Page 12: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/12.jpg)
12
Shut-In Assumptions: EIA Price Deck
JJ Kringstad - North Dakota Pipeline Authority 12
![Page 13: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/13.jpg)
13
ND Oil Production: EIA Price Deck (Near Term)
JJ Kringstad - North Dakota Pipeline Authority 13
![Page 14: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/14.jpg)
14
ND Completions: EIA Price Deck (Near Term)
JJ Kringstad - North Dakota Pipeline Authority 14
Base & High Cases
Low Case
![Page 15: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/15.jpg)
15
ND Oil Production: EIA Price Deck
JJ Kringstad - North Dakota Pipeline Authority 15
![Page 16: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/16.jpg)
16
Monthly Completion Scenarios: Crude Oil
JJ Kringstad - North Dakota Pipeline Authority 16
![Page 17: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/17.jpg)
17
Monthly Completion Scenarios: Wellhead Gas
JJ Kringstad - North Dakota Pipeline Authority 17
![Page 18: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/18.jpg)
![Page 19: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/19.jpg)
19 19
![Page 20: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/20.jpg)
![Page 21: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/21.jpg)
Williston Basin Oil Production & Export Capacity, BOPD
2121JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 21
Showing DAPL Outage
Unlikely Near Term
Scenario with Recent
Court Decisions
![Page 22: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/22.jpg)
22
NDPA Production Forecast and Rail Transportation
JJ Kringstad - North Dakota Pipeline Authority 22
NDPA Base Case Oil Production Forecast (Green)
Pipeline Capacity Shortfall (Grey):
“Need” to Rail
Rail History (Red):
Exceeds “Need” - Delta Considered “Elective/Market Driven”
Assu
mes D
AP
L R
etu
rns t
o S
erv
ice S
ep
2021
![Page 23: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/23.jpg)
Estimated Williston Basin Oil Transportation
23
23JJ Kringstad - North Dakota Pipeline Authority 23
![Page 24: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/24.jpg)
24
Estimated ND Rail Export Volumes
JJ Kringstad - North Dakota Pipeline Authority 24
![Page 25: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/25.jpg)
Rail Destinations Market Share (May 2020)
25
Data for Rail Destination Market Share Provided by the US Energy Information Administration
JJ Kringstad - North Dakota Pipeline Authority 25
![Page 26: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/26.jpg)
26 26
![Page 27: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/27.jpg)
27
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 27
![Page 28: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/28.jpg)
28
ND Gas Production: EIA Price Deck
JJ Kringstad - North Dakota Pipeline Authority 28
![Page 29: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/29.jpg)
29
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 29
![Page 30: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/30.jpg)
30JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring Challenge
JJ Kringstad - North Dakota Pipeline Authority 30
![Page 31: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/31.jpg)
31
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 31
![Page 32: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/32.jpg)
32JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 32
![Page 33: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/33.jpg)
33JJ Kringstad - North Dakota Pipeline Authority
Solving the Flaring ChallengeAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 33
![Page 34: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/34.jpg)
34JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Future OutlookAssumes Current Technology – Enhanced Oil Recovery Not Included
JJ Kringstad - North Dakota Pipeline Authority 34
Historical
Historical
Expected
Expected
![Page 35: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/35.jpg)
35JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 35
Historical Expected
![Page 36: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/36.jpg)
36JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 36
Historical Expected
9%
24%
![Page 37: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/37.jpg)
37JJ Kringstad - North Dakota Pipeline Authority
Gas Processing Capacity & Spare Capacity
JJ Kringstad - North Dakota Pipeline Authority 37
Historical Expected
9%
![Page 38: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/38.jpg)
38
Natural Gas Update
Production
• Technology
• Markets
Gathering
• Capacity
• Connections
Processing
• Capacity
• Location
Transmission
• Dry Gas
• Natural Gas Liquids
JJ Kringstad - North Dakota Pipeline Authority 38
![Page 39: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/39.jpg)
Major Gas Pipeline and
Processing Infrastructure
WBI Transmission
Whiting
JJ Kringstad - North Dakota Pipeline AuthorityJJ Kringstad - North Dakota Pipeline Authority 39
![Page 40: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/40.jpg)
Bakken Natural Gas Infrastructure
4040JJ Kringstad - North Dakota Pipeline Authority 40
![Page 41: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/41.jpg)
JJ Kringstad - North Dakota Pipeline Authority 41
Northern Border Pipeline
*Data Source: Northern Border
![Page 42: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/42.jpg)
Northern Border BTU at Glen Ullin, ND
JJ Kringstad - North Dakota Pipeline Authority 42*Data Source: Northern Border
![Page 43: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/43.jpg)
JJ Kringstad - North Dakota Pipeline Authority 43
NB Pipeline Interconnects With Known BTU Limits
NGPL: 1,065Midwestern:
1,100
Vector: 1,100Guardian: 1,100
![Page 44: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/44.jpg)
JJ Kringstad - North Dakota Pipeline Authority 44
NB Pipeline Interconnects With BTU Limits > 1,100
NNG:
No Limit
ANR: 1,200
![Page 45: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/45.jpg)
JJ Kringstad - North Dakota Pipeline Authority 45
NB Pipeline Interconnects With Ability to Add Limits
Horizon:
Ability to
Post Upper
Limit
![Page 46: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/46.jpg)
JJ Kringstad - North Dakota Pipeline Authority 46
Northern Border – BTU Calculations*
*Includes Updated Tariff Timeline to 1,100
![Page 47: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/47.jpg)
JJ Kringstad - North Dakota Pipeline Authority 47
Northern Border – BTU Calculations*
*Assumes Equivalent Net Replacement of 1,035 Canadian Gas
Does Not Include Market Based
Pairing Expenses
Est. Annual
![Page 48: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/48.jpg)
JJ Kringstad - North Dakota Pipeline Authority 48
BTU Calculations to Meet Proposed 1,100 BTU Spec.Approximate Q1-20 BTU Breakdown Demo Pairing Exercise to Meet 1,100 or Less*
*Exact plant specifications are not publicly available and many assumptions
needed to be made for demo pairing. Table may contain errors.
![Page 49: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/49.jpg)
Regional NGL Infrastructure
Kinder
JJ Kringstad - North Dakota Pipeline Authority 49
Ma
rath
on
Pe
tro
leu
m
![Page 50: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/50.jpg)
NGL Pipeline Takeaway Options
50
5050JJ Kringstad - North Dakota Pipeline Authority 50
![Page 51: NDPA Overview Slides...2020/09/04 · NDPA Overview Slides September 4, 2020 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority 2 Bakken & Three Forks](https://reader035.fdocuments.net/reader035/viewer/2022070110/60481f552b2ffd63bf1196c4/html5/thumbnails/51.jpg)
Justin J. Kringstad, DirectorNorth Dakota Pipeline Authority
600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840
Phone: (701)220-6227Fax: (701)328-2820
E-mail: [email protected]
Websites: www.pipeline.nd.gov
www.northdakotapipelines.com
Contact Information
JJ Kringstad - North Dakota Pipeline Authority 51