Modern C4I systems: BURDEN OR BENEFIT? · NRF (2004/2005) HQ’s C4I EXPERIENCE TITAAN HEROS. C4I...

Post on 11-May-2021

15 views 0 download

Transcript of Modern C4I systems: BURDEN OR BENEFIT? · NRF (2004/2005) HQ’s C4I EXPERIENCE TITAAN HEROS. C4I...

Modern C4I systems:Modern C4I systems:

BURDEN OR BENEFIT?BURDEN OR BENEFIT?

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE 01 DEC 2005

2. REPORT TYPE N/A

3. DATES COVERED -

4. TITLE AND SUBTITLE Modern C4I Systems: BURDEN OR BENEFIT?

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Staff 1 GE/NL Corps Hindenburgplatz 71 48143 Muenster GERMANY

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution unlimited

13. SUPPLEMENTARY NOTES See also ADM202135, RTO-MP-IST-042. Coalition C4ISR Architectures and Information ExchangeCapabilities (Les architectures C4ISR et les capacites d’echange d’information en coalition)., The originaldocument contains color images.

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT

UU

18. NUMBEROF PAGES

17

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

IT CREDENTIALS:IT CREDENTIALS:

PHILIPS PDP 11PHILIPS PDP 11

SCHNEIDER (2x FD NO HD)SCHNEIDER (2x FD NO HD)

INTEL PENTIUM 2INTEL PENTIUM 2

HP JORNADAHP JORNADA

MILITARY CREDENTIALS:MILITARY CREDENTIALS:

HQ 1 GE/NL CORPS (est 1995)

2 FRAMEWORK NATIONS2 FRAMEWORK NATIONS

10 NATIONALITIES10 NATIONALITIES

HRF HQ (2002)HRF HQ (2002)

HQ ISAF III (2003)HQ ISAF III (2003)

NRF (2004/2005)NRF (2004/2005)

HQHQ’’s C4I EXPERIENCEs C4I EXPERIENCE

TITAANTITAAN

HEROSHEROS

C4I REQUIREMENTS

C4I REQUIREMENTS

C4I TRIPWIRES

INFORMATION ILLUSIONINFORMATION ILLUSION

C41 TRIPWIRES

MICROMANAGEMENTMICROMANAGEMENT

C41 TRIPWIRES

INFORMATION OVERLOADINFORMATION OVERLOAD

C41 TRIPWIRES

SPEED OF DECISIONSPEED OF DECISION

VISION 1954VISION 1954

CONCLUSION

C4I : BURDEN OR BENEFIT?C4I : BURDEN OR BENEFIT?

MODERN C4I: BURDEN OR BENEFIT?

RTO-MP-IST-042 KN1 - 1

UNCLASSIFIED/UNLIMITED

UNCLASSIFIED/UNLIMITED

Modern C4I Systems: BURDEN OR BENEFIT?

BGen. Rob Bertholee Staff 1 GE/NL Corps Hindenburgplatz 71

48143 Muenster GERMANY

racb@chello.nl

Presented at the RTO IST Symposium on “Coalition C4ISR Architectures and Information Exchange Capabilities”, held in The Hague, The Netherlands, 27-28 September 2004, and published in RTO-MP-IST-042.

This paper was received as a PowerPoint presentation without supporting text.

Modern C4I Systems: BURDEN OR BENEFIT?

KN1 - 2 RTO-MP-IST-042

UNCLASSIFIED/UNLIMITED

UNCLASSIFIED/UNLIMITED