Manitoba Hydro Place

Post on 20-Jun-2015

185 views 3 download

Tags:

description

A partial requirement on Building Utilities

Transcript of Manitoba Hydro Place

MANITOBA HYDRO PLACE

Architects: Kuwabara Payne McKenna Blumberg Architects (Design Architects) / Smith Carter Architects + Engineers (Executive Architects) / Transsolar (Climate Engineers)

Architects of Record: Smith Carter Architects and EngineersLocation: Winnipeg, Manitoba, CanadaProject Area: 64,590 sqmProject Year: 2009

FIVE GOALS:1. A supportive, healthy workplace environment for employees of Manitoba Hydro.

2. A sustainable design inclusive of LEED® Gold rating and a 60% reduction in energy consumption.

3. Signature architecture integrated throughout the building at different scales from street level to roof.

4. A high level of urban design integration to revitalize downtown Winnipeg.

5. To achieve a cost effective building design solution that has measurable benefits to Manitoba Hydro in terms of comfort, operations, and maintenance.

• Wintergardens

• Water Features

• Thermal Mass

• Solar Chimney

Under Construction

• Biodynamic Double Facade

• Daylighting

• Daylighting

• Displacement Ventilation

• Displacement Ventilation

• Geothermal

MANITOBA HYDRO PLACE